Day 141 – Thursday 26th January 2017 – phase 2
A very important day for the build – the huge new steel beams lifted into the correct position, more scaffolding going up, a 2 day job with 4 men to create a canopy right over the house, which will mean that work is not so weather dependent and the house will be more protected when the roof comes off. Also from phase 1, air vents over flat utility room roof going in, to try and allow air to flow and to stop build up of condensation.

High Ab Crane for lifting the Steel Beams

Pre-preparation of crane, house and roof, and the beams

Steels on the grass ready for lift onto roof and final position

Steel beams with slings

Supporting stand for crane

Steel beams showing their full size and length

Beams propped up ready for lift by crane

Builder now cutting into roof, where tiles have been removed previously, for beam to inserted onto a prepared strengthened area on an existing original wall of the house

Crane begins lift via radio control, operator in high viz jacket whilst the other builder controls the direction of the beam using an attached guide rope

Beam is lifted

direction still controlled by rope

beam rising

First beam going up

Beam going up pic 2

beam-going-up-3

Beam going up pic 4

Beam going up pic 5

Beam going up pic 6

Beam going up pic 7

Beam going up pic 8

manoeuvring beam

beam going into position

view of crane

Beam going up pic 9 – wrong angle – beam has to be readjusted

Steel beam has to be repositioned as scaffolding is preventing the beam from locating in its correct position in the roof

Beam being manoeuvred over scaffolding

Beam being manoeuvred

beam now at correct angle to be manoeuvred into position

close up

manoeuvring beam

manoeuvred-into-position-1

manoeuvred-into-position-2

manoeuvred-into-position-3

First beam in place

Pictures from scaffolding of the first beam in place – pic 2

first-beam-in-place-pic-3

first-beam-in-place-pic-4

beam 2 to go here

preparing-roof-for-beam-2

Second beam being craned in

second-beam-being-craned-in-pic-3

second-beam-being-craned-in-pic-4

second-beam-being-craned-in

second-beam-being-craned-in-pic-5

second-beam-going-into-position

second beam in position

different view of beam 2

Two new steel beams in place under new scaffolding

two-new-steel-beams-in-place-pic-3

two-new-steel-beams-in-place-pic-2

steel-beam-number-2-in-position

steel-beam-number-2-in-position-pic-2
More scaffolding going up to create a canopy over house

scaffolding  arrives

scaffolders-move-truck-to-driveway -2-days-construction-ahead

scaffold unloading

unloading scaffolding

scaffolders-and-one-ton-water-containers-to-hold-scaffolding-and-canopy-securely

next-phase-of-scaffolding-with-water-container-1-ton-weights

new-scaffolding-going-up-to-cover-house

new-scaffolding-going-up-to-cover-house-pic-3

new-scaffolding-going-up-to-cover-house-pic-2

water-containers-to-act-as-weights-to-keep-canopy-and-scaffolding-secure

Phase 1 the fibre-glass-roof-and-new-condensation-vents-to try to eliminate damp patches on utility ceiling

fibre-glass-roof-and-new-condensation-vents

Phase 1 pointing-on-roof-tiles-over-new-kitchen

view-of-new-kitchen-roof-in-red-beyond-scaffolding

steel-beam-number-1-from-inside-house-pic-2

steel-beam-number-1-from-inside-house