Day 196 – Thursday 4th May 2017 – LAST DAY of work on phase 2

Day 196 – Thursday 4th May 2017  – LAST DAY of work on phase 2

Workmen finished today on Springdale after 196 days of men on site.  Work has been on going since June 26th 2016.  Plumber – Marcus Kelly and his mate Josh completed their work on the upstairs bathroom and radiators in the sunroom, bedroom and study.  Their work looks first class.  Springdale is now a totally different place to the house we bought over 2 years ago.

Internal work is still to be completed, but this will be on going for some time.

Pictures of the upstairs bathroom work can be seen below.

View of shower area and towel radiator

View of shower area and towel radiator

Bathroom all finished

Upstairs Bathroom all finished

view to bathroom window

view to bathroom window

New toilet and wash basin

New toilet and wash basin

View of shower, reflection of window in showerboard

View of shower, reflection of window in showerboard

Radiator towel rail in new upstairs bathroom

Radiator towel rail in new upstairs bathroom

Bathroom all finished - view of new shower, showerboards and screen

Bathroom all finished – view of new shower, showerboards and screen

Day 194 – Tuesday 2nd May 2017 – phase 2

Day 194 – Tuesday 2nd May 2017 – phase 2

Upstairs Bathroom progress - toilet and shower installed and radiator

Upstairs Bathroom Progress – toilet and shower installed and radiator

Bathroom shower shower boards and screen

Bathroom shower, showerboards and screen installed by Marcus Kelly and assistant Josh

Shower installed

Shower installed

Upstairs bathroom - toilet installed and wall tiles grouted

Upstairs bathroom – toilet installed and wall tiles grouted

Day 165 – Tuesday 28th February 2017 – phase 2

Day 165 – Tuesday 28th February 2017 – phase 2

old-front-and-porch-at-the-beginning-of-tuesday-28th-february-steel-beam-in-place

old-front-and-porch-at-the-beginning-of-tuesday-28th-february-steel-beam-in-place

old-front-and-porch-at-the-end-of-tuesday-28th-february-scratch-coat-applied-over-beam

old-front-and-porch-at-the-end-of-tuesday-28th-february-scratch-coat-applied-over-beam

dormer-from-the-outside-progress-so-far

dormer-from-the-outside-progress-so-far

doorway-with-frame-in-place-skimmed-with-plaster

bedroom doorway-with-frame-in-place-skimmed-with-plaster

plastering-continues-upstairs-in-the-new-bedroom-view-over-to-staircase-through-lefthand-doorway-and-to-ensuite-through-right-hand-doorway

plastering-continues-upstairs-in-the-new-bedroom-view-over-to-staircase-through-left hand-doorway-and-to-ensuite-through-right-hand-doorway

view-across-to-dormer-side-of-bedroom-and-plastering-on-this-side-of-bedroom-and-around-beam

view-across-to-dormer-side-of-bedroom-and-plastering-on-this-side-of-bedroom-and-around-beam

top-and-bottom-of-small-window-upstairs-skimmed-with-plaster

top-and-bottom-of-small-window-upstairs-skimmed-with-plaster

window-sill-and-around-windows-skimmed-with-plaster

window-sill-and-around-windows-skimmed-with-plaster

view-through-to-old-hall-from-new-upstairs-study-this-is-where-a-new-cupboard-will-be-built-over-the-new-staircase

view-through-to-old-hall-from-new-upstairs-study-this-is-where-a-new-cupboard-will-be-built-over-the-new-staircase

view-from-scaffolding-of-windows-which-have-now-been-prepared-for-rendering

view-from-scaffolding-of-windows-which-have-now-been-prepared-for-rendering

upstairs-bedroom-windows-being-prepared-for-rendering-mesh-installed-around-sides

upstairs-bedroom-windows-being-prepared-for-rendering-mesh-installed-around-sides

