Tag Archives: porch

Day 170 – Monday 6th March 2017 – phase 2

Day 170 – Monday 6th March 2017 – phase 2

Wooden beam framework in old porch area to create a new floor which will be level with the old hall dining room.

Wooden beam framework in old porch area to create a new floor which will be level with the old hall dining room.

wallpaper still to be stripped off on this side of new sun lounge

wallpaper still to be stripped off on this side of new sun lounge

View towards the old porch, this room will be the new sun lounge, old red paint from years gone by

View towards the old porch, this room will be the new sun lounge, old red paint from years gone by

Old hallway now being stripped of old wallpaper and walls being levelled for plaster skimming

Old hallway now being stripped of old wallpaper and walls being levelled for plaster skimming. Lighter shade of plaster shows where a door has been at some time in the past

New framework to raise up floor in the old porch

New framework to raise up floor in the old porch

plastering in the new study - wires visible from Joe's electrical work for plug socket and Pipes for radiators that Marcus is fitting

plastering in the new study – wires visible from Joe’s electrical work for plug socket and Pipes for radiators that Marcus is fitting

plastering in the new study pic 2

plastering in the new study pic 2

plastering in the new study around the velux window

plastering in the new study around the velux window

plastering in the new study around the newly created cupboard

plastering in the new study around the newly created cupboard

Day 160 – Tuesday 21st February 2017 – phase 2

Day 160 – Tuesday 21st February 2017 – phase 2

view-of-house-porch-front-removed

View of house from the front – Porch removed

front-porch-door-and-panels-removed

Front porch door and panels removed

front-porch-door-and-panels-removed-pic2

front-porch-door-and-panels-removed-pic2

skip-with-the-contents-of-the-front-of-the-porch

skip-with-the-contents-of-the-front-of-the-porch

new-steel-beam-to-support-new-front-room-installed-over-the-porch-area

New steel beam installed over the front foundation wall to support the new front of house and to ensure there is no sinking

old-porch-new-steel-beam

old-porch with new-steel-beam in place

new-steel-beam-to-support-front-of-the-house-over-foundation-wall

new-steel-beam-to-support-front-of-the-house-over-foundation-wall

porch-from-above

porch-from-above

dormer-progress-so-far

dormer-progress-so-far

side-view-of-dormer-and-insulation

side-view-of-dormer-and-insulation

side-view-of-dormer-and-insulation-pic-2

side-view-of-dormer-and-insulation-pic-2

waste-pipe-from-new-ensuite-bathroom

waste-pipe-from-new-ensuite-bathroom

study-with-plasterboard

study-with-plasterboard

radiator-pipes-for-new-radiator-under-large-window-in-upstairs-bedroom

radiator-pipes-for-new-radiator-under-large-window-in-upstairs-bedroom

plasterboard-delivery-for-new-upstairs

plasterboard-delivery-for-new-upstairs

plasterboard-inside-new-bedroom

plasterboard-inside-new-bedroom

Day 145 – Tuesday 31st January 2017 – phase 2

Day 145 – Tuesday 31st January 2017 – phase 2

Roof tiles all stripped off today under supervision from bat licensed ecologist. Balcony window taken out and flat roof taken off.  From phase 1, worktop for new kitchen which had been measured and cut to size has now been fitted.

newly-fitted-worktop-for-kitchen-and-island-unit

newly-fitted-worktop-for-kitchen-and-island-unit

new-worktop-fitted

New worktop fitted – a transformation

balcony-window-now-removed-view-through-to-new-bedroom-floor

balcony-window-now-removed-view-through-to-new-bedroom-floor and through to hall below

left-side-of-house-tiles-stripped-under-supervision-of-a-bat-licensed-ecologist

left-side-of-house-tiles-stripped-under-supervision-of-a-bat-licensed-ecologist

left-and-front-stripped-of-tiles

left-and-front-stripped-of-tiles

right-side-of-house-tiles-all-stripped-off

right-side-of-house-tiles-all-stripped-off

view-of-stripped-roof-from-left

view-of-stripped-roof-from-left

view-into-house-over-old-porch

view-into-house-over-old-porch

view-of-what-will-be-new-bedroom-floor

view-of-what-will-be-new-bedroom-floor

view-through-gap-that-will-be-middle-window-in-the-bedroom

view-through-gap-that-will-be-middle-window-in-the-bedroom

view-through-gap-which-will-be-new-ensuite-bathroom-window

view-through-gap-which-will-be-new-ensuite-bathroom-window

top-of-roof-now-to-compare-later-when-new-roof-is-on

top-of-roof-now-to-compare-later-when-new-roof-is-on

view-from-front-through-to-house-from-scaffolding-of-the-inside-where-the-old-balcony-has-been-removed

