Weekend work – Saturday 1st April and Sunday 2nd April 2017

Weekend work – Saturday 1st April and Sunday 2nd April 2017

painting above front patio doors now complete

Painting above front patio doors now complete

doors on cupboard in the study have had another coat, one more coat of the eggshell paint to go

Doors on cupboard in the study have had another coat of paint, one more coat of the eggshell paint to go on the inner panel

door into new family bathroom now varnished on both sides

Door into new family bathroom now varnished on both sides

door into new family bathroom now varnished

Door into new family bathroom now varnished, this is the outside off the Utility Room

old kitchen door now varnished

Old kitchen door now varnished, both sides, this leads into the new Sun Room.

Weekend work – Sunday 5th March 2017 – phase 1 and 2

Weekend work – Sunday 5th March 2017 – phase 1 and 2

Phase 1 work this weekend – Tony (brother-in-law) has fitted handles to bathroom and kitchen door and has begun to tile the kitchen (white tiles!)

Phase 2 work this weekend – Paul has been working on the upstairs, beginning the painting of the ceiling in the new upstairs bedroom in readiness for Joe to return and fit the lights.

Handles to door to utility and new family bathroom fitted by Tony

Handles now in place on door to kitchen from utility and door to new family bathroom. Fitted by Tony

The start of the tiling in the new kitchen - thanks Tony!

The start of the tiling in the kitchen – thanks Tony!

This is what is called 'Buttering of tiles'

This is what is called the ‘back buttering’ of tiles. It ensures a thin even coverage of the cement

New white tiles for a new white kitchen

New white tiles with spacers

Tiling starts from the centre of the cooker and works out the way in both directions

Tiling starts from the centre of the cooker and works out the way in both directions

Spirit levels are essential

Spirit levels are essential

tiling in new kitchen

tiling in new kitchen

tiling in new kitchen pic 2

tiling in new kitchen pic 2

Paul putting on the first coat of emulsion in the new bedroom

Paul applying the first coat of watery emulsion to the newly plastered ceiling in the new bedroom

First coat of emulsion on bedroom ceiling

First coat of emulsion on bedroom ceiling

First coat of emulsion on bedroom ceiling pic 2

First coat of emulsion on bedroom ceiling pic 2

First coat of emulsion on bedroom ceiling pic 3

First coat of emulsion on bedroom ceiling pic 3

Day 103 – Sunday 27th November 2016

Day 103 – Sunday 27th November 2016

new-laminate-floor-sample

Close up of laminate for new kitchen floor

tony-laying-the-laminate-flooring

Tony laying the laminate flooring on a layer of underlay

progress-of-laminate-floor

Progress of laminate floor so far

paul-painting-another-coat-to-utility-ceiling

Paul-painting-another-coat-to-utility-ceiling before electrician on Monday

paul-painting-another-coat-to-utility-ceiling-pic-2

Utility area painting

Day 95 – Thursday 17th November 2016

Day 95 – Thursday 17th November 2016

large-wall-adjacent-to-main-bedroom-now-plastered

large-wall-adjacent-to-main-bedroom-now-plastered

large-wall-adjacent-to-main-bedroom-now-plastered-pic-2

large-wall-adjacent-to-main-bedroom-now-plastered-pic-2

plasterers-van

Plasterer’s van

sloping-ceiling-to-new-kitchen-plastered

sloping-ceiling-to-new-kitchen-plastered

utility-room-ceiling-plastered

utility-room-ceiling-plastered

new-bathroom-ceiling-partly-plastered

new-bathroom-ceiling-partly-plastered

Day 73 – Wednesday 19th October 2016

Day 73 – Wednesday 19th October 2016

Double layers of insulation have been inserted into ceiling area.  This has been a tricky job as all pieces need cutting and shaping.  The main kitchen area should not be so time consuming as larger straight pieces can be cut.

