Tag Archives: progress

Day 194 – Tuesday 2nd May 2017 – phase 2

Day 194 – Tuesday 2nd May 2017 – phase 2

Upstairs Bathroom progress - toilet and shower installed and radiator

Upstairs Bathroom Progress – toilet and shower installed and radiator

Bathroom shower shower boards and screen

Bathroom shower, showerboards and screen installed by Marcus Kelly and assistant Josh

Shower installed

Shower installed

Upstairs bathroom - toilet installed and wall tiles grouted

Upstairs bathroom – toilet installed and wall tiles grouted

Day 163 – Friday 24th February 2017 – phase 2

Day 163 – Friday 24th February 2017 – phase 2

Windows arrived today.  Most of plaster boarding was finished.  Looking brilliant.

bathroom-window-with-obscure-glass

Bathroom window fitted with obscure glass

small-bedroom-window-installed

small-bedroom-window-installed

large-bedroom-window-installed

large-bedroom-window-installed

view-from-back-of-bedroom-to-front

view-from-back-of-bedroom-to-front 3 windows all just visible in this picture Dormer window boarded up till window is ready

progress-on-the-bedroom-ready-for-plasterers

progress-on-the-bedroom-ready-for-plasterers.   Dormer window on the right – the brown wood area

bedroom-dormer-boarded-up-till-window-is-ready

bedroom-dormer-boarded-up-till-window-is-ready. Pink plasterboard over the beam

bedroom-view-from-ensuite-pink-plasterboard-is-firelined-to-protect-beams

bedroom-view-from-ensuite-pink-plasterboard-is-firelined-to-protect-beams

study-area-plasterboarded

study-area-plaster boarded

ladders-to-bedroom

ladders-to-bedroom

Day 151 – Wednesday 8th February 2017 – phase 2

Day 151 – Wednesday 8th February 2017 – phase 2

view-of-inside-of-new-upstairs-from-right-the-progress-so-far

view-of-inside-of-new-upstairs-from-right-the-progress-so-far

rafters-on-the-left-side-of-the-house-in-place

rafters-on-the-left-side-of-the-house-in-place

the-left-side-of-the-house-start-of-the-dormer-window

the-left-side-of-the-house-start-of-the-dormer-window

the-left-side-of-the-house-start-of-the-dormer-window-pic-2

the-left-side-of-the-house-start-of-the-dormer-window-pic-2

second-ridge-beam-in-place-where-left-hand-gable-will-be-positioned

second-ridge-beam-in-place-where-left-hand-gable-will-be-positioned

view-of-2nd-ridge-beam-from-right

view-of-2nd-ridge-beam-from-right

Day 135 and 136 – Friday 20th January and Saturday 21st January 2017 – phase 2

Day 135 and 136 – Friday 20th January and Saturday 21st January 2017 – phase 2

men-at-work-day-135

men-at-work-day-135

centre-window

centre-window

new-concrete-window-sill

new-concrete-window-sill

progress-day-135

progress-day-135

small-beam-over-new-window-opening

small-beam-over-new-window-opening

view-from-left-hand-side

view-from-left-hand-side

view-of-new-window-openings-and-small-steel-support-above-new-window

view-of-new-window-openings-and-small-steel-support-above-new-window

view-of-new-window-openings-from-right-hand-side

view-of-new-window-openings-from-right-hand-side

view-through-to-bedroom-from-scaffolding

view-through-to-bedroom-from-scaffolding

view-of-new-window-openings-from-second-level-of-scaffolding

view-of-new-window-openings-from-second-level-of-scaffolding

view-of-new-window-openings-from-scaffolding

view-of-new-window-openings-from-scaffolding

Part of phase 1 being completed, the outside rendering of the new kitchen, Friday and Saturday

new-tyrolean-render-applied-today

new-tyrolean-render-applied-today

new-tyrolean-render-applied-side-of-new-kitchen

new-tyrolean-render-applied-side-of-new-kitchen

Day 133 – Wednesday 18th January 2017 – phase 2

Day 133 – Wednesday 18th January 2017 – phase 2

progress-after-day-133-new-wall-going-up-over-new-supporting-beam-at-front-of-house

progress-after-day-133-new-wall-going-up-over-new-supporting-beam-at-front-of-house

front-of-house-so-far-with-new-wall

front-of-house-so-far-with-new-wall

new-wall-over-new-supporting-beam-over-old-porch-roof

new-wall-over-new-supporting-beam-over-old-porch-roof

another-view-of-new-wall-over-old-porch

another-view-of-new-wall-over-old-porch

new-supporting-beam-as-seen-from-right-side-of-scaffolding

new-supporting-beam-as-seen-from-right-side-of-scaffolding

new-wall-over-right-side-of-house-front

new-wall-over-right-side-of-house-front

left-side-of-house-from-scaffolding-showing-new-wall-going-up-over-the-front-of-the-house-on-the-new-support-beam

left-side-of-house-from-scaffolding-showing-new-wall-going-up-over-the-front-of-the-house-on-the-new-support-beam

left-side-where-tiles-were-removed-yesterday-for-insertion-of-the-large-supporting-steel-next-week

left-side-where-tiles-were-removed-yesterday-for-insertion-of-the-large-supporting-steel-next-week

