Day 169 – Saturday 4th March 2017 – phase 2

Day 169 – Saturday 4th March 2017 – phase 2

view-of-canopy-from-the-back-garden-showing-tiling-of-roof-so-far-some-will-be-replaced-in-addition-as-an-extra-to-the-new-build-to-ensure-the-roof-is-all-water-tight

view-of-canopy-from-the-back-garden-showing-tiling-of-roof-so-far-some-will-be-replaced-in-addition-as-an-extra-to-the-new-build-to-ensure-the-roof-is-all-water-tight

royston-the-roofer-has-coninued-to-work-on-the-roof-today-completing-a-large-section-of-the-roof-next-to-the-dormer

Royston-the-roofer-has-continued-to-work-on-the-roof-today-completing-a-large-section-of-the-roof-next-to-the-dormer

royston-the-roofer-has-coninued-to-work-on-the-roof-today-completing-a-large-section-of-the-roof-next-to-the-dormer-pic-2

Royston-the-roofer-has-continued-to-work-on-the-roof-today-completing-a-large-section-of-the-roof-next-to-the-dormer-pic-2

progress-on-the-roof-so-far

progress-on-the-roof-so-far

progress-on-the-roof-so-far-pic-2

progress-on-the-roof-so-far-pic-2

view-from-kymin-walk

View from Kymin walk –  House with canopy still just visible

Advertisements

Day 168 – Friday 3rd March 2017 – phase 2

Day 168 – Friday 3rd March 2017 –   phase 2

Extremely wet day today, but due to canopy over the house, the roofer was still able to work.

royston-roofer

Royston Collier has been the roofer for phase 2

royston-roofer-back-of-van

Royston the roofer back-of-van

royston-tiling-the-sloping-sides-of-the-gables

royston-tiling-the-sloping-sides-of-the-gables

ridge-tiling

Tiling of all the ridges around the flat roof

ridge-tiling-2

ridge-tiling-2

ridge-tiling-pic2

ridge-tiling-pic2

ridge-tiles-on-scaffolding

ridge-tiles-on-scaffolding

ensuite-bathroom-plastered

Ensuite bathroom has been plastered

top-of-stair-wall-plastered-wires-are-for-the-top-of-the-stairs-lights

Top of stair wall plastered. Wires are for the top of the stairs light switches (Joe O’Hara – Ballan Electrical)

plastering-in-the-study-so-far-velux-window-visible

Plastering in the study so far. Velux window visible

formation-of-cupboard-over-the-staircase-accessed-from-study

Formation of the over the stairs cupboard, now all boxed in and plaster-boarded, accessed from the study

very-high-ceiling-over-where-the-staircase-will-be-all-plastered

very-high-ceiling-over-where-the-staircase-will-be. Top ceiling is now all plastered. Small hole is for light.

old-porch-roof-has-had-noggins-put-in-for-extra-support

Old Porch Roof has had noggins inserted for extra strength

old-porch-roof-with-noggins-inserted

old-porch-roof-with-noggins-inserted

Day 35 – Saturday 27th August 2016

Day 35 – Saturday 27th August 2016

Although the weekend the roofer continued work today.

Roof Progress

Roof Progress

Roof Progress 2

Roof Progress 2

Roof Progress 3

Roof Progress 3

View up to new ceiling height in kitchen

View up to new ceiling height in kitchen

View up to new ceiling height

View up to new ceiling height

View down to new step area and new kitchen extension

View down to new step area and new kitchen extension