Tag Archives: old kitchen

Tuesday 16th May 2017 – Preparing for Carpets

Tuesday 16th May 2017 – Preparing for Carpets

Sun lounge ready for carpet laying

Sun lounge ready for carpet laying

Sun lounge ready for carpet laying picture 2

Sun lounge ready for carpet laying picture 2

Sun lounge ready for carpet laying picture 3 showing staircase

Sun lounge ready for carpet laying picture 3 showing staircase, now stained and varnished

Sun lounge ready for carpet laying picture 4 view to old kitchen

Sun lounge ready for carpet laying picture 4 view to old kitchen

New upstairs bedroom ready for carpet laying

New upstairs bedroom ready for carpet laying

Upstairs bedroom ready for carpet - view through to ensuite

Upstairs bedroom ready for carpet – view through to ensuite

Upstairs bedroom ready for carpet

Upstairs bedroom ready for carpet – view through to top of stairs and study

bedroom ready for carpet

Downstairs bedroom ready for carpet

bedroom ready for carpet pic 2

bedroom ready for carpet pic 2

Messy in the other rooms

Downstairs front bedroom emptied for carpet laying

Downstairs front bedroom emptied into here for carpet laying to take place

Sitting room with bedroom stuff for carpet laying

Sitting room with bedroom stuff in here so carpet laying can take place

Weekend work – Saturday 1st April and Sunday 2nd April 2017

Weekend work – Saturday 1st April and Sunday 2nd April 2017

painting above front patio doors now complete

Painting above front patio doors now complete

doors on cupboard in the study have had another coat, one more coat of the eggshell paint to go

Doors on cupboard in the study have had another coat of paint, one more coat of the eggshell paint to go on the inner panel

door into new family bathroom now varnished on both sides

Door into new family bathroom now varnished on both sides

door into new family bathroom now varnished

Door into new family bathroom now varnished, this is the outside off the Utility Room

old kitchen door now varnished

Old kitchen door now varnished, both sides, this leads into the new Sun Room.

Day 177 – Wednesday 15th March 2017 – phase 2

Day 177 – Wednesday 15th March 2017 – phase 2

Newly clad side of dormer

Newly clad side of dormer

Newly clad dormer and vent holes created in soffets

Newly clad dormer and vent holes created in soffits

Left side of the dormer also with new cladding

Left side of the dormer also with new cladding

retiling to be completed here on the corner and the ridge over the new bedroom

retiling to be completed here on the corner and the ridge over the new bedroom

new ridge tiles from new kitchen extension and back bedroom to the very original old part of the house

new ridge tiles stretching over the hall from new kitchen extension and back bedroom to the very original old part of the house

Newly tiled roof sloping down sharply to flat roof over utility, not quite completed

Newly tiled roof sloping down sharply to flat roof over utility, not quite completed

Ridge tiles to be completed here

Ridge tiles to be completed here

roof tiled over old kitchen

roof tiled over old kitchen

The three sloping roofs converging on the flat roof of the utility room

The three sloping roofs converging on the flat roof of the utility room

View of the three sloping roofs and view to garden beyond

View of the three sloping roofs and view to garden beyond

view round to flat roof over utility and newly tiled roof sloping down to utility room

view round to flat roof over utility and newly tiled roof sloping down to utility room

View through to field and the polytunnel from the flat roof over the new bedroom

View through to field and the polytunnel from the flat roof over the new bedroom

Wood for fitted wardrobes prepared

Wood for fitted wardrobes prepared

Day 175 – Monday 13th March 2017 – phase 2

Day 175 – Monday 13th March 2017 – phase 2

New sun lounge which has been painted over the weekend and Monday, scaffolding was left to use for the very high parts

New sun lounge which has been painted over the weekend and Monday, scaffolding was left to use for the very high parts