celotex-insulation-in-utility-room

Celotex insulation in Utility Room

celotex-insulation-in-utility-room-view-from-back-door

Celotex insulation in Utility Room View from Back Door

celotex-insulation-in-new-kitchen-entrance

celotex-insulation-in-new-kitchen-entrance

Day 72 – Tuesday 18th October 2016

Day 72 – Tuesday 18th October 2016

beginning-of-celotex-insulation-between-roof-and-beams-in-utility-room-cut-around-extractor

beginning-of-celotex-insulation-between-roof-and-beams-in-utility-room-cut-around-extractor

plaster-board-for-walls-and-insulation-for-ceiling-has-been-delivered

plaster-board-for-walls-and-insulation-for-ceiling-has-been-delivered

wiring-for-floor-plug-socket-in-new-kitchen

wiring-for-floor-plug-socket-in-new-kitchen

roof-over-back-of-kitchen-nearly-complete-resized

roof-over-back-of-kitchen-nearly-complete

wire-for-outside-light-through-back-wall

wire-for-outside-light-through-back-wall

wire-for-outside-light-through-back-wall-on-other-side-of-patio-window

wire-for-outside-light-through-back-wall-on-other-side-of-patio-window

roof-sloping-down-to-flat-roof-nearly-complete

roof-sloping-down-to-flat-roof-nearly-complete

different-view-of-flat-roof-and-tiling-nearly-complete

different-view-of-flat-roof-and-tiling-nearly-complete

Day 57 – Tuesday 27th September 2016

Day 57 – Tuesday 27th September 2016

Fibre glass roofing over flat/sloping roof was completed today.  Fibre glass roofing was chosen as it is strong and durable and can last for 20 years.  It was the ideal solution to cover this kind of roof where all the tiled roofs meet.  An expert came out to do the job and it had to be a dry day.  There are several layers, the first of which is a fibre glass coated board, then a resin goes on, followed by the fibre glass matting, then more resin and finally a top coat. Photos are shown below.

Also today a mistake was noticed by the double glazing man in the hip above the patio doors when he was measuring, so this needs to be corrected.

hip-roof-has-been-constructed-incorrectly-one-angle-is-wrong-3-inches-out

hip-roof-has-been-constructed-incorrectly-one-angle-is-wrong-3-inches-out

hip-roof-has-been-constructed-incorrectly-picture-2

hip-roof-has-been-constructed-incorrectly-picture-2

hip-roof-has-been-constructed-incorrectly-picture-3

hip-roof-has-been-constructed-incorrectly-picture-3

hip-roof-has-been-constructed-incorrectly-picture-4

hip-roof-has-been-constructed-incorrectly-picture-4

hip-roof-being-reconstructed

hip-roof-being-reconstructed

hip-roof-being-reconstructed-2

hip-roof-being-reconstructed-2

fibre-glass-roof-between-sloping-roofs-completed-today-all-sealed-and-watertight-skylight-and-vents-are-also-sealed-in

fibre-glass-roof-between-sloping-roofs-completed-today-all-sealed-and-watertight-skylight-and-vents-are-also-sealed-in

fibre-glass-roof-shows-sloping-sections-and-new-skylight-and-vents-all-put-in-place-today

fibre-glass-roof-shows-sloping-sections-and-new-skylight-and-vents-all-put-in-place-today

fibre-glass-roof-took-a-day-to-do-and-sealed-with-a-special-glue

fibre-glass-roof-took-a-day-to-do-and-sealed-with-a-special resin and top coat

sealed-vent-for-utility-room-in-new-fibre-glass-roof

sealed-vent-for-utility-room-in-new-fibre-glass-roof

vent-put-in-new-bathroom

vent-put-in-new-bathroom

new-vent-can-be-seen-in-utility-room

new-vent-can-be-seen-in-utility-room

skylight-over-new-bathroom-to-be-in-place-natural-light-coming-through-is-considerable

skylight-over-new-bathroom-to-be-in-place natural-light-coming-through-is-considerable

bricks-in-place-over-back-door-outside-doors-and-windows-have-been-measured

bricks-in-place-over-back-door-outside-doors-and-windows-have-been-measured

blocked-up-old-bedroom-window

blocked-up-old-bedroom-window

2-doorways-now-opened-up-left-to-kitchen-right-to-new-bathroom-rubble-all-cleared-away

