Weekend work – Saturday 1st April and Sunday 2nd April 2017

Weekend work – Saturday 1st April and Sunday 2nd April 2017

painting above front patio doors now complete

Painting above front patio doors now complete

doors on cupboard in the study have had another coat, one more coat of the eggshell paint to go

Doors on cupboard in the study have had another coat of paint, one more coat of the eggshell paint to go on the inner panel

door into new family bathroom now varnished on both sides

Door into new family bathroom now varnished on both sides

door into new family bathroom now varnished

Door into new family bathroom now varnished, this is the outside off the Utility Room

old kitchen door now varnished

Old kitchen door now varnished, both sides, this leads into the new Sun Room.

Day 91 – Friday 11th November 2016

Day 91 – Friday 11th November 2016

New Triangular Shaped glass, made to measure went in today over patio doors.  Also plaster boarding above hip roof inside new kitchen now finished.

new-kitchen-plaster-board-completed-above-hip-roof

Plasterboarding over the hip roof around patio doors now complete

plaster-board-complete-in-new-kitchen-over-hip-roof

plaster-board-complete-in-new-kitchen-over-hip-roof

patio-doors-and-triangular-glass-fitted-above

patio-doors-and-triangular-glass-fitted-above

new-patio-doors-with-triangular-window-fitted-above

new-patio-doors-with-triangular-window-fitted-above

new-triangular-window-over-patio-door

new-triangular-window-over-patio-door

Day 90 – Thursday 10th November 2016

Day 90 – Thursday 10th November 2016

blanket-insulation-in-sloping-roof-covered-by-plasterboard

blanket-insulation-in-sloping-roof-covered-by-plasterboard

close-up-of-blanket-insulation-above-patio-doors

close-up-of-blanket-insulation-above-patio-doors

view-through-new-kitchen-patio-windows-up-the-hillside-lovely-autumnal-day

view-through-new-kitchen-patio-windows-up-the-hillside-lovely-autumnal-day

Day 81 – Friday 28th October 2016

Day 81 – Friday 28th October 2016

Patio doors for kitchen arrived today

new-patio-doors-in-new-kitchen-from-inside

new-patio-doors-in-new-kitchen-from-inside

new-patio-doors-minus-the-apex-window-on-order-fitted-by-clive-and-chris

New patio doors minus the apex window on order fitted by Clive and Chris

new-patio-doors-to-new-kitchen-from-outside

new-patio-doors-to-new-kitchen-from-outside

new-patio-doors-to-new-kitchen-from-outside-2

new-patio-doors-to-new-kitchen-from-outside-2

Day 77 – Monday 24th October 2016

Day 77 – Monday 24th October 2016

plaster-board-up-on-new-kitchen-ceiling

Plaster board is now up on the 10 foot high ceiling. A mobile plasterboard hoist was used to lift it into place

plaster-board-up-on-new-kitchen-ceiling-picture-2-taken-from-front-to-back

plaster-board-up-on-new-kitchen-ceiling-picture-2-taken-from-front-to-back

plaster-board-on-right-hand-side-of-kitchen

plaster-board-on-right-hand-side-of-kitchen

left-hand-side-of-kitchen-showing-new-plaster-board-and-hatch

left-hand-side-of-kitchen-showing-new-plaster-board-and-hatch

back-garden-from-kitchen-looking-through-gap-for-patio-doors

A damp day today. The view of part of the back garden through the gap for the patio doors.

Day 72 – Tuesday 18th October 2016

Day 72 – Tuesday 18th October 2016

beginning-of-celotex-insulation-between-roof-and-beams-in-utility-room-cut-around-extractor

beginning-of-celotex-insulation-between-roof-and-beams-in-utility-room-cut-around-extractor

plaster-board-for-walls-and-insulation-for-ceiling-has-been-delivered

plaster-board-for-walls-and-insulation-for-ceiling-has-been-delivered

wiring-for-floor-plug-socket-in-new-kitchen

wiring-for-floor-plug-socket-in-new-kitchen

roof-over-back-of-kitchen-nearly-complete-resized

roof-over-back-of-kitchen-nearly-complete

wire-for-outside-light-through-back-wall

wire-for-outside-light-through-back-wall

wire-for-outside-light-through-back-wall-on-other-side-of-patio-window

wire-for-outside-light-through-back-wall-on-other-side-of-patio-window

roof-sloping-down-to-flat-roof-nearly-complete

roof-sloping-down-to-flat-roof-nearly-complete

different-view-of-flat-roof-and-tiling-nearly-complete

different-view-of-flat-roof-and-tiling-nearly-complete

Day 71 – Monday 17th October 2016

Day 71 – Monday 17th October 2016

Builder, Electrician and Plumber today. Heavy showers too, so roof not complete yet.

wall-at-front-where-patio-doors-going-has-been-levelled

wall at front where the patio doors are going has been levelled

kitchen-looking-through-window-from-hall-soon-to-be-removed

Looking through to new kitchen – window-from-hall-soon-to-be-removed and replaced with a door

new-steps-built-today-from-utility-to-new-kitchen-thet-are-not-level-at-the-top-as-the-kitchen-floor-has-not-been-built-up-yet

