Day 137 – Sunday 22nd January 2017 – back to phase 1 – near completion of the new family bathroom
Fitments all in place, door needs painting or varnishing and also handle required.
Interesting to compare it with how it used to look in September 2016. See the transformation below.

Small bedroom to new bathroom

small bedroom

rubble-to-be-removed-from-old-bedroom

old-bedroom-cleared-of-rubble-and-window-removed

drilling-and-loosening-brick-work-in-new-doorway-before-inserting-2-new-lintels

new-doorway-cut-into-old-bedroom-which-will-be-new-bathroom-picture-taken-from-utility-side

Spot Marcus, our plumber, in a very tight spot, under the floor in the new bathroom

new-bathroom-pipework-for-shower

plasterboarding-new-bathroom-beam-boxed-in

New family bathroom Old doorway from old bedroom to hall now plaster boarded over. Then new bathroom floor is laid. First a wooden flooring is laid and marked with a grid.

some-floor-tiles-and-wall-tiles-laid-in-new-bathroom

progress-in-new-bathroom-shower-boards-up-bath-fitted-shower-fitted

New Family Bathroom

New Family bathroom – right hand side

new-family-bathroom-picture-3