Day 182 – Wednesday 22nd March 2017 – phase 2

Day 182 – Wednesday 22nd March 2017 – phase 2

New staircase has arrived

New staircase has arrived!

Parts of the staircase

Parts of the staircase – spindles, rail, step

New staircase now fixed in place in our new sun lounge, looks so smart and takes up little room

First view of the new staircase to the upstairs bedroom – New staircase now fixed in place in our new sun lounge, looks so smart and takes up little room! So happy with it! Thanks to our builders Steve and Luke.

Side of staircase - no spindles yet

Side of staircase – no spindles yet

Looking up staircase

Looking up staircase

Front of the house at present, soon to be unwrapped

Front of the house at present, soon to be unwrapped

Roof now finished by Royston, all ridge tiles now on

Roof now finished by Royston, all ridge tiles now on

Ridge tiles

Ridge tiles

Ridge tiles all with clips to hold in place

Ridge tiles all with clips to hold in place

Ridge tile clips

Ridge tile clips

Tiling below dormer now also completed

Tiling below dormer now also completed

View looking down over the sloping roof of the dormer side of the house

View looking down over the sloping roof of the dormer side of the house

View over the back of the house and the new ride tiles that have replaced the old crumbling ones

View over the back of the house and the new ridge tiles that have replaced the old crumbling ones

Fixed ridge tiles

Fixed ridge tiles

Corner joint where 2 ridges join

Corner joint where 2 ridges join

View over the top flat roof with ridge tiles now back on, and new ones over the gables

View over the top flat roof with ridge tiles now back on, and new ones over the gables

Day 177 – Wednesday 15th March 2017 – phase 2

Day 177 – Wednesday 15th March 2017 – phase 2

Newly clad side of dormer

Newly clad side of dormer

Newly clad dormer and vent holes created in soffets

Newly clad dormer and vent holes created in soffits

Left side of the dormer also with new cladding

Left side of the dormer also with new cladding

retiling to be completed here on the corner and the ridge over the new bedroom

retiling to be completed here on the corner and the ridge over the new bedroom

new ridge tiles from new kitchen extension and back bedroom to the very original old part of the house

new ridge tiles stretching over the hall from new kitchen extension and back bedroom to the very original old part of the house

Newly tiled roof sloping down sharply to flat roof over utility, not quite completed

Newly tiled roof sloping down sharply to flat roof over utility, not quite completed

Ridge tiles to be completed here

Ridge tiles to be completed here

roof tiled over old kitchen

roof tiled over old kitchen

The three sloping roofs converging on the flat roof of the utility room

The three sloping roofs converging on the flat roof of the utility room

View of the three sloping roofs and view to garden beyond

View of the three sloping roofs and view to garden beyond

view round to flat roof over utility and newly tiled roof sloping down to utility room

view round to flat roof over utility and newly tiled roof sloping down to utility room

View through to field and the polytunnel from the flat roof over the new bedroom

View through to field and the polytunnel from the flat roof over the new bedroom

Wood for fitted wardrobes prepared

Wood for fitted wardrobes prepared

Day 176 – Tuesday 14th March 2017 – phase 2

Day 176 – Tuesday 14th March 2017 – phase 2

As an extra to the new upstairs build, and as recommended by our builder, we decided to have the rest of the roofing felt and battens renewed.  The felt on the old part of the house was in a bad state,  so tiles needed stripping off first.  In accordance with our bat licence we had two bat ecologists to supervise this part.

 

roofers at work

Roofers at work

 

The Bat Girls

The Bat Ecologists

felt and battening being replaced

felt and battening being replaced

New felt and battening for the rest of the roof that was not replaced during the new building of upstairs bedroom

New felt and battening for the rest of the roof that was not replaced during the new building of upstairs bedroom

New ridge tiles - ladder up from utility flat roof

New ridge tiles – ladder up from utility flat roof

roofers at work

roofers at work

small area of felt and battening being replaced on the right hand side of the house

small area of felt and battening being replaced on the right hand side of the house