New steps-built-today-from-utility-to-new-kitchen. They are-not-level-at-the-top-as-the-kitchen-floor-has-not-been-built-up-yet

new-pipe-for-radiator-in-kitchen

new-pipe-for-radiator-in-kitchen

new-pipe-for-radiator-in-kitchen-2

new-pipe-for-radiator-in-kitchen picture 2

radiator-pipes-going-through-wall-to-new-bathroom

radiator-pipes-going-through-wall-to-new-bathroom

radiator-pipes-unning-around-flooring-will-be-below-level-of-floor-when-floor-has-been-put-in

radiator-pipes-running-around-flooring-will-be-below-level-of-floor-when-floor-has-been-put-in

switch-in-kitchen-on-left-at-the-top-of-the-new-steps

switch-in-kitchen-on-left-at-the-top-of-the-new-steps

new-switch-for-outside-light-just-outside-back-door

new-switch-for-outside-light-just-outside-back-door

old-outdoor-window-sill-now-chisled-away

old outdoor window sill now chiselled away

Day 59 – Thursday 29th September 2016

Day 59 – Thursday 29th September 2016

installation-of-plastic-and-foam-lining-to-seal-cavity-around-door

installation-of-plastic-and-foam-lining-to-seal-cavity-around-door

cavity-wall-closers-around-patio-doors

cavity-wall-closers-around-patio-doors

cavity-closers-around-windows

cavity-closers-around-windows

cavity-closers-around-windows-pic-3

cavity-closers-around-windows-pic-3

cavity-closers-around-windows-pic-2

cavity-closers-around-windows-pic-2

tiles-now-being-replaced-around-new-fibre-glass-roof-picture-from-scaffolding

tiles-now-being-replaced-around-new-fibre-glass-roof-picture-from-scaffolding

tiles-now-being-replaced-around-new-fibre-glass-roof-picture-2

tiles-now-being-replaced-around-new-fibre-glass-roof-picture-2

fibre-glass-roof

fibre-glass-roof

fibre-glass-roof-2-showing-valley

fibre-glass-roof-2-showing-valley

Day 57 – Tuesday 27th September 2016

Day 57 – Tuesday 27th September 2016

Fibre glass roofing over flat/sloping roof was completed today.  Fibre glass roofing was chosen as it is strong and durable and can last for 20 years.  It was the ideal solution to cover this kind of roof where all the tiled roofs meet.  An expert came out to do the job and it had to be a dry day.  There are several layers, the first of which is a fibre glass coated board, then a resin goes on, followed by the fibre glass matting, then more resin and finally a top coat. Photos are shown below.

Also today a mistake was noticed by the double glazing man in the hip above the patio doors when he was measuring, so this needs to be corrected.

hip-roof-has-been-constructed-incorrectly-one-angle-is-wrong-3-inches-out

hip-roof-has-been-constructed-incorrectly-one-angle-is-wrong-3-inches-out

hip-roof-has-been-constructed-incorrectly-picture-2

hip-roof-has-been-constructed-incorrectly-picture-2

hip-roof-has-been-constructed-incorrectly-picture-3

hip-roof-has-been-constructed-incorrectly-picture-3

hip-roof-has-been-constructed-incorrectly-picture-4

hip-roof-has-been-constructed-incorrectly-picture-4

hip-roof-being-reconstructed

hip-roof-being-reconstructed

hip-roof-being-reconstructed-2

hip-roof-being-reconstructed-2

fibre-glass-roof-between-sloping-roofs-completed-today-all-sealed-and-watertight-skylight-and-vents-are-also-sealed-in

fibre-glass-roof-between-sloping-roofs-completed-today-all-sealed-and-watertight-skylight-and-vents-are-also-sealed-in

fibre-glass-roof-shows-sloping-sections-and-new-skylight-and-vents-all-put-in-place-today

fibre-glass-roof-shows-sloping-sections-and-new-skylight-and-vents-all-put-in-place-today

fibre-glass-roof-took-a-day-to-do-and-sealed-with-a-special-glue

fibre-glass-roof-took-a-day-to-do-and-sealed-with-a-special resin and top coat

sealed-vent-for-utility-room-in-new-fibre-glass-roof

sealed-vent-for-utility-room-in-new-fibre-glass-roof

vent-put-in-new-bathroom

vent-put-in-new-bathroom

new-vent-can-be-seen-in-utility-room

new-vent-can-be-seen-in-utility-room

skylight-over-new-bathroom-to-be-in-place-natural-light-coming-through-is-considerable

skylight-over-new-bathroom-to-be-in-place natural-light-coming-through-is-considerable

bricks-in-place-over-back-door-outside-doors-and-windows-have-been-measured

bricks-in-place-over-back-door-outside-doors-and-windows-have-been-measured

blocked-up-old-bedroom-window

blocked-up-old-bedroom-window

2-doorways-now-opened-up-left-to-kitchen-right-to-new-bathroom-rubble-all-cleared-away

2-doorways-now-opened-up-left-to-kitchen-right-to-new-bathroom-rubble-all-cleared-away

a-fleet-of-white-vans-today

a-fleet-of-white-vans-today