Saturday 18th and Sunday 19th March 2017 – phase 2

Saturday 18th and Sunday 19th March 2017 – phase 2

Busy weekend.  Scaffolding is due for removal shortly.  Therefore it was an opportunity that we couldn’t miss to give the new render 2 coats of paint.  We used Sandtex Masonry Paint.

Painting the new render, first coat

Painting the new render, first coat

First coat of masonery paint on new rendering

First coat of masonry paint on new rendering

All painted - will be able to paint from here downwards when the scaffolding is removed

All painted – will be able to paint from here downwards when the scaffolding is removed

Bathroom and bedroom windows

Bathroom and bedroom windows

Gable painted

Gable painted

two coats of paint

two coats of paint

View of painted newly rendered walls along the top of the scaffolding

View of painted newly rendered walls along the top of the scaffolding

Day 179 – Friday 17th March 2017 – phase 2

Day 179 – Friday 17th March 2017 – phase 2

Windows now with seals fitted

Windows now with trims fitted

Window seals all fitted to new French Doors

Window seals and trims all fitted to new French Doors

Trims fitted between beam and new doors

Trims fitted between beam and new doors

Steve and Luke, our builders, constructing our wardrobes - which they have made to fit the sloping roofs eactly

Steve and Luke, our builders, constructing our wardrobes – which they have made to fit the sloping roofs exactly

Double wardrobe under construction

Double wardrobe under construction

Inside double wardrobe - progress so far

Inside double wardrobe – progress so far

Cupboards under construction

Cupboards under construction

Day 178 – Thursday 16th March 2017 – phase 2

Day 178 – Thursday 16th March 2017 – phase 2

Windows and doors have arrived for the front

Windows and doors have arrived for the front

Chris and Clive our window fitters - CWH Windows and Doors, Cardiff - an excellent job done on all our windows and doors!

Chris and Clive our window fitters – CWH Windows and Doors, Cardiff – an excellent job done on all our windows and doors!

Clive - the window expert

Clive – the window expert

Clive Chris and Steve

Clive, Chris and Steve, our builder

Finally the new French Doors for the front of the house have arrived

Finally the new French Doors for the front of the house have arrived. This is a sideways view until the scaffolding is taken away

French door with letterbox to the bottom right

French door with letterbox to the bottom right

New French Window Front Doors

New French Window Front Doors

New front doors from outside

New front doors from outside

New front windows and doors - fabulous

New front windows and doors – fabulous

side view of new window pic 2

side view of new window pic 2

side view of new window

side view of new window

View from the ladder of the new window

View from the ladder of the new window

View of the front from the side

View of the front from the side

Windows and doors have arrived for the front pic 2

Windows and doors have arrived for the front pic 2

Window units put in place today in the dormer, where the boarding up was, supplier sent the wrong size

Window units put in place today in the dormer, where the boarding up was, supplier sent the wrong size

View of the house with new front doors and windows

View of the house with new front doors and windows

View of the house with new front doors and windows from a slightly different angle

View of the house with new front doors and windows from a slightly different angle

New fitted cupboards under construction in the sloping roof area

New fitted cupboards under construction in the sloping roof area. Taking shape!

New large fitted wardrobes also under construction

New large fitted wardrobes also under construction

New large fitted wardrobes under construction on both sides of the doorway

New large fitted wardrobes under construction on both sides of the doorway. Looking brilliant

Day 174 – Friday 10th March 2017 – phase 2

Day 174 – Friday 10th March 2017 – phase 2

Roughcasting coat from left side of scaffolding

Roughcasting coat or tyroleaning from left side of scaffolding

Roughcasting coat or tyrolleaning

Roughcasting coat or tyroleaning

Roughcasting coat on outside of new upstairs extension

Roughcasting or tyrolean coat on outside of new upstairs extension

View of roughcast around new bathroom window

View of roughcast around new bathroom window

Planks and scaffolding left inside for the weekend to enable us to apply 2 coats of paint

Planks and scaffolding left inside for the weekend to enable us to apply 2 coats of paint