view-from-front-through-to-house-from-scaffolding-of-the-inside-where-the-old-balcony-has-been-removed

gap-from-below-seen-in-previous-pictures-as-light-shining-through-from-house

gap-from-below-seen-in-previous-pictures-as-light-shining-through-from-house

tiles-all-stacked-to-be-reused-for-new-roof

tiles-all-stacked-to-be-reused-for-new-roof

tiles-all-stacked-to-be-reused-for-new-roof-down-side-of-scaffolding

tiles-all-stacked-to-be-reused-for-new-roof-down-side-of-scaffolding

Day 143 – Saturday 28th January 2017 – phase 2

Day 143 – Saturday 28th January 2017 – phase 2

Split levels – ground floor and new upstairs visible together

picure-showing-opening-for-the-staircase-the-floor-below-and-the-upstairs-area-expanding

picure-showing-opening-for-the-staircase-the-floor-below-and-the-upstairs-area-expanding

new-upstairs-area-around-where-the-top-of-the-staircase-will-be

new-upstairs-area-around-where-the-top-of-the-staircase-will-be

this-is-the-old-balcony-window-still-intact-at-present-with-gap-to-hall-below-just-in-front-through-the-window-the-small-steel-can-be-seen-staddling-the-porch-to-form-the-new-front-of-the-house

this-is-the-old-balcony-window-still-intact-at-present-with-gap-to-hall-below-just-in-front-through-the-window-the-small-steel-can-be-seen-straddling-the-porch-to-form-the-new-front-of-the-house

photo-through-gap-in-the-new-flooring-showing-the-inner-porch-door-below

photo-through-gap-in-the-new-flooring-showing-the-inner-porch-door-below

steel-beam-number-1-showing-it-on-the-inside-of-house-from-upstairs-area

steel-beam-number-1-showing-it-on-the-inside-of-house-from-upstairs-area

view-from-the-orchard-field-down-over-the-the-house-where-the-canopy-can-be-seen-over-the-top

view-from-the-orchard-field-down-over-the-the-house-where-the-canopy-can-be-seen-over-the-top

view-of-back-of-house-new-kitchen-and-canopy-visible-over-the-top-of-main-house-pic-2

view-of-back-of-house-new-kitchen-and-canopy-visible-over-the-top-of-main-house-pic-2

view-of-back-of-house-new-kitchen-and-canopy-visible-over-the-top-of-main-house

view-of-back-of-house-new-kitchen-and-canopy-visible-over-the-top-of-main-house

view-of-back-of-house-and-new-kitchen

view-of-back-of-house-and-new-kitchen

Day 133 – Wednesday 18th January 2017 – phase 2

Day 133 – Wednesday 18th January 2017 – phase 2

progress-after-day-133-new-wall-going-up-over-new-supporting-beam-at-front-of-house

progress-after-day-133-new-wall-going-up-over-new-supporting-beam-at-front-of-house

front-of-house-so-far-with-new-wall

front-of-house-so-far-with-new-wall

new-wall-over-new-supporting-beam-over-old-porch-roof

new-wall-over-new-supporting-beam-over-old-porch-roof

another-view-of-new-wall-over-old-porch

another-view-of-new-wall-over-old-porch

new-supporting-beam-as-seen-from-right-side-of-scaffolding

new-supporting-beam-as-seen-from-right-side-of-scaffolding

new-wall-over-right-side-of-house-front

new-wall-over-right-side-of-house-front

left-side-of-house-from-scaffolding-showing-new-wall-going-up-over-the-front-of-the-house-on-the-new-support-beam

left-side-of-house-from-scaffolding-showing-new-wall-going-up-over-the-front-of-the-house-on-the-new-support-beam

left-side-where-tiles-were-removed-yesterday-for-insertion-of-the-large-supporting-steel-next-week

left-side-where-tiles-were-removed-yesterday-for-insertion-of-the-large-supporting-steel-next-week

area-of-roof-where-tiles-were-removed-yesterday-with-bat-ecologists-this-is-where-a-huge-steel-beam-will-be-inserted-into-the-house-for-the-support-of-the-roof-and-the-new-wall-will-be-built-on-top

area-of-roof-where-tiles-were-removed-yesterday-with-bat-ecologists-this-is-where-a-huge-steel-beam-will-be-inserted-into-the-house-for-the-support-of-the-roof-and-the-new-wall-will-be-built-on-top

right-side-of-house-roof

right-side-of-house-roof

top-of-old-balcony-window-just-visible-from-scaffolding

top-of-old-balcony-window-just-visible-from-scaffolding

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area-pic-2

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area-pic-2

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area-pic-3

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area-pic-3