toilet-waste-pipe-in-place-in-ensuite-with-water-supply-pipe-at-the-side

toilet-waste-pipe-in-place-in-ensuite-with-water-supply-pipe-at-the-side

toilet-waste-pipe-in-place-in-ensuite

toilet-waste-pipe-in-place-in-ensuite

toilet-waste-pipe-now-in-position-through-the-back-of-the-eaves-to-the-outside

toilet-waste-pipe-now-in-position-through-the-back-of-the-eaves-to-the-outside

waste-pipe-from-toilet-just-visible-coming-to-the-outside-of-the-house

waste-pipe-from-toilet-just-visible-coming-to-the-outside-of-the-house

waste-pipe-for-wash-hand-basin-in-ceiling-at-the-edge-of-the-old-hall

waste-pipe-for-wash-hand-basin-in-ceiling-at-the-edge-of-the-old-hall. A white pipe which joins up with the waste water from the shower. This will join the outside waste pipe outside the house on the side

waste-water-pipe-for-shower

waste-water-pipe-for-shower

waste-pipe-for-wash-hand-basin-in-ensuite-with-water-supply-pipe-holes-behind

waste-pipe-for-wash-hand-basin-in-ensuite-with-water-supply-pipe-holes-behind

waste-water-pipe-for-wash-basin

waste-water-pipe-for-wash-basin

waste-water-pipe-to-outside-from-shower-to-be-joined-to-main-waste-pipe

waste-water-pipe-to-outside-from-shower-to-be-joined-to-main-waste-pipe

pipes-for-hot-and-cold-water-going-through-into-old-porch-ceiling-and-up-to-the-new-upstairs

pipes-for-hot-and-cold-water-going-through-into-old-porch-ceiling-and-up-to-the-new-upstairs

hot-and-cold-water-pipes-to-upstairs-in-ceiling-of-old-hall-thinner-pipes-are-radiator-pipes

hot-and-cold-water-pipes-to-upstairs-in-ceiling-of-old-hall-thinner-pipes-are-radiator-pipes

hot-and-cold-water-pipes-and-radiator-pipes-for-upstairs

hot-and-cold-water-pipes-and-radiator-pipes-for-upstairs

plasterboarding-at-the-side-of-the-dormer

plaster boarding-at-the-side-of-the-dormer

Days 156-159 Wednesday 15th February Monday 20th February 2017

Days 156-159  Wednesday 15th February Monday 20th February 2017

Away for a few days in Edinburgh at a wedding so loads of progress on the build whilst we were in Scotland

 

dormer-from-side-and-felt-and-battening-on-roof

dormer-from-side-and-felt-and-battening-on-roof

Roofers have been in and working on both sides of the house

felt-battening-and-dormer

felt-battening-and-dormer

new-dormer-structure

new-dormer-structure

roof-tiled-on-the-right-side-of-house-and-around-the-velux

roof-tiled-on-the-right-side-of-house-and-around-the-velux

scratch-coat-at-top-of-new-front-wall-viewed-from-the-right-side

scratch-coat-at-top-of-new-front-wall-viewed-from-the-right-side

scratch-coat-at-top-of-new-front-wall

scratch-coat-at-top-of-new-front-wall

scratch-coat-on-gable-end

scratch-coat-on-gable-end

view-of-scratch-coat-from-the-left-and-the-felt-and-battening

view-of-scratch-coat-from-the-left-and-the-felt-and-battening

pipes-for-radiator-in-bedroom-under-dormer-window

pipes-for-radiator-in-bedroom-under-dormer-window installed by Marcus Kelly our plumber

pipes-laid-by-plumber-around-new-eaves

pipes-laid-by-plumber-around-new-eaves

area-marked-for-new-walk-in-shower

area-marked-for-new-walk-in-shower

partition-wall-in-front-of-new-eaves-in-bathroom

partition-wall-in-front-of-new-eaves-in-bathroom

insulation-in-new-bathroom-around-window

insulation-in-new-bathroom-around-window

partition-wall-between-study-and-staircase-area

partition-wall-between-study-and-staircase-area

study-and-plasterboarding

study-and-plaster ensuiteboarding

view-of-large-window-in-new-bedroom-from-ensuite

view-of-large-window-in-new-bedroom-from-ensuite

view-of-dormer-from-inside

view-of-dormer-from-inside

bedroom-marked-out-to-establish-positions-of-light-switches-and-plug-sockets

bedroom-marked-out-to-establish-positions-of-light-switches-and-plug-sockets, wiring all in for lights, all installed by Joe O’Hara, Ballen Electrical

electrician-ballen-electrical-has-marked-up-reference-point-for-switches-to-be-transferred-when-plaster-board-is-put-into-place

electrician-ballen-electrical-has-marked-up-reference-point-for-switches-to-be-transferred-when-plaster-board-is-put-into-place