Ceiling of stairwell, with plank across scaffolding for painting

Ceiling of stairwell, with plank across scaffolding for painting

Preparing to paint the ceiling of the stairwell

Preparing to paint the ceiling of the stairwell

Study with plaster all dried ready for painting

Study with plaster all dried ready for painting

Painting study pic

Painting study pic

Day 173 – Thursday 9th March 2017 – phase 2

Day 173 – Thursday 9th March 2017 – phase 2

Downstairs sun lounge back wall plastered

Downstairs sun lounge back wall plastered

New sun lounge another wall skimmed with plaster

New sun lounge another wall skimmed with plaster

More plastered wall in new sun lounge

More plastered walls in new sun lounge

Plastering around the top of the staircase position

Plastering around the top of the staircase position

Plastering now completed around the dormer window

Plastering now completed around the dormer window

Work on dormer felt and batten at sides

Work on dormer –  membrane and batten has been fixed on at the sides

painting of upstairs bedroom continuing

painting of upstairs bedroom continuing

View from back of bedroom to front, not all painted yet, some areas with only first coat

View from back of bedroom to front, not all painted yet, some areas with only first coat

Side of dormer window, felt and batten on sides

Side of dormer window, membrane and batten on sides

Day 171 – Tuesday 7th March 2017 – phase 2

Day 171 – Tuesday 7th March 2017 – phase 2

Spring - lovely day

Spring seems to have arrived – a beautiful day at Springdale

Through the Magnolia tree

Through the Magnolia tree

furry bud on the Magnolia tree

Furry buds on the Magnolia Tree

Ballan Electrical

Joe O’Hara from Ballan Electrical and Steve Williams, our builder

Wallpaper stripped off, walls plastered, ready for another coat, old red paint showing from a previous owner of Springdale

Wallpaper stripped off, walls filled with plaster ready for another coat, old red paint showing through from a previous owner of Springdale

Rough plaster to fill in gaps where old wall between poch and hall was taken down, red paint under old wallpaper

Rough plastering to fill the gaps where the old wall was situated between the porch and the hall. Red paint showing through under the old wallpaper

New sun lounge, angled wall has been plastered filling in any uneven divets and holes and missing plaster where picture rail was removed

New sun lounge, angled wall has been plastered filling in any uneven divets and holes and missing plaster where picture rail was removed

New flooring in old porch area, insulated underneath

New flooring in old porch area, insulated underneath

c

View from old porch through new sun lounge areas have been plaster filled in readiness for skim coat. Old wallpaper and picture rail removed

Ladders the only access to upstairs - wall plastered,

Ladders still the only access to upstairs – wall plastered

Ceiling for new sun lounge with plaster board. Joe O'Hara, Ballan Electrical, has cut 8 holes for new lights, wires are in place for lighting

Ceiling for the new sun lounge at plasterboard stage. Joe O’Hara, Ballan Electrical, has cut 8 holes for the new lights which he wired on his last visit.

Newly plasterboarded ceiling and wiring for new lights. There will be 8 in total in this room

The front of the new sun lounge. Newly plasterboarded ceiling and wiring for new lights. There will be 8 in total in this room

Plug socket in new sun lounge

Plug socket in new sun lounge

Access to upstairs

Access to upstairs

First new light upstairs, fitted but not connected. It is one of 9 lights for the new bedroom

First new lights upstairs, fitted but not yet able to switch on. It is one of 9 lights for the bedroom

new socket by small window in bedroom

New socket by small window in bedroom  -Up and running!

light switch for main lights that will be beside bed, also sockets below

light switch for main lights that will be beside bed, also sockets below

light switch being prepared outside new ensuite bathroom

light switch being prepared outside new ensuite bathroom

Lights installed and parts of ceiling painted

Lights installed and parts of ceiling painted

light in study, but no light yet!

light in study, but no light yet!

Another few walls painted with initial coat of emulsion in the upstairs bedroom

Another few walls painted with initial coat of emulsion in the upstairs bedroom

View across the new bedroom to windows, lights and wiring can be seen

View across the new bedroom to windows, lights and wiring can be seen

Plastering over the stairwell and wiring completed for stair lights

Plastering over the stairwell and wiring completed for stair lights

Initial coats of emulsion in new bedroom

Initial coats of emulsion in new bedroom

Day 164 – Monday 27th February 2017 – phase 2

Day 164 – Monday 27th February 2017 – phase 2

4-vans-means-a-lot-of-teas-and-coffees

Four vans on the drive – this means a lot of teas and coffees to be made

Roofer, Royston, has been doing the flat roof sections

another-coat-of-fibre-glass-applied-over-flat-roof

another-coat-of-fibre-glass-applied-over-flat-roof

fibre-glass-roof

fibre-glass-roof

flat-roof-over-the-dormer

flat-roof-over-the-dormer lead area can be seen below

dormer-window-boarded-up-and-flat-roof-has-had-fibre-glass-applied

dormer-window-boarded-up-and-flat-roof-has-had-fibre-glass-applied

Michael the plasterer to begin skimming walls etc.

