Tag Archives: tiling

Day 193 – Monday 1st May 2017 – phase 2

Day 193 – Monday 1st May 2017 – phase 2

Upstairs bathroom work continued today.  Marcus Kelly, plumber and Josh his assistant

Upstairs bathroom tiling finished today and grouted

Upstairs bathroom floor tiling finished today and grouted

Showerboards in place - also cut perfectly around the beam

Shower boards in place – also cut perfectly around the beam

shower tray in positio

shower tray in position

Connections visible under the shower tray

Connections visible under the shower tray

bathroom floor tiles

bathroom floor tiles

Day 182 – Wednesday 22nd March 2017 – phase 2

Day 182 – Wednesday 22nd March 2017 – phase 2

New staircase has arrived

New staircase has arrived!

Parts of the staircase

Parts of the staircase – spindles, rail, step

New staircase now fixed in place in our new sun lounge, looks so smart and takes up little room

First view of the new staircase to the upstairs bedroom – New staircase now fixed in place in our new sun lounge, looks so smart and takes up little room! So happy with it! Thanks to our builders Steve and Luke.

Side of staircase - no spindles yet

Side of staircase – no spindles yet

Looking up staircase

Looking up staircase

Front of the house at present, soon to be unwrapped

Front of the house at present, soon to be unwrapped

Roof now finished by Royston, all ridge tiles now on

Roof now finished by Royston, all ridge tiles now on

Ridge tiles

Ridge tiles

Ridge tiles all with clips to hold in place

Ridge tiles all with clips to hold in place

Ridge tile clips

Ridge tile clips

Tiling below dormer now also completed

Tiling below dormer now also completed

View looking down over the sloping roof of the dormer side of the house

View looking down over the sloping roof of the dormer side of the house

View over the back of the house and the new ride tiles that have replaced the old crumbling ones

View over the back of the house and the new ridge tiles that have replaced the old crumbling ones

Fixed ridge tiles

Fixed ridge tiles

Corner joint where 2 ridges join

Corner joint where 2 ridges join

View over the top flat roof with ridge tiles now back on, and new ones over the gables

View over the top flat roof with ridge tiles now back on, and new ones over the gables

11th and 12th March – Weekend Work

11th and 12th March – Weekend Work

Tiles above cooker before being grouted

Tiles above cooker before being grouted

Tiles after the grouting in kitchen

Tiles after the grouting in kitchen

Tiling and grouting all completed, thanks Tony!

Tiling and grouting all completed, thanks Tony!

Preparing to paint new sun lounge

Preparing to paint new sun lounge

Kitchen ready to use

Kitchen ready to use

Kitchen finished! Just need to fill cupboards now!

Kitchen finished! Just need to fill cupboards now!

Island unit for all our baking needs!

Island unit for all our baking needs!

Day 169 – Saturday 4th March 2017 – phase 2

Day 169 – Saturday 4th March 2017 – phase 2

view-of-canopy-from-the-back-garden-showing-tiling-of-roof-so-far-some-will-be-replaced-in-addition-as-an-extra-to-the-new-build-to-ensure-the-roof-is-all-water-tight

view-of-canopy-from-the-back-garden-showing-tiling-of-roof-so-far-some-will-be-replaced-in-addition-as-an-extra-to-the-new-build-to-ensure-the-roof-is-all-water-tight

royston-the-roofer-has-coninued-to-work-on-the-roof-today-completing-a-large-section-of-the-roof-next-to-the-dormer

Royston-the-roofer-has-continued-to-work-on-the-roof-today-completing-a-large-section-of-the-roof-next-to-the-dormer

royston-the-roofer-has-coninued-to-work-on-the-roof-today-completing-a-large-section-of-the-roof-next-to-the-dormer-pic-2

Royston-the-roofer-has-continued-to-work-on-the-roof-today-completing-a-large-section-of-the-roof-next-to-the-dormer-pic-2

progress-on-the-roof-so-far

progress-on-the-roof-so-far

progress-on-the-roof-so-far-pic-2

progress-on-the-roof-so-far-pic-2

view-from-kymin-walk

View from Kymin walk –  House with canopy still just visible

Day 168 – Friday 3rd March 2017 – phase 2

Day 168 – Friday 3rd March 2017 –   phase 2

Extremely wet day today, but due to canopy over the house, the roofer was still able to work.

royston-roofer

Royston Collier has been the roofer for phase 2

royston-roofer-back-of-van

Royston the roofer back-of-van

royston-tiling-the-sloping-sides-of-the-gables

royston-tiling-the-sloping-sides-of-the-gables

ridge-tiling

Tiling of all the ridges around the flat roof

ridge-tiling-2

ridge-tiling-2

ridge-tiling-pic2

ridge-tiling-pic2

ridge-tiles-on-scaffolding

ridge-tiles-on-scaffolding

ensuite-bathroom-plastered

Ensuite bathroom has been plastered

top-of-stair-wall-plastered-wires-are-for-the-top-of-the-stairs-lights

Top of stair wall plastered. Wires are for the top of the stairs light switches (Joe O’Hara – Ballan Electrical)

plastering-in-the-study-so-far-velux-window-visible

Plastering in the study so far. Velux window visible

formation-of-cupboard-over-the-staircase-accessed-from-study

Formation of the over the stairs cupboard, now all boxed in and plaster-boarded, accessed from the study

very-high-ceiling-over-where-the-staircase-will-be-all-plastered

very-high-ceiling-over-where-the-staircase-will-be. Top ceiling is now all plastered. Small hole is for light.

