Tag Archives: progress

Day 194 – Tuesday 2nd May 2017 – phase 2

Day 194 – Tuesday 2nd May 2017 – phase 2

Upstairs Bathroom progress - toilet and shower installed and radiator

Upstairs Bathroom Progress – toilet and shower installed and radiator

Bathroom shower shower boards and screen

Bathroom shower, showerboards and screen installed by Marcus Kelly and assistant Josh

Shower installed

Shower installed

Upstairs bathroom - toilet installed and wall tiles grouted

Upstairs bathroom – toilet installed and wall tiles grouted

Day 192 – Wednesday 26th April 2017 – phase 2

Day 192 – Wednesday 26th April 2017 – phase 2

Bathroom upstairs partly tiled and floor boarded, screwed down and tiled over, by Marcus Kelly, plumber and Josh

Bathroom upstairs partly tiled and floor boarded, screwed down and tiled over, by Marcus Kelly, plumber and Josh

Upstairs bathroom progress so far

Upstairs bathroom progress so far

Day 163 – Friday 24th February 2017 – phase 2

Day 163 – Friday 24th February 2017 – phase 2

Windows arrived today.  Most of plaster boarding was finished.  Looking brilliant.

bathroom-window-with-obscure-glass

Bathroom window fitted with obscure glass

small-bedroom-window-installed

small-bedroom-window-installed

large-bedroom-window-installed

large-bedroom-window-installed

view-from-back-of-bedroom-to-front

view-from-back-of-bedroom-to-front 3 windows all just visible in this picture Dormer window boarded up till window is ready

progress-on-the-bedroom-ready-for-plasterers

progress-on-the-bedroom-ready-for-plasterers.   Dormer window on the right – the brown wood area

bedroom-dormer-boarded-up-till-window-is-ready

bedroom-dormer-boarded-up-till-window-is-ready. Pink plasterboard over the beam

bedroom-view-from-ensuite-pink-plasterboard-is-firelined-to-protect-beams

bedroom-view-from-ensuite-pink-plasterboard-is-firelined-to-protect-beams

study-area-plasterboarded

study-area-plaster boarded

ladders-to-bedroom

ladders-to-bedroom

Day 151 – Wednesday 8th February 2017 – phase 2

Day 151 – Wednesday 8th February 2017 – phase 2

view-of-inside-of-new-upstairs-from-right-the-progress-so-far

view-of-inside-of-new-upstairs-from-right-the-progress-so-far

rafters-on-the-left-side-of-the-house-in-place

rafters-on-the-left-side-of-the-house-in-place

the-left-side-of-the-house-start-of-the-dormer-window

the-left-side-of-the-house-start-of-the-dormer-window

the-left-side-of-the-house-start-of-the-dormer-window-pic-2

the-left-side-of-the-house-start-of-the-dormer-window-pic-2

second-ridge-beam-in-place-where-left-hand-gable-will-be-positioned

second-ridge-beam-in-place-where-left-hand-gable-will-be-positioned

view-of-2nd-ridge-beam-from-right

view-of-2nd-ridge-beam-from-right

Day 135 and 136 – Friday 20th January and Saturday 21st January 2017 – phase 2

Day 135 and 136 – Friday 20th January and Saturday 21st January 2017 – phase 2

men-at-work-day-135

men-at-work-day-135

centre-window

centre-window

new-concrete-window-sill

new-concrete-window-sill

progress-day-135

progress-day-135

small-beam-over-new-window-opening

small-beam-over-new-window-opening

view-from-left-hand-side

view-from-left-hand-side

view-of-new-window-openings-and-small-steel-support-above-new-window

view-of-new-window-openings-and-small-steel-support-above-new-window

view-of-new-window-openings-from-right-hand-side

view-of-new-window-openings-from-right-hand-side

view-through-to-bedroom-from-scaffolding

view-through-to-bedroom-from-scaffolding

view-of-new-window-openings-from-second-level-of-scaffolding

view-of-new-window-openings-from-second-level-of-scaffolding

view-of-new-window-openings-from-scaffolding

view-of-new-window-openings-from-scaffolding

Part of phase 1 being completed, the outside rendering of the new kitchen, Friday and Saturday

new-tyrolean-render-applied-today

new-tyrolean-render-applied-today

new-tyrolean-render-applied-side-of-new-kitchen

new-tyrolean-render-applied-side-of-new-kitchen

Day 133 – Wednesday 18th January 2017 – phase 2

Day 133 – Wednesday 18th January 2017 – phase 2

progress-after-day-133-new-wall-going-up-over-new-supporting-beam-at-front-of-house

progress-after-day-133-new-wall-going-up-over-new-supporting-beam-at-front-of-house

front-of-house-so-far-with-new-wall

front-of-house-so-far-with-new-wall

new-wall-over-new-supporting-beam-over-old-porch-roof

new-wall-over-new-supporting-beam-over-old-porch-roof

another-view-of-new-wall-over-old-porch

another-view-of-new-wall-over-old-porch

new-supporting-beam-as-seen-from-right-side-of-scaffolding

new-supporting-beam-as-seen-from-right-side-of-scaffolding

new-wall-over-right-side-of-house-front

new-wall-over-right-side-of-house-front

left-side-of-house-from-scaffolding-showing-new-wall-going-up-over-the-front-of-the-house-on-the-new-support-beam

left-side-of-house-from-scaffolding-showing-new-wall-going-up-over-the-front-of-the-house-on-the-new-support-beam

left-side-where-tiles-were-removed-yesterday-for-insertion-of-the-large-supporting-steel-next-week