beginning-of-plastering-in-the-study-sealing-joints

beginning-of-plastering-in-the-study-sealing-joints

plasterer-beginning-to-seal-joints-between-plasterboard-before-skimming

plasterer-beginning-to-seal-joints-between-plasterboard-before-skimming

plastering-of-bedroom-ceiling

plastering-of-bedroom-ceiling

plastering-on-the-new-bedroom-ceiling-half-the-room-has-been-completed-today

plastering-on-the-new-bedroom-ceiling-half-the-room-has-been-completed-today

ceiling-pipework-in-new-front-room-old-hall-in-the-ceiling-for-water-and-radiators

ceiling-pipework-in-new-front-room-old-hall-in-the-ceiling-for-water-and-radiators. Work done by Marcus Kelly and his assistant Josh

pipework-for-radiators-and-hot-and-cold-water-for-upstairs-fitted-today-by-marcus-kelly-plumber

pipework-for-radiators-and-hot-and-cold-water-for-upstairs-fitted-today-by-marcus-kelly-plumber

pipework-in-the-old-porch-roof-space-for-hot-old-water-and-radiators

pipework-in-the-old-porch-roof-space-for-hot and cold-water-and-radiators

extractor-fan-installed-in-new-bathroom

extractor-fan-installed-in-new-bathroom

joe-ohara-electrician-ballen-electrical

Joe O’Hara, electrician, Ballan Electrical, wiring for light switches, sockets, in the old hallway which is becoming the sun lounge

channel-in-the-wall-in-the-new-front-room-for-wiring-to-turn-on-main-lights

channel-in-the-wall-in-the-new-front-room-for-wiring-to-turn-on-main-lights

channel-for-electrics-to-light-switch-which-will-be-by-the-staircase

channel-for-electrics-to-light-switch-which-will-be-by-the-staircase

wiring-installed-for-outside-light

wiring-installed-for-outside-light

wiring-for-right-hand-outside-light

wiring-for-right-hand-outside-light

wiring-for-outside-light-and-porch-light

wiring-for-outside-light

rockwool-filling-cavities-in-the-new-ensuite-bathroom

rockwool-filling-cavities-in-the-new-ensuite-bathroom

upstairs-windows-as-viewed-from-level-2-of-the-scaffolding

upstairs-windows-as-viewed-from-level-2-of-the-scaffolding

progress-at-the-top-of-the-staircase

progress-at-the-top-of-the-staircase

Day 150 – Tuesday 7th February 2017 – phase 2

Day 150 – Tuesday 7th February 2017 – phase 2

gable-end-and-completed-brick-work

Gable end on right hand side and completed brickwork

gable-end-and-completed-brick-work-pic-2

gable-end-and-completed-brick-work-pic-2 tubing for extractor fan from bathroom

brick-work-tying-in-with-rafters

brick-work-tying-in-with-rafters

rafters-and-brick-work-complete-down-roof-slope

rafters-and-brick-work-complete-down-roof-slope

block-work-between-cross-beams-to-tops-of-windows

block-work-between-cross-beams-to-tops-of-windows

flooring-in-new-upstairs

Flooring in new upstairs area – picture from the left

flooring-completed-on-left-side

flooring-completed-on-left-side

flooring-in-new-upstairs-pic-2

flooring-in-new-upstairs-pic-2 from the right side

upstairs-floor-area

upstairs-floor-area – picture taken from the middle window

view-from-back-to-front-of-new-upstairs-area

view-from-back of new bedroom -to-front and window openings-of-new-upstairs-area

Day 134 – Thursday 19th January 2017 – phase 2

Day 134 – Thursday 19th January 2017 – phase 2

progress-on-day-134-formation-of-upstairs-windows

progress-on-day-134-formation-of-upstairs-windows

progress-on-day-134-formation-of-upstairs-windows-pic-2

progress-on-day-134-formation-of-upstairs-windows-pic-2

side-view-of-new-upstairs

side-view-of-new-upstairs

opening-for-middle-window

opening-for-middle-window

view-looking-down-from-top-scaffolding-onto-old-balcony-window

view-looking-down-from-top-scaffolding-onto-old-balcony-window

view-looking-down-from-top-scaffolding-onto-old-balcony-window-also-showing-areas-of-roof-that-have-been-prepared-for-new-steel-beam