area-of-roof-where-tiles-were-removed-yesterday-with-bat-ecologists-this-is-where-a-huge-steel-beam-will-be-inserted-into-the-house-for-the-support-of-the-roof-and-the-new-wall-will-be-built-on-top

area-of-roof-where-tiles-were-removed-yesterday-with-bat-ecologists-this-is-where-a-huge-steel-beam-will-be-inserted-into-the-house-for-the-support-of-the-roof-and-the-new-wall-will-be-built-on-top

right-side-of-house-roof

right-side-of-house-roof

top-of-old-balcony-window-just-visible-from-scaffolding

top-of-old-balcony-window-just-visible-from-scaffolding

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area-pic-2

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area-pic-2

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area-pic-3

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area-pic-3

Day 129 – Thursday 12th January 2017 – Phase 2

Day 129 – Thursday 12th January 2017 – Phase 2

Day 3 only for phase 2, the building of the master bedroom, ensuite and small study.

Progress has been very quick in 3 days.  The balcony and huge vaulted ceiling has been removed, new beams for bedroom floor are in place and gap left for a staircase. Partitioning has started today.

front-of-house-12-1-17

front-of-house-12-1-17 for reference!

c

front-of-house-12-1-17

old-chandelier

old-chandelier

cutting-machinery-for-beams-and-partition-walls

cutting-machinery-for-beams-and-partition-walls

work-above-the-new-beams

work-above-the-new-beams

view-of-new-upstairs

view-of-new-upstairs

view-of-the-work-completed-today-at-new-bedroom-floor-level

view-of-the-work-completed-today-at-new-bedroom-floor-level

partitioning-wall-has-been-partially-completed-on-the-right-this-will-be-the-supporting-beam-for-new-roof

partition-wall-has-been-partially-completed-on-the-right-this-will-be-the-supporting-beam-for-new-roof

view-down-to-the-hall-below

view-down-to-the-hall-below

inspection-going-on

inspection-going-on

walking-the-plank

walking-the-plank

ladders-to-this-level-this-is-where-the-stairs-will-come-up-also-view-of-work-and-new-beams

ladders-to-this-level-this-is-where-the-stairs-will-come-up-also-view-of-work-and-new-beams

Day 114 – Friday 9th December 2016

Day 114 – Friday 9th December 2016 (no work carried out on Thursday)

path-between-garage-and-new-kitchen-slabs-cut

Path between garage and kitchen. More Indian Sandstone slabs were delivered and have been cut.

path-between-garage-and-new-kitchen-from-back-to-front-of-house

path-between-garage-and-new-kitchen-from-back-to-front-of-house

progress-of-patio-at-back-of-kitchen

progress-of-patio-at-back-of-kitchen

Day 101 – Friday 25th November 2016

Day 101 – Friday 25th November 2016

steps-up-to-patio-from-new-patio-area-taking-shape

steps-up-to-patio-from-new-patio-area-taking-shape

another-view-of-step-progress-up-to-patio

another-view-of-step-progress-up-to-patio

new-bedroom-plastered-now-drying-out

new-bedroom-plastered-now-drying-out

new-bedroom-plastered-now-drying-out-pic-3

new-bedroom-plastered-now-drying-out-pic-3

new-bedroom-plastered-now-drying-out-pic-2

new-bedroom-plastered-now-drying-out-pic-2

wills-helping-out-drying-the-plaster-on-ceiling-ready-for-painting

wills-helping-out-drying-the-plaster-on-ceiling-ready-for-painting

new-kitchen-with-1st-coat-of-paint-on-ceiling

new-kitchen-with-1st-coat-of-paint-on-ceiling

painted-kitchen-another-coat-to-go

painted-kitchen-another-coat-to-go

kitchen-with-another-coat-of-paint

kitchen-with-another-coat-of-paint

hip-roof-plaster-now-drying-out

hip-roof-plaster-now-drying-out

laminate-flooring-for-kitchen-delivered

laminate-flooring-for-kitchen-delivered

Day 100 – Thursday 24th November 2016

Day 100 – Thursday 24th November 2016

Plastering and outside work on new patio

 

back-of-ne-kitchen

Back of new kitchen and Bedroom – scaling all levelled

walkway-between-garage-and-new-kitchen-stones-laid-to-form-a-ramp

walkway-between-garage-and-new-kitchen-stones-laid-to-form-a-ramp

plaster-repaired-around-new-doorway-entrance-to-kitchen-from-corridor

plaster-repaired-around-new-doorway-entrance-to-kitchen-from-corridor

ceiling-in-new-bathroom-now-totally-replastered

ceiling-in-new-bathroom-now-totally-replastered

new-small-bedroom-converted-from-sauna-last-year-walls-prepared-and-patched-ready-for-skim-coat-of-plaster

new-small-bedroom-converted-from-sauna-last-year-walls-prepared-and-patched-ready-for-skim-coat-of-plaster

new-small-bedroomblurred-picture-no-light-walls-prepared-for-plastering

new-small-bedroom blurred-picture-no-light-walls-prepared-for-plastering

hip-roof-area-plastered-inside

hip-roof-area-plastered-inside

new-kitchen-ceiling-plaster-starting-to-dry-out-slowly

new-kitchen-ceiling-plaster-starting-to-dry-out-slowly

utility-area-ceiling-painted

utility-area-ceiling-painted

utility-area-wall-and-ceiling-painted

utility-area-wall-and-ceiling-painted