New sun lounge boarded up at present - front windows awaiting delivery

New sun lounge boarded up at present – front windows awaiting delivery

new sun lounge - view to the back and archway to old kitchen, covered to keep dust out

new sun lounge – view to the back and archway to old kitchen, covered to keep dust out

sun lounge - scaffolding for painting and ladders still the only access to the upstairs

sun lounge – scaffolding for painting and ladders still the only access to the upstairs

levelled area of floor in sun room

levelled area of floor in sun room

dormer view from front scaffolding

dormer view from front scaffolding

Dormer window with soffets all painted black

Dormer window with soffits all painted black

Painted soffet boards

Painted soffit boards

Painted soffet boards 2

Painted soffit boards 2

Painted soffet boards 3

Painted soffit boards 3

Gable end boards painted black

Gable end boards painted black

cladding for side of dormer

cladding for side of dormer

Steve and Luke - the main men who have made our dream come true

Steve and Luke – the builders

Weekend – 25th and 26th February 2017

Weekend – 25th and 26th February 2017

cooker-hood-now-complete-tony-helped-paul-over-the-weekend-just-the-wall-tiles-to-go-on-now-skirting-board-to-paint-and-window-sills-to-fit

Cooker hood now complete. Tony helped Paul over the weekend. Just the tiles to go on now and the skirting board to paint plus window-sills-to-fit

fridge-on-the-move-from-old-kitchen-to-new

fridge-on-the-move-from-old-kitchen-to-new

fridge-on-the-move-from-old-kitchen-to-new-pic-2

fridge-on-the-move-from-old-kitchen-to-new-pic-2

fridge-on-the-move-from-old-kitchen-to-new-pic-3

fridge-on-the-move-from-old-kitchen-to-new-pic-3

fridge-on-the-move-from-old-kitchen-to-new-pic-4

fridge-on-the-move-from-old-kitchen-to-new-pic-4

fridge-freezer-final-place-moved-from-old-kitchen

fridge-freezer-final-place-moved-from-old-kitchen

mini-cooker-now-in-position-also-microwave-positioned-for-now-not-set-in-stone-yet-till-properly-in-use

mini-cooker-now-in-position-also-microwave-positioned-for-now-not-set-in-stone-yet-till-properly-in-use

view-of-cooker-mini-oven-and-microwave

view-of-cooker-mini-oven-and-microwave

planning-bedroom-wardrobe-area-pic-2

planning-bedroom-wardrobe-area-pic-2

planning-bedroom-wardrobe-area

planning-bedroom-wardrobe-area

Day 152 – Thursday 9th February 2017 – phase 2

Day 152 – Thursday 9th February 2017 – phase 2

the-initial-construction-of-the-dormer-in-the-left-side-of-the-new-bedroom-upstairs

the-initial-construction-of-the-dormer-in-the-left-side-of-the-new-bedroom-upstairs

dormer-side-shown-from-the-front-of-the-house

dormer-side-shown-from-the-front-of-the-house

the-sloping-roof-on-left-side-of-the-dormer

the-sloping-roof-on-left-side-of-the-dormer

new-upstairs-area-on-the-left-will-be-the-study-with-velux-window-on-the-right-a-new-ensuite-bathroom

new-upstairs-area-on-the-left-will-be-the-study-with-velux-window-on-the-right-a-new-ensuite-bathroom

new-velux-which-will-be-the-new-window-for-the-study

new-velux-which-will-be-the-new-window-for-the-study

left-gable

left-gable

gable-end-structure-on-the-left-side-of-house-under-construction

gable-end-structure-on-the-left-side-of-house-under-construction

flat-roof-area-between-steelbeams-now-also-under-construction

flat-roof-area-between-steel beams-now-also-under-construction

new-felt-and-batten-adjoining-the-new-roof-to-the-dormer-down-left-side-of-house-over-the-old-kitchen

new-felt-and-batten-adjoining-the-new-roof-to-the-dormer-down-left-side-of-house-over-the-old-kitchen

right-side-of-house-tiling-progress-is-fast

right-side-of-house-tiling-progress-is-fast

right-side-of-house-roof-felted-battened-and-tiles-going-on

right-side-of-house-roof-felted-battened-and-tiles-going-on

new-garage-light-with-sensor

new-garage-light-with-sensor fitted by Ballan Electrical

garage-light-with-sensor

garage-light-with-sensor