left-side-where-tiles-were-removed-yesterday-for-insertion-of-the-large-supporting-steel-next-week

area-of-roof-where-tiles-were-removed-yesterday-with-bat-ecologists-this-is-where-a-huge-steel-beam-will-be-inserted-into-the-house-for-the-support-of-the-roof-and-the-new-wall-will-be-built-on-top

area-of-roof-where-tiles-were-removed-yesterday-with-bat-ecologists-this-is-where-a-huge-steel-beam-will-be-inserted-into-the-house-for-the-support-of-the-roof-and-the-new-wall-will-be-built-on-top

right-side-of-house-roof

right-side-of-house-roof

top-of-old-balcony-window-just-visible-from-scaffolding

top-of-old-balcony-window-just-visible-from-scaffolding

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area-pic-2

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area-pic-2

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area-pic-3

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area-pic-3

Day 129 – Thursday 12th January 2017 – Phase 2

Day 129 – Thursday 12th January 2017 – Phase 2

Day 3 only for phase 2, the building of the master bedroom, ensuite and small study.

Progress has been very quick in 3 days.  The balcony and huge vaulted ceiling has been removed, new beams for bedroom floor are in place and gap left for a staircase. Partitioning has started today.

front-of-house-12-1-17

front-of-house-12-1-17 for reference!

c

front-of-house-12-1-17

old-chandelier

old-chandelier

cutting-machinery-for-beams-and-partition-walls

cutting-machinery-for-beams-and-partition-walls

work-above-the-new-beams

work-above-the-new-beams

view-of-new-upstairs

view-of-new-upstairs

view-of-the-work-completed-today-at-new-bedroom-floor-level

view-of-the-work-completed-today-at-new-bedroom-floor-level

partitioning-wall-has-been-partially-completed-on-the-right-this-will-be-the-supporting-beam-for-new-roof

partition-wall-has-been-partially-completed-on-the-right-this-will-be-the-supporting-beam-for-new-roof

view-down-to-the-hall-below

view-down-to-the-hall-below

inspection-going-on

inspection-going-on

walking-the-plank

walking-the-plank

ladders-to-this-level-this-is-where-the-stairs-will-come-up-also-view-of-work-and-new-beams

ladders-to-this-level-this-is-where-the-stairs-will-come-up-also-view-of-work-and-new-beams

Day 114 – Friday 9th December 2016

Day 114 – Friday 9th December 2016 (no work carried out on Thursday)

path-between-garage-and-new-kitchen-slabs-cut

Path between garage and kitchen. More Indian Sandstone slabs were delivered and have been cut.

path-between-garage-and-new-kitchen-from-back-to-front-of-house

path-between-garage-and-new-kitchen-from-back-to-front-of-house

progress-of-patio-at-back-of-kitchen

progress-of-patio-at-back-of-kitchen

Day 101 – Friday 25th November 2016

Day 101 – Friday 25th November 2016

steps-up-to-patio-from-new-patio-area-taking-shape

steps-up-to-patio-from-new-patio-area-taking-shape

another-view-of-step-progress-up-to-patio

another-view-of-step-progress-up-to-patio

new-bedroom-plastered-now-drying-out

new-bedroom-plastered-now-drying-out

new-bedroom-plastered-now-drying-out-pic-3

new-bedroom-plastered-now-drying-out-pic-3

new-bedroom-plastered-now-drying-out-pic-2

new-bedroom-plastered-now-drying-out-pic-2

wills-helping-out-drying-the-plaster-on-ceiling-ready-for-painting

wills-helping-out-drying-the-plaster-on-ceiling-ready-for-painting

new-kitchen-with-1st-coat-of-paint-on-ceiling

new-kitchen-with-1st-coat-of-paint-on-ceiling

painted-kitchen-another-coat-to-go

painted-kitchen-another-coat-to-go

kitchen-with-another-coat-of-paint

kitchen-with-another-coat-of-paint

hip-roof-plaster-now-drying-out

hip-roof-plaster-now-drying-out

laminate-flooring-for-kitchen-delivered

laminate-flooring-for-kitchen-delivered

Day 100 – Thursday 24th November 2016

Day 100 – Thursday 24th November 2016

Plastering and outside work on new patio

 

back-of-ne-kitchen

Back of new kitchen and Bedroom – scaling all levelled

walkway-between-garage-and-new-kitchen-stones-laid-to-form-a-ramp

walkway-between-garage-and-new-kitchen-stones-laid-to-form-a-ramp

plaster-repaired-around-new-doorway-entrance-to-kitchen-from-corridor

plaster-repaired-around-new-doorway-entrance-to-kitchen-from-corridor

ceiling-in-new-bathroom-now-totally-replastered

ceiling-in-new-bathroom-now-totally-replastered

new-small-bedroom-converted-from-sauna-last-year-walls-prepared-and-patched-ready-for-skim-coat-of-plaster

new-small-bedroom-converted-from-sauna-last-year-walls-prepared-and-patched-ready-for-skim-coat-of-plaster

new-small-bedroomblurred-picture-no-light-walls-prepared-for-plastering

new-small-bedroom blurred-picture-no-light-walls-prepared-for-plastering

hip-roof-area-plastered-inside

hip-roof-area-plastered-inside

new-kitchen-ceiling-plaster-starting-to-dry-out-slowly

new-kitchen-ceiling-plaster-starting-to-dry-out-slowly

utility-area-ceiling-painted

utility-area-ceiling-painted

utility-area-wall-and-ceiling-painted

utility-area-wall-and-ceiling-painted