Day 187 – Thursday 30th March 2017 – phase 2

Day 187 – Thursday 30th March 2017 – phase 2

No work on Wednesday

Today is the last day of the build.  Lots of finishing off tasks and installing new doors downstairs.  Plumber still to do radiators, and bathroom suite upstairs, but all the external build is now complete.  Here are a few pictures, more to come after the scaffolding is removed.

The outside of the house is all ready for unveiling. The scaffolding should come down next week.

The outside of the house is all ready for unveiling. The scaffolding should come down next week.

guttering finished on the right side of house

guttering finished on the right side of house

guttering all finished

guttering all finished

Bat box on the right side of house by bedroom

Bat box on the right side of house by bedroom

bat box at the top of the house under the gable

bat box at the top of the house under the gable

Bat box on the left side of the house

Bat box on the left side of the house

The curtain is down! We now have the archway back and can see our new sun lounge! Superb!

The curtain is down! We now have the archway back and can see our new sun lounge! Superb!

Another view through the archway

Another view through the archway

New door into downstairs bedroom

New door into downstairs bedroom

New glass panelled door into the hall - this will allow some light through

New glass panelled door into the hall – this will allow some light through

Magnolia tree just ready to flower

Magnolia tree just ready to flower

Day 168 – Friday 3rd March 2017 – phase 2

Day 168 – Friday 3rd March 2017 –   phase 2

Extremely wet day today, but due to canopy over the house, the roofer was still able to work.

royston-roofer

Royston Collier has been the roofer for phase 2

royston-roofer-back-of-van

Royston the roofer back-of-van

royston-tiling-the-sloping-sides-of-the-gables

royston-tiling-the-sloping-sides-of-the-gables

ridge-tiling

Tiling of all the ridges around the flat roof

ridge-tiling-2

ridge-tiling-2

ridge-tiling-pic2

ridge-tiling-pic2

ridge-tiles-on-scaffolding

ridge-tiles-on-scaffolding

ensuite-bathroom-plastered

Ensuite bathroom has been plastered

top-of-stair-wall-plastered-wires-are-for-the-top-of-the-stairs-lights

Top of stair wall plastered. Wires are for the top of the stairs light switches (Joe O’Hara – Ballan Electrical)

plastering-in-the-study-so-far-velux-window-visible

Plastering in the study so far. Velux window visible

formation-of-cupboard-over-the-staircase-accessed-from-study

Formation of the over the stairs cupboard, now all boxed in and plaster-boarded, accessed from the study

very-high-ceiling-over-where-the-staircase-will-be-all-plastered

very-high-ceiling-over-where-the-staircase-will-be. Top ceiling is now all plastered. Small hole is for light.

old-porch-roof-has-had-noggins-put-in-for-extra-support

Old Porch Roof has had noggins inserted for extra strength

old-porch-roof-with-noggins-inserted

old-porch-roof-with-noggins-inserted

Day 107 – Thursday 1st December 2016

Day 107 – Thursday 1st December 2016

new-lights-in-kitchen

We have lights! In new kitchen

new-lights-in-kitchen-pic-3

new-lights-in-kitchen-pic-3

new-lights-in-kitchen-pic-2

new-lights-in-kitchen-pic-2

lights-now-connected-in-new-kitchen

lights-now-connected-in-new-kitchen

lights-in-utility-room-this-is-a-great-light-has-an-occupancy-sensor-so-light-comes-on-immediately-on-entering-from-which-ever-of-the-4-doors-you-come-through

lights-in-utility-room-this-is-a-great-light-has-an-occupancy-sensor-so-light-comes-on-immediately-on-entering-from-which-ever-of-the-4-doors-you-come-through

Day 71 – Monday 17th October 2016

Day 71 – Monday 17th October 2016

Builder, Electrician and Plumber today. Heavy showers too, so roof not complete yet.

wall-at-front-where-patio-doors-going-has-been-levelled

wall at front where the patio doors are going has been levelled

kitchen-looking-through-window-from-hall-soon-to-be-removed

Looking through to new kitchen – window-from-hall-soon-to-be-removed and replaced with a door

new-steps-built-today-from-utility-to-new-kitchen-thet-are-not-level-at-the-top-as-the-kitchen-floor-has-not-been-built-up-yet

New steps-built-today-from-utility-to-new-kitchen. They are-not-level-at-the-top-as-the-kitchen-floor-has-not-been-built-up-yet

new-pipe-for-radiator-in-kitchen

new-pipe-for-radiator-in-kitchen

new-pipe-for-radiator-in-kitchen-2

new-pipe-for-radiator-in-kitchen picture 2

radiator-pipes-going-through-wall-to-new-bathroom

radiator-pipes-going-through-wall-to-new-bathroom

radiator-pipes-unning-around-flooring-will-be-below-level-of-floor-when-floor-has-been-put-in

radiator-pipes-running-around-flooring-will-be-below-level-of-floor-when-floor-has-been-put-in

switch-in-kitchen-on-left-at-the-top-of-the-new-steps

switch-in-kitchen-on-left-at-the-top-of-the-new-steps

new-switch-for-outside-light-just-outside-back-door

new-switch-for-outside-light-just-outside-back-door

old-outdoor-window-sill-now-chisled-away

old outdoor window sill now chiselled away