Day 168 – Friday 3rd March 2017 – phase 2
Extremely wet day today, but due to canopy over the house, the roofer was still able to work.
![royston-roofer](https://springdalegarden.com/wp-content/uploads/2017/03/royston-roofer.jpg?w=625)
Royston Collier has been the roofer for phase 2
![royston-roofer-back-of-van](https://springdalegarden.com/wp-content/uploads/2017/03/royston-roofer-back-of-van.jpg?w=625)
Royston the roofer back-of-van
![royston-tiling-the-sloping-sides-of-the-gables](https://springdalegarden.com/wp-content/uploads/2017/03/royston-tiling-the-sloping-sides-of-the-gables.jpg?w=625)
royston-tiling-the-sloping-sides-of-the-gables
![ridge-tiling](https://springdalegarden.com/wp-content/uploads/2017/03/ridge-tiling.jpg?w=625)
Tiling of all the ridges around the flat roof
![ridge-tiling-2](https://springdalegarden.com/wp-content/uploads/2017/03/ridge-tiling-2.jpg?w=625)
ridge-tiling-2
![ridge-tiling-pic2](https://springdalegarden.com/wp-content/uploads/2017/03/ridge-tiling-pic2.jpg?w=625)
ridge-tiling-pic2
![ridge-tiles-on-scaffolding](https://springdalegarden.com/wp-content/uploads/2017/03/ridge-tiles-on-scaffolding.jpg?w=625)
ridge-tiles-on-scaffolding
![ensuite-bathroom-plastered](https://springdalegarden.com/wp-content/uploads/2017/03/ensuite-bathroom-plastered.jpg?w=625)
Ensuite bathroom has been plastered
![top-of-stair-wall-plastered-wires-are-for-the-top-of-the-stairs-lights](https://springdalegarden.com/wp-content/uploads/2017/03/top-of-stair-wall-plastered-wires-are-for-the-top-of-the-stairs-lights.jpg?w=625)
Top of stair wall plastered. Wires are for the top of the stairs light switches (Joe O’Hara – Ballan Electrical)
![plastering-in-the-study-so-far-velux-window-visible](https://springdalegarden.com/wp-content/uploads/2017/03/plastering-in-the-study-so-far-velux-window-visible.jpg?w=625)
Plastering in the study so far. Velux window visible
![formation-of-cupboard-over-the-staircase-accessed-from-study](https://springdalegarden.com/wp-content/uploads/2017/03/formation-of-cupboard-over-the-staircase-accessed-from-study.jpg?w=625)
Formation of the over the stairs cupboard, now all boxed in and plaster-boarded, accessed from the study
![very-high-ceiling-over-where-the-staircase-will-be-all-plastered](https://springdalegarden.com/wp-content/uploads/2017/03/very-high-ceiling-over-where-the-staircase-will-be-all-plastered1.jpg?w=625)
very-high-ceiling-over-where-the-staircase-will-be. Top ceiling is now all plastered. Small hole is for light.
![old-porch-roof-has-had-noggins-put-in-for-extra-support](https://springdalegarden.com/wp-content/uploads/2017/03/old-porch-roof-has-had-noggins-put-in-for-extra-support.jpg?w=625)
Old Porch Roof has had noggins inserted for extra strength
![old-porch-roof-with-noggins-inserted](https://springdalegarden.com/wp-content/uploads/2017/03/old-porch-roof-with-noggins-inserted.jpg?w=625)
old-porch-roof-with-noggins-inserted