view-looking-down-from-top-scaffolding-onto-old-balcony-window-also-showing-areas-of-roof-that-have-been-prepared-for-new-steel-beam

view-from-the-right-hand-side-of-house-steel-beams-in-brown-now-at-the-bottom-of-the-wall

view-from-the-right-hand-side-of-house-steel-beams-in-brown-now-at-the-bottom-of-the-wall

view-of-the-new-wall-from-the-left-side-of-the-scaffolding

view-of-the-new-wall-from-the-left-side-of-the-scaffolding

view-of-right-hand-side-of-roof

view-of-right-hand-side-of-roof

view-of-double-wall-built-on-top-of-new-steel-beam-at-the-front-of-the-house-and-pitched-roof-covered-to-protect-from-the-weather-roof-felt-is-in-poor-condition-probably-the-original-roofing-felt

view-of-double-wall-built-on-top-of-new-steel-beam-at-the-front-of-the-house-and-pitched-roof-covered-to-protect-from-the-weather-roof-felt-is-in-poor-condition-probably-the-original-roofing-felt

view-from-the-right-hand-side-of-house-showing-double-wall-and-exposed-roof-covered

view-from-the-right-hand-side-of-house-showing-double-wall-and-exposed-roof-covered

left-hand-side-of-roof

left-hand-side-of-roof

Day 130 – Friday 13th January 2017 – phase 2

Day 130 – Friday 13th January 2017 – phase 2

Warning! A vast amount of scaffolding photos in this post.

scaffolding-delivery

Scaffolding arrived for phase 2

scaffolding-delivery-pic-2

Scaffolding truck

scaffolding-through-the-blinds-in-sitting-room

scaffolding-through-the-blinds-in-sitting-room

the-front-of-springdale-scaffolding-going-up-around-the-front-and-sides

The Front Of Springdale -Scaffolding-going-up-around-the-front-and-sides

c

Scaffolding around house – View from front garden

scaffolding

scaffolding

scaffolding-at-the-side

scaffolding-at-the-side

scaffolding-at-the-right-hand-side

scaffolding-at-the-right-hand-side

side-scaffolding

side-scaffolding

scaffolding-from-outside-along-left-side-of-house

scaffolding-from-outside-along-left-side-of-house

scaffolding-at-right-side-and-satellite-dish

scaffolding-at-right-side-and-satellite-dish

balcony-window-from-outside-not-in-great-condition

balcony-window-from-outside-not-in-great-condition

balcony-window-from-outside-not-in-great-condition-and-tiles-in-poor-state

balcony-window-from-outside-not-in-great-condition-and-tiles-in-poor-state

bottom-scaffolding

bottom-scaffolding

chimney-to-be-removed

chimney-to-be-removed

top-scaffolding-view-towards-fields-over-the-top-of-the-house

top-scaffolding-view-towards-fields-over-the-top-of-the-house

top-scaffolding-view-towards-fields-showing-chimney-that-is-to-be-removed

top-scaffolding-view-towards-fields-showing-chimney-that-is-to-be-removed

view-from-scaffolding-corner-potential-view

view-from-scaffolding-corner-potential-view

view-from-scaffolding

view-from-scaffolding

view-from-top-scaffolding

view-from-top-scaffolding

view-from-top-scaffolding-over-small-garage

view-from-top-scaffolding-over-small-garage

the-beginning-of-the-new-bedroom

the-beginning-of-the-new-bedroom

rock-wool-insulation-in-new-master-bedroom-extension

rockwool-insulation-in-new-master-bedroom-extension

old-chandelier-from-hall-and-old-water-tank-from-attic

old-chandelier-from-hall-and-old-water-tank-from-attic