Day 184 – Friday 24th March 2017 – phase 2

Day 184 – Friday 24th March 2017 – phase 2

Into the final stages now as the outside is nearly finished with just vents and guttering to be completed.  Inside the staircase will be finished next week and some new doors, which are extras to the build, will be fitted.  Today 3 bat boxes were fixed into position as required by our bat licence.

Bat box 2

Bat box 2, a small slit at the bottom allows a bat to enter

Bat box 1 - shadowed by scaffolding

Bat box 1 – shadowed by scaffolding

Bat box 3 painted white to blend in with the house

Bat box 3 painted white to blend in with the house

Looking down into sun room from scaffolding

Looking down into sun room from scaffolding

New guttering and down pipes from flat roof

New guttering and down pipes from flat roof

New guttering and down pipes pic 2

New guttering and down pipes pic 2

New guttering up around the dormer window

New guttering up around the dormer window

Bathroom door now with handles fitted

Bathroom door now with handles fitted

Inside the new wardrobes - hanging rails and small shelf - perfect, thanks Steve and Luke

Inside the new wardrobes – hanging rails and small shelf – perfect! thanks Steve and Luke

Wardrobe under the sloping roof adapted to fit

Wardrobe under the sloping roof adapted to fit

Wardrobe with longer hanging space for longer clothes

Wardrobe with longer hanging space for longer clothes

Wardrobe with panelling showing on sides and fronts - looks so smart

Wardrobe with panelling showing on sides and front – looks so smart

Wardrobe, one door open

Wardrobe, one door open

 

Cupboard in the study over the stairs - now with fitted doors

Cupboard in the study over the stairs – now with fitted doors

Day 183 – Thursday 23rd March 2017 – phase 2

Day 183 – Thursday 23rd March 2017 – phase 2

New outside sensor lights for Springdale, wired and installed by Joe - Ballan Electrical

New outside sensor lights for Springdale, wired and installed by Joe – Ballan Electrical

Outside Light at Springdale

Outside Light at Springdale

Second front outside light at Springdale

Second front outside light at Springdale

New sun lounge - we now have light, thanks to Joe, Ballan Electrical

New sun lounge – we now have light, thanks to Joe, Ballan Electrical

Staircase out of bounds tonight whilst extra supports are setting

Staircase out of bounds tonight whilst extra supports are setting

Staircase - looking down, treads all covered with card to protect them till work is finished pic 2

Staircase – looking down, treads all covered with card to protect them till work is finished pic 2 Supports have now set

Cupboards built into sloping roof

Cupboards built into sloping roof, now with handles

Handles for newly built fitted wardrobes and cupboards

Handles for newly built fitted wardrobes and cupboards Close up picture

View of new wardrobes from dormer side of bedroom, corner not yet complete

View of new wardrobes from dormer side of bedroom, corner not yet complete

Door to new bedroom with handles

Door to new bedroom with handles

Door to new ensuite bathroom, no handles yet

Door to new ensuite bathroom, no handles yet

Door to study with corner piece cut out - this has been from a safety point of view.

Door to study with corner piece cut out – this has been from a safety point of view. The door is safest opening into the room. Opening onto a small landing means stepping backwards which could result in a fall down the stairs

Door to study, corner cut off to fit inside sloping roof

Door to study, corner cut off to fit inside sloping roof

Day 176 – Tuesday 14th March 2017 – phase 2

Day 176 – Tuesday 14th March 2017 – phase 2

As an extra to the new upstairs build, and as recommended by our builder, we decided to have the rest of the roofing felt and battens renewed.  The felt on the old part of the house was in a bad state,  so tiles needed stripping off first.  In accordance with our bat licence we had two bat ecologists to supervise this part.

 

roofers at work

Roofers at work

 

The Bat Girls

The Bat Ecologists

felt and battening being replaced

felt and battening being replaced

New felt and battening for the rest of the roof that was not replaced during the new building of upstairs bedroom

New felt and battening for the rest of the roof that was not replaced during the new building of upstairs bedroom

New ridge tiles - ladder up from utility flat roof

New ridge tiles – ladder up from utility flat roof

roofers at work

roofers at work

small area of felt and battening being replaced on the right hand side of the house

small area of felt and battening being replaced on the right hand side of the house

Steve and Luke burning the old roof battens

Steve and Luke burning the old roof battens

view down to utility flat roof and skylight over new family bathroom

view down to utility flat roof and skylight over new family bathroom

View from flat roof over upstairs bedroom to right side of house, new ridge tiles and new felt and battening

View from flat roof over upstairs bedroom to right side of house, new ridge tiles and new felt and battening

View over from new flat roof over the new upstairs bedroom down to the back of the house where 3 steep rooves now converge onto utility roof

View over from new flat roof over the new upstairs bedroom down to the back of the house where 3 steep roofs now converge onto utility roof

View over roofs at back of house

View over roofs at back of house

view over flat roof of dormer, just visible

view over flat roof of dormer, just visible

view to front of house from flat roof

view to front of house from flat roof

VIew to front of house from new flar roof over the bedroom

View to front of house from new flat roof over the bedroom

View to velux side of house

View to velux side of house

window sill at dormer

window sill at dormer

New window sill in master bedroom

New window sill in master bedroom

New window sill at small window

New window sill at small window

sun lounge - scaffolding for painting and ladders still the only access to the upstairs

sun lounge – scaffolding for painting and ladders still the only access to the upstairs