old-porch-roof-has-had-noggins-put-in-for-extra-support

Old Porch Roof has had noggins inserted for extra strength

old-porch-roof-with-noggins-inserted

old-porch-roof-with-noggins-inserted

Day 152 – Thursday 9th February 2017 – phase 2

Day 152 – Thursday 9th February 2017 – phase 2

the-initial-construction-of-the-dormer-in-the-left-side-of-the-new-bedroom-upstairs

the-initial-construction-of-the-dormer-in-the-left-side-of-the-new-bedroom-upstairs

dormer-side-shown-from-the-front-of-the-house

dormer-side-shown-from-the-front-of-the-house

the-sloping-roof-on-left-side-of-the-dormer

the-sloping-roof-on-left-side-of-the-dormer

new-upstairs-area-on-the-left-will-be-the-study-with-velux-window-on-the-right-a-new-ensuite-bathroom

new-upstairs-area-on-the-left-will-be-the-study-with-velux-window-on-the-right-a-new-ensuite-bathroom

new-velux-which-will-be-the-new-window-for-the-study

new-velux-which-will-be-the-new-window-for-the-study

left-gable

left-gable

gable-end-structure-on-the-left-side-of-house-under-construction

gable-end-structure-on-the-left-side-of-house-under-construction

flat-roof-area-between-steelbeams-now-also-under-construction

flat-roof-area-between-steel beams-now-also-under-construction

new-felt-and-batten-adjoining-the-new-roof-to-the-dormer-down-left-side-of-house-over-the-old-kitchen

new-felt-and-batten-adjoining-the-new-roof-to-the-dormer-down-left-side-of-house-over-the-old-kitchen

right-side-of-house-tiling-progress-is-fast

right-side-of-house-tiling-progress-is-fast

right-side-of-house-roof-felted-battened-and-tiles-going-on

right-side-of-house-roof-felted-battened-and-tiles-going-on

new-garage-light-with-sensor

new-garage-light-with-sensor fitted by Ballan Electrical

garage-light-with-sensor

garage-light-with-sensor

Day 121 – Monday 19th December 2016

Day 121 – Monday 19th December 2016

newly-tiled-bathroom

Newly tiled bathroom

progress-in-new-bathroom-shower-bords-up-bath-fitted-shower-fitted

progress-in-new-bathroom-shower-boards-up-bath-fitted-shower-fitted

view-of-bath-shower-shower-board-and-tiles

view-of-bath-shower-shower-board-and-tiles

Bath filled with water whilst it sets in place.  This will prevent movement of bath when using shower and bath.

Day 72 – Tuesday 18th October 2016

Day 72 – Tuesday 18th October 2016

beginning-of-celotex-insulation-between-roof-and-beams-in-utility-room-cut-around-extractor

beginning-of-celotex-insulation-between-roof-and-beams-in-utility-room-cut-around-extractor

plaster-board-for-walls-and-insulation-for-ceiling-has-been-delivered

plaster-board-for-walls-and-insulation-for-ceiling-has-been-delivered

wiring-for-floor-plug-socket-in-new-kitchen

wiring-for-floor-plug-socket-in-new-kitchen

roof-over-back-of-kitchen-nearly-complete-resized

roof-over-back-of-kitchen-nearly-complete

wire-for-outside-light-through-back-wall

wire-for-outside-light-through-back-wall

wire-for-outside-light-through-back-wall-on-other-side-of-patio-window

wire-for-outside-light-through-back-wall-on-other-side-of-patio-window

roof-sloping-down-to-flat-roof-nearly-complete

roof-sloping-down-to-flat-roof-nearly-complete

different-view-of-flat-roof-and-tiling-nearly-complete

different-view-of-flat-roof-and-tiling-nearly-complete

Day 66 – Monday 10th October 2016

Day 66 – Monday 10th October 2016

Progress on roof

the-roof-so-far-at-the-back-of-house-over-new-kitchen

the-roof-so-far-at-the-back-of-house-over-new-kitchen

corner-of-roof-adjacent-to-garage-and-sloping-onto-flat-roof

corner-of-roof-adjacent-to-garage-and-sloping-onto-flat-roof

corner-of-roof-adjacent-to-garage-and-sloping-onto-flat-roof-cemented-in

corner-of-roof-adjacent-to-garage-and-sloping-onto-flat-roof-cemented-in

new-and-old-corner-rosemary-tiles-the-old-ones-are-much-smaller-and-have-a-shallower-curve

new-and-old-corner-rosemary-tiles-the-old-ones-are-much-smaller-and-have-a-shallower-curve

new-kitchen-roof-sloping-to-flat-roof

new-kitchen-roof-sloping-to-flat-roof

 

Day 65 – Friday 7th October 2016

Day 65 – Friday 7th October 2016

Progress of tiling on new roof

roof-tiling-progress-adjacent-to-flat-roof

roof-tiling-progress-adjacent-to-flat-roof

roof-tiling-progress-adjacent-to-flat-roof-picture-2

roof-tiling-progress-adjacent-to-flat-roof-picture-2

roof-tiling-showing-progress-of-tiling-at-back-of-kitchen-roof

roof-tiling-showing-progress-of-tiling-at-back-of-kitchen-roof

roof-tiling-along-side-of-roof-adjacent-to-garage

roof-tiling-along-side-of-roof-adjacent-to-garage

inspection-of-work

inspection-of-work

lead-valley-down-side-of-hip-roof

lead-valley-down-side-of-hip-roof

lead-valley-down-left-side-of-hip-roof

lead-valley-down-left-side-of-hip-roof

progress-on-tiling-7-10-16

progress-on-tiling-7-10-16