Steve and Luke burning the old roof battens

Steve and Luke burning the old roof battens

view down to utility flat roof and skylight over new family bathroom

view down to utility flat roof and skylight over new family bathroom

View from flat roof over upstairs bedroom to right side of house, new ridge tiles and new felt and battening

View from flat roof over upstairs bedroom to right side of house, new ridge tiles and new felt and battening

View over from new flat roof over the new upstairs bedroom down to the back of the house where 3 steep rooves now converge onto utility roof

View over from new flat roof over the new upstairs bedroom down to the back of the house where 3 steep roofs now converge onto utility roof

View over roofs at back of house

View over roofs at back of house

view over flat roof of dormer, just visible

view over flat roof of dormer, just visible

view to front of house from flat roof

view to front of house from flat roof

VIew to front of house from new flar roof over the bedroom

View to front of house from new flat roof over the bedroom

View to velux side of house

View to velux side of house

window sill at dormer

window sill at dormer

New window sill in master bedroom

New window sill in master bedroom

New window sill at small window

New window sill at small window

sun lounge - scaffolding for painting and ladders still the only access to the upstairs

sun lounge – scaffolding for painting and ladders still the only access to the upstairs

New lights up and running in master bedroom by ballen Electrical

New lights up and running in master bedroom by Ballan Electrical, 9 lights in total, excellent lighting

Study lights and wood rof new cupboard over stairs

Study lights, 3, put in by Joe, and wood for new cupboard over stairs

lights over stairs

lights over stairs

No stairs yet, access by ladder

No stairs yet, access by ladder

Day 168 – Friday 3rd March 2017 – phase 2

Day 168 – Friday 3rd March 2017 –   phase 2

Extremely wet day today, but due to canopy over the house, the roofer was still able to work.

royston-roofer

Royston Collier has been the roofer for phase 2

royston-roofer-back-of-van

Royston the roofer back-of-van

royston-tiling-the-sloping-sides-of-the-gables

royston-tiling-the-sloping-sides-of-the-gables

ridge-tiling

Tiling of all the ridges around the flat roof

ridge-tiling-2

ridge-tiling-2

ridge-tiling-pic2

ridge-tiling-pic2

ridge-tiles-on-scaffolding

ridge-tiles-on-scaffolding

ensuite-bathroom-plastered

Ensuite bathroom has been plastered

top-of-stair-wall-plastered-wires-are-for-the-top-of-the-stairs-lights

Top of stair wall plastered. Wires are for the top of the stairs light switches (Joe O’Hara – Ballan Electrical)

plastering-in-the-study-so-far-velux-window-visible

Plastering in the study so far. Velux window visible

formation-of-cupboard-over-the-staircase-accessed-from-study

Formation of the over the stairs cupboard, now all boxed in and plaster-boarded, accessed from the study

very-high-ceiling-over-where-the-staircase-will-be-all-plastered

very-high-ceiling-over-where-the-staircase-will-be. Top ceiling is now all plastered. Small hole is for light.

old-porch-roof-has-had-noggins-put-in-for-extra-support

Old Porch Roof has had noggins inserted for extra strength

old-porch-roof-with-noggins-inserted

old-porch-roof-with-noggins-inserted

Day 79 – Wednesday 26th October 2016

Day 79 – Wednesday 26th October 2016

progress-on-roof-today

Progress on the roof – Day 79

close-up-of-roof-progress

close-up-of-roof-progress

roof-zoomed-in

Ridge tiles not yet in final position

roof-between-old-and-new-building

roof-between-old-and-new-building

roof-between-old-and-new-building-from-step-ladder

roof-between-old-and-new-building-from-step-ladder

roof-between-old-and-new-building-from-step-ladder-2

roof-between-old-and-new-building-from-step-ladder-2

new-bathroom-pipework-under-floor-boards

new-bathroom-pipework-under-floor-boards

new-bathroom-pipework-under-floor-boards-2

new-bathroom-pipework-under-floor-boards-2

new-bathroom-pipework-under-floor-boards-3

new-bathroom-pipework-under-floor-boards-3

new-bathroom-pipework-for-shower

new-bathroom-pipework-for-shower