2-doorways-now-opened-up-left-to-kitchen-right-to-new-bathroom-rubble-all-cleared-away

a-fleet-of-white-vans-today

a-fleet-of-white-vans-today

Day 56 – Monday 26th September 2016

Day 56 – Monday 26th September 2016

Wet day – Work limited to undercover.  Skylight gap previously covered in tarpaulin was recovered with board.  This will be fitted and sealed within the next few days, so should soon be water tight.  Hole was cut for doorway to new bathroom.  Bricks laid to fill gap over new lintel above the new back door.  Old bedroom window now blocked in.  Photos below.

old-bedroom-window-blocked-up

old-bedroom-window-blocked-up

old-little-bedroom-with-window-blocked-up-and-brickwork-cut-to-the-left-to-form-a-new-doorway-into-the-utility-room

old-little-bedroom-with-window-blocked-up-and-brickwork-cut-to-the-left-to-form-a-new-doorway-into-the-utility-room

new-doorway-cut-into-old-bedroom-which-will-be-new-bathroom-picture-taken-from-utility-side

new-doorway-cut-into-old-bedroom-which-will-be-new-bathroom-picture-taken-from-utility-side

 

Day 55 – Friday 23rd September 2016

Day 55 – Friday 23rd September 2016

More roof work – pictures taken Saturday 24th September from scaffolding

view-from-scaffolding-of-tarpaulins-new-bathroom-and-utility-room-sloping-roof-can-be-seen-under-tarpaulin

view-from-scaffolding-of-tarpaulins-new-bathroom-and-utility-room-sloping-roof-can-be-seen-under-tarpaulin

view-from-scaffolding-of-tarpaulins-over-part-of-new-bathroom-and-utility-room-lefthand-side-of-roof

view-from-scaffolding-of-tarpaulins-over-part-of-new-bathroom-and-utility-room-lefthand-side-of-roof

view-from-scaffolding-of-tarpaulins-over-part-of-new-bathroom-and-utility-room

view-from-scaffolding-of-tarpaulins-over-part-of-new-bathroom-and-utility-room

view-of-roof-over-utility-and-entrance-to-new-kitchen-between-the-three-sloping-roofs

view-of-roof-over-utility-and-entrance-to-new-kitchen-between-the-three-sloping-roofs

view-from-scaffolding

view-from-scaffolding

scaffolding-between-new-kitchen-and-garage

scaffolding-between-new-kitchen-and-garage

view-across-scaffolding-along-back-of-house

view-across-scaffolding-along-back-of-house

view-towards-back-garden-from-saffolding-showing-felt-and-battening

view-towards-back-garden-from-scaffolding-showing-felt-and-battening

view-to-back-garden-across-scaffolding

view-to-back-garden-across-scaffolding

view-of-new-steps-from-scaffolding

view-of-new-steps-from-scaffolding

view-into-new-kitchen-through-new-side-window-opening

view-into-new-kitchen-through-new-side-window-opening

rain-leaking-into-utility-roof-is-unfinished-as-yet

rain-leaking-into-utility-roof-is-unfinished-as-yet

heavy-rain-has-totally-filled-tarpaulin-over-new-skylight-rain-is-leaking-in-again

heavy-rain-has-totally-filled-tarpaulin-over-new-skylight-rain-is-leaking-in-again

sunday-another-night-of-heavy-rain-8-buckets-of-water-removed-from-tarpaulin-covering-skylight

sunday-another-night-of-heavy-rain-8-buckets-of-water-removed-from-tarpaulin-covering-skylight

Day 54 – Thursday 22nd September 2016

Day 54 – Thursday 22nd September 2016

Builder is very fortunately ok and back here, although very sore.  A lot of work today on the roof over utility and new entrance to kitchen.

view-into-utility-room-from-new-kitchen-fibre-boards-in-place-on-roof

view-into-utility-room-from-new-kitchen-fibre-boards-in-place-on-roof

utility-roof-showing-slope

utility-roof-showing-slope

fibre-boarding-over-utility-room

fibre-boarding-over-utility-room

skylight-shown-in-blue-tarpaulin-over-top

skylight-shown-in-blue-tarpaulin-over-top

this-will-be-door-out-of-new-bathroom-to-utility-lintels-in-part-cut

this-will-be-door-out-of-new-bathroom-to-utility-lintels-in-part-cut