Day 137 – Sunday 22nd January 2017 – back to phase 1

Day 137 – Sunday 22nd January 2017 – back to phase 1 – near completion of the new family bathroom

Fitments all in place, door needs painting or varnishing and also handle required.

Interesting to compare it with how it used to look in September 2016.  See the transformation below.

saturday-3rd-september-small-bedroom-roof-leaked-badly-tiles-have-been-removed

Small bedroom to new bathroom

wet-room-roof-leaking-again

small bedroom

rubble-to-be-removed-from-old-bedroom

rubble-to-be-removed-from-old-bedroom

old-bedroom-cleared-of-rubble-and-window-removed

old-bedroom-cleared-of-rubble-and-window-removed

drilling-and-loosening-brick-work-in-new-doorway-before-inserting-2-new-lintels

drilling-and-loosening-brick-work-in-new-doorway-before-inserting-2-new-lintels

new-doorway-cut-into-old-bedroom-which-will-be-new-bathroom-picture-taken-from-utility-side

new-doorway-cut-into-old-bedroom-which-will-be-new-bathroom-picture-taken-from-utility-side

marcus-the-plumber-in-a-very-tight-spot-under-the-floor-in-the-new-bathroom

Spot Marcus, our plumber, in a very tight spot, under the floor in the new bathroom

new-bathroom-pipework-for-shower

new-bathroom-pipework-for-shower

plasterboarding-new-bathroom-beam-boxed-in

plasterboarding-new-bathroom-beam-boxed-in

new-bathroom-wood-floor-laid-first

New family bathroom Old doorway from old bedroom to hall now plaster boarded over. Then new bathroom floor is laid. First a wooden flooring is laid and marked with a grid.

some-floor-tiles-and-wall-tiles-laid-in-new-bathroom

some-floor-tiles-and-wall-tiles-laid-in-new-bathroom

progress-in-new-bathroom-shower-bords-up-bath-fitted-shower-fitted

progress-in-new-bathroom-shower-boards-up-bath-fitted-shower-fitted

new-family-bathroom-picture-2

New Family Bathroom

new-family-bathroom

New Family bathroom – right hand side

new-family-bathroom-picture-3

new-family-bathroom-picture-3

Day 121 – Monday 19th December 2016

Day 121 – Monday 19th December 2016

newly-tiled-bathroom

Newly tiled bathroom

progress-in-new-bathroom-shower-bords-up-bath-fitted-shower-fitted

progress-in-new-bathroom-shower-boards-up-bath-fitted-shower-fitted

view-of-bath-shower-shower-board-and-tiles

view-of-bath-shower-shower-board-and-tiles

Bath filled with water whilst it sets in place.  This will prevent movement of bath when using shower and bath.

Day 79 – Wednesday 26th October 2016

Day 79 – Wednesday 26th October 2016

progress-on-roof-today

Progress on the roof – Day 79

close-up-of-roof-progress

close-up-of-roof-progress

roof-zoomed-in

Ridge tiles not yet in final position

roof-between-old-and-new-building

roof-between-old-and-new-building

roof-between-old-and-new-building-from-step-ladder

roof-between-old-and-new-building-from-step-ladder

roof-between-old-and-new-building-from-step-ladder-2

roof-between-old-and-new-building-from-step-ladder-2

new-bathroom-pipework-under-floor-boards

new-bathroom-pipework-under-floor-boards

new-bathroom-pipework-under-floor-boards-2

new-bathroom-pipework-under-floor-boards-2

new-bathroom-pipework-under-floor-boards-3

new-bathroom-pipework-under-floor-boards-3

new-bathroom-pipework-for-shower

new-bathroom-pipework-for-shower