New lights up and running in master bedroom by ballen Electrical

New lights up and running in master bedroom by Ballan Electrical, 9 lights in total, excellent lighting

Study lights and wood rof new cupboard over stairs

Study lights, 3, put in by Joe, and wood for new cupboard over stairs

lights over stairs

lights over stairs

No stairs yet, access by ladder

No stairs yet, access by ladder

Day 171 – Tuesday 7th March 2017 – phase 2

Day 171 – Tuesday 7th March 2017 – phase 2

Spring - lovely day

Spring seems to have arrived – a beautiful day at Springdale

Through the Magnolia tree

Through the Magnolia tree

furry bud on the Magnolia tree

Furry buds on the Magnolia Tree

Ballan Electrical

Joe O’Hara from Ballan Electrical and Steve Williams, our builder

Wallpaper stripped off, walls plastered, ready for another coat, old red paint showing from a previous owner of Springdale

Wallpaper stripped off, walls filled with plaster ready for another coat, old red paint showing through from a previous owner of Springdale

Rough plaster to fill in gaps where old wall between poch and hall was taken down, red paint under old wallpaper

Rough plastering to fill the gaps where the old wall was situated between the porch and the hall. Red paint showing through under the old wallpaper

New sun lounge, angled wall has been plastered filling in any uneven divets and holes and missing plaster where picture rail was removed

New sun lounge, angled wall has been plastered filling in any uneven divets and holes and missing plaster where picture rail was removed

New flooring in old porch area, insulated underneath

New flooring in old porch area, insulated underneath

c

View from old porch through new sun lounge areas have been plaster filled in readiness for skim coat. Old wallpaper and picture rail removed

Ladders the only access to upstairs - wall plastered,

Ladders still the only access to upstairs – wall plastered

Ceiling for new sun lounge with plaster board. Joe O'Hara, Ballan Electrical, has cut 8 holes for new lights, wires are in place for lighting

Ceiling for the new sun lounge at plasterboard stage. Joe O’Hara, Ballan Electrical, has cut 8 holes for the new lights which he wired on his last visit.

Newly plasterboarded ceiling and wiring for new lights. There will be 8 in total in this room

The front of the new sun lounge. Newly plasterboarded ceiling and wiring for new lights. There will be 8 in total in this room

Plug socket in new sun lounge

Plug socket in new sun lounge

Access to upstairs

Access to upstairs

First new light upstairs, fitted but not connected. It is one of 9 lights for the new bedroom

First new lights upstairs, fitted but not yet able to switch on. It is one of 9 lights for the bedroom

new socket by small window in bedroom

New socket by small window in bedroom  -Up and running!

light switch for main lights that will be beside bed, also sockets below

light switch for main lights that will be beside bed, also sockets below

light switch being prepared outside new ensuite bathroom

light switch being prepared outside new ensuite bathroom

Lights installed and parts of ceiling painted

Lights installed and parts of ceiling painted

light in study, but no light yet!

light in study, but no light yet!

Another few walls painted with initial coat of emulsion in the upstairs bedroom

Another few walls painted with initial coat of emulsion in the upstairs bedroom

View across the new bedroom to windows, lights and wiring can be seen

View across the new bedroom to windows, lights and wiring can be seen

Plastering over the stairwell and wiring completed for stair lights

Plastering over the stairwell and wiring completed for stair lights

Initial coats of emulsion in new bedroom

Initial coats of emulsion in new bedroom

Day 168 – Friday 3rd March 2017 – phase 2

Day 168 – Friday 3rd March 2017 –   phase 2

Extremely wet day today, but due to canopy over the house, the roofer was still able to work.

royston-roofer

Royston Collier has been the roofer for phase 2

royston-roofer-back-of-van

Royston the roofer back-of-van

royston-tiling-the-sloping-sides-of-the-gables

royston-tiling-the-sloping-sides-of-the-gables

ridge-tiling

Tiling of all the ridges around the flat roof

ridge-tiling-2

ridge-tiling-2

ridge-tiling-pic2

ridge-tiling-pic2

ridge-tiles-on-scaffolding

ridge-tiles-on-scaffolding

ensuite-bathroom-plastered

Ensuite bathroom has been plastered

top-of-stair-wall-plastered-wires-are-for-the-top-of-the-stairs-lights

Top of stair wall plastered. Wires are for the top of the stairs light switches (Joe O’Hara – Ballan Electrical)

plastering-in-the-study-so-far-velux-window-visible

Plastering in the study so far. Velux window visible

formation-of-cupboard-over-the-staircase-accessed-from-study

Formation of the over the stairs cupboard, now all boxed in and plaster-boarded, accessed from the study

very-high-ceiling-over-where-the-staircase-will-be-all-plastered

very-high-ceiling-over-where-the-staircase-will-be. Top ceiling is now all plastered. Small hole is for light.

old-porch-roof-has-had-noggins-put-in-for-extra-support

Old Porch Roof has had noggins inserted for extra strength

old-porch-roof-with-noggins-inserted

old-porch-roof-with-noggins-inserted