Day 122 – Tuesday 20th December 2016

Day 122 – Tuesday 20th December 2016

new-bath-and-shower

New Bath and Shower

new-bathroom-and-towel-rail

New family bathroom with towel radiator toilet and sink

toilet-and-wash-hand-basin

toilet-and-wash-hand-basin

Day 96 – Friday 18th November 2016

Day 96 – Friday 18th November 2016

Wall beside patio – preparation and rebuild of existing wall.  Also plastering progress in new bathroom and kitchen.

bathroom-plastering

bathroom-plastering

bathroom-plastering-2

bathroom-plastering-2

sloping-ceiling-to-new-kitchen

sloping-ceiling-to-new-kitchen

plaster-around-ceiling-in-new-kitchen

plaster-around-ceiling-in-new-kitchen

wall

Rebuild of old wall in front of patio

wall-3

Old wall merges into new

wall-2

Five steps are to be constructed here up to patio

 

Day 91 – Friday 11th November 2016

Day 91 – Friday 11th November 2016

New Triangular Shaped glass, made to measure went in today over patio doors.  Also plaster boarding above hip roof inside new kitchen now finished.

new-kitchen-plaster-board-completed-above-hip-roof

Plasterboarding over the hip roof around patio doors now complete

plaster-board-complete-in-new-kitchen-over-hip-roof

plaster-board-complete-in-new-kitchen-over-hip-roof

patio-doors-and-triangular-glass-fitted-above

patio-doors-and-triangular-glass-fitted-above

new-patio-doors-with-triangular-window-fitted-above

new-patio-doors-with-triangular-window-fitted-above

new-triangular-window-over-patio-door

new-triangular-window-over-patio-door

Day 86 – Thursday 3rd November 2016

Day 86 – Thursday 3rd November 2016

new-bathroom-plasterboarding-double-in-places-to-fill-gaps

new-bathroom-plasterboarding-double-in-places-to-fill-gaps

new-bathroom-plasterboarding

new-bathroom-plasterboarding

new-door-frame-around-new-bathroom-door-picture-2

new-door-frame-around-new-bathroom-door-picture-2

new-door-frame-around-new-bathroom-door

new-door-frame-around-new-bathroom-door

new-door-frame-around-new-kitchen-door-top-of-steps

new-door-frame-around-new-kitchen-door-top-of-steps

Day 81 – Friday 28th October 2016

Day 81 – Friday 28th October 2016

Patio doors for kitchen arrived today

new-patio-doors-in-new-kitchen-from-inside

new-patio-doors-in-new-kitchen-from-inside

new-patio-doors-minus-the-apex-window-on-order-fitted-by-clive-and-chris

New patio doors minus the apex window on order fitted by Clive and Chris

new-patio-doors-to-new-kitchen-from-outside

new-patio-doors-to-new-kitchen-from-outside

new-patio-doors-to-new-kitchen-from-outside-2

new-patio-doors-to-new-kitchen-from-outside-2

Day 80 – Thursday 27th November 2016

Day 80 – Thursday 27th November 2016

marcus-the-plumber-in-a-very-tight-spot-under-the-floor-in-the-new-bathroom

Spot Marcus, our plumber, in a very tight spot, under the floor in the new bathroom

under-the-new-bathroom-floor-where-toilet-and-sink-will-go

under-the-new-bathroom-floor-where-toilet-and-sink-will-go

drain-and-pipework-under-floor

drain-and-pipework-under-floor

under-the-new-bathroom-floor-where-bath-will-be-positioned

under-the-new-bathroom-floor-where-bath-will-be-positioned

new-plasterboard-ceiling-in-utility-room

new-plasterboard-ceiling-in-utility-room

new-plasterboard-ceiling-in-new-bathroom

new-plasterboard-ceiling-in-new-bathroom

new-plasterboard-ceiling-in-entrance-to-kitchen-beneath-flat-roof

new-plasterboard-ceiling-in-entrance-to-kitchen-beneath-flat-roof

Day 79 – Wednesday 26th October 2016

Day 79 – Wednesday 26th October 2016

progress-on-roof-today

Progress on the roof – Day 79

close-up-of-roof-progress

close-up-of-roof-progress

roof-zoomed-in

Ridge tiles not yet in final position

roof-between-old-and-new-building

roof-between-old-and-new-building

roof-between-old-and-new-building-from-step-ladder

roof-between-old-and-new-building-from-step-ladder

roof-between-old-and-new-building-from-step-ladder-2

roof-between-old-and-new-building-from-step-ladder-2

new-bathroom-pipework-under-floor-boards

new-bathroom-pipework-under-floor-boards

new-bathroom-pipework-under-floor-boards-2

new-bathroom-pipework-under-floor-boards-2

new-bathroom-pipework-under-floor-boards-3

new-bathroom-pipework-under-floor-boards-3

new-bathroom-pipework-for-shower

new-bathroom-pipework-for-shower

Day 75 – Friday 21st October 2016

Day 75 – Friday 21st October 2016

More insulation and roof nearly completed

kitchen-partly-floored-and-partly-insulated

kitchen partly floored and partly insulated

new-kitchen-partly-insulated-and-floored

New Kitchen partly floored and partly insulated

kitchen-with-insulation-partly-complete-and-flooring-also-shows-electrical-plug-socket-in-floor-for-island-unit

kitchen-with-insulation-partly-complete-and-flooring-also-shows-electrical-plug-socket-in-floor-for-island-unit

electrical-socket-in-flooring-not-yet-connected-in-kitchen-floor-for-island-unit

electrical-socket-in-flooring-not-yet-connected-in-kitchen-floor-for-island-unit

roof-nearly-complete

Roof nearly completed

roof-between-old-kitchen-and-new-kitchen

roof-between-old-kitchen-and-new-kitchen

Day 71 – Monday 17th October 2016

Day 71 – Monday 17th October 2016

Builder, Electrician and Plumber today. Heavy showers too, so roof not complete yet.

wall-at-front-where-patio-doors-going-has-been-levelled

wall at front where the patio doors are going has been levelled

kitchen-looking-through-window-from-hall-soon-to-be-removed

Looking through to new kitchen – window-from-hall-soon-to-be-removed and replaced with a door

new-steps-built-today-from-utility-to-new-kitchen-thet-are-not-level-at-the-top-as-the-kitchen-floor-has-not-been-built-up-yet

New steps-built-today-from-utility-to-new-kitchen. They are-not-level-at-the-top-as-the-kitchen-floor-has-not-been-built-up-yet

new-pipe-for-radiator-in-kitchen

new-pipe-for-radiator-in-kitchen

new-pipe-for-radiator-in-kitchen-2

new-pipe-for-radiator-in-kitchen picture 2

radiator-pipes-going-through-wall-to-new-bathroom

radiator-pipes-going-through-wall-to-new-bathroom

radiator-pipes-unning-around-flooring-will-be-below-level-of-floor-when-floor-has-been-put-in

radiator-pipes-running-around-flooring-will-be-below-level-of-floor-when-floor-has-been-put-in

switch-in-kitchen-on-left-at-the-top-of-the-new-steps

switch-in-kitchen-on-left-at-the-top-of-the-new-steps

new-switch-for-outside-light-just-outside-back-door

new-switch-for-outside-light-just-outside-back-door

old-outdoor-window-sill-now-chisled-away

old outdoor window sill now chiselled away