Day 187 – Thursday 30th March 2017 – phase 2

Day 187 – Thursday 30th March 2017 – phase 2

No work on Wednesday

Today is the last day of the build.  Lots of finishing off tasks and installing new doors downstairs.  Plumber still to do radiators, and bathroom suite upstairs, but all the external build is now complete.  Here are a few pictures, more to come after the scaffolding is removed.

The outside of the house is all ready for unveiling. The scaffolding should come down next week.

The outside of the house is all ready for unveiling. The scaffolding should come down next week.

guttering finished on the right side of house

guttering finished on the right side of house

guttering all finished

guttering all finished

Bat box on the right side of house by bedroom

Bat box on the right side of house by bedroom

bat box at the top of the house under the gable

bat box at the top of the house under the gable

Bat box on the left side of the house

Bat box on the left side of the house

The curtain is down! We now have the archway back and can see our new sun lounge! Superb!

The curtain is down! We now have the archway back and can see our new sun lounge! Superb!

Another view through the archway

Another view through the archway

New door into downstairs bedroom

New door into downstairs bedroom

New glass panelled door into the hall - this will allow some light through

New glass panelled door into the hall – this will allow some light through

Magnolia tree just ready to flower

Magnolia tree just ready to flower

Day 186 – Tuesday 28th March 2017 – phase 2

Day 186 – Tuesday 28th March 2017 – phase 2

New guttering

Guttering is all being replaced around the house

new guttering and downpipes

new guttering and downpipes

new guttering all along sides of Springdale

new guttering all along sides of Springdale

guttering on the right hand side

guttering on the right hand side

guttering all replaced

guttering all replaced

skirting board all made and fixed into place in new sun room

skirting board all made and fixed into place in new sun room

Day 185 – Monday 27th March 2017 – phase 2

Day 185 – Monday 27th March 2017 – phase 2

Springdale nearly finished still with scaffolding

Springdale nearly finished still with scaffolding. View from the back of the house.

Bedroom door now with architrave

Bedroom door now with architrave, also bathroom door both side complete

Cupboard handles on cupboard in study now finished

Cupboard handles on cupboard in study now finished

 

Looking down the new staircase - new handrail up and fitted on the right pic 2

Looking down the new staircase – new handrail up and fitted on the right – pic 2

Looking down the new staircase - new handrail up and fitted on the right

Looking down the new staircase – new handrail up and fitted on the right

Stair rail now with spindles all stained and treated, the rest to complete after work is complete upstairs

Stair rail now with spindles all stained and treated, the rest to complete after work is complete upstairs

New staircase with the stained and treated spindles now fitted

New staircase with the stained and treated spindles now fitted

left gable and new gutterings and downpipes

left gable and new gutterings and downpipes

Old guttering now removed as an extra to the original work - old guttering was full of holes and broken in places

Old guttering now removed as an extra to the original work – old guttering was full of holes and broken in places

Old guttering removed

Old guttering removed

Vents complete under dormer roof

Vents complete under dormer roof

Dormer with vents below guttering just visible

Dormer with vents below guttering just visible

Fuse boxes now all labelled up by Joe, Ballan Electrical

Fuse boxes now all labelled up by Joe, Ballan Electrical

Old alarm wires removed, fuse switch removed and general tidy up of all wiring in utility room

Old alarm wires removed, fuse switch removed and general tidy up of all wiring in utility room

Sockets relocated in the utility room, fuse switch removed from above by Joe, Ballan Electrical

Sockets relocated in the utility room, fuse switch removed from above by Joe, Ballan Electrical

Smoke alarm changed so will not be set off by cooking, just smoke

Smoke alarm changed so will not be set off by cooking, just smoke

Old light which had been removed on a previous occasion by Joe now replaced with smaller light to match the rest of the sun room, also on the same circuit

Old light which had been removed on a previous occasion by Joe now replaced with smaller light to match the rest of the sun room, also on the same circuit

new smaller light in archway connected to the lights in the sunroom

new smaller light in archway connected to the lights in the sunroom

Skirting boards around bedroom now complete

Skirting boards around bedroom now complete

Skirting boards around bedroom now complete pic 2

Skirting boards around bedroom now complete pic 2

Day 184 – Friday 24th March 2017 – phase 2

Day 184 – Friday 24th March 2017 – phase 2

Into the final stages now as the outside is nearly finished with just vents and guttering to be completed.  Inside the staircase will be finished next week and some new doors, which are extras to the build, will be fitted.  Today 3 bat boxes were fixed into position as required by our bat licence.

Bat box 2

Bat box 2, a small slit at the bottom allows a bat to enter

Bat box 1 - shadowed by scaffolding

Bat box 1 – shadowed by scaffolding

Bat box 3 painted white to blend in with the house

Bat box 3 painted white to blend in with the house

Looking down into sun room from scaffolding

Looking down into sun room from scaffolding

New guttering and down pipes from flat roof

New guttering and down pipes from flat roof

New guttering and down pipes pic 2

New guttering and down pipes pic 2

New guttering up around the dormer window

New guttering up around the dormer window

Bathroom door now with handles fitted

Bathroom door now with handles fitted

Inside the new wardrobes - hanging rails and small shelf - perfect, thanks Steve and Luke

Inside the new wardrobes – hanging rails and small shelf – perfect! thanks Steve and Luke

Wardrobe under the sloping roof adapted to fit

Wardrobe under the sloping roof adapted to fit

Wardrobe with longer hanging space for longer clothes

Wardrobe with longer hanging space for longer clothes

Wardrobe with panelling showing on sides and fronts - looks so smart

Wardrobe with panelling showing on sides and front – looks so smart

Wardrobe, one door open

Wardrobe, one door open

 

Cupboard in the study over the stairs - now with fitted doors

Cupboard in the study over the stairs – now with fitted doors

Day 166 -Wednesday 1st March 2017 – phase 2

Day 166 -Wednesday 1st March 2017 – phase 2

view-of-springdale-progress-so-far-boarded-up-porch-ready-for-demolition-of-the-inside-wall

View of Springdale from the front with boarded up old porch now ready for demolition of wall inside

springdale-on-the-first-of-march-2017

Springdale-on-the-first-of-March-2017

old-porch-wall-inside-ready-for-demolition

old-porch-wall-inside-ready-for-demolition

old-radiators-from-hallway

old-radiators-from-hallway

old-porch-boarded-up

old-porch-boarded-up inside

front-of-house-boarded-up-ready-for-demolition-of-wall-inside

front-of-house-boarded-up-ready-for-demolition-of-wall-inside                              View from the outside

 

looking-down-from-scaffolding-to-boarded-up-front

looking-down-from-scaffolding-to-boarded-up-front

dormer-lead-around-window

dormer-lead-around-window

dormer-sides-lined-with-lead

dormer-sides-lined-with-lead

rendering-applied-today-as-seen-throught-the-scaffolding

rendering-applied-today-as-seen-throught-the-scaffolding

rendering-as-seen-from-second-level-of-the-scaffolding-looks-perfect

rendering-as-seen-from-second-level-of-the-scaffolding-looks-perfect

rendering-as-seen-from-second-level-of-the-scaffolding-pic-3

rendering-as-seen-from-second-level-of-the-scaffolding-pic-3

rendering-pic-4

rendering-pic-4

view-of-bedroom-and-dormer-more-plastering-completed-today

view-of-bedroom-and-dormer-more-plastering-completed-today

view-of-2-bedrrom-windows-and-new-plastering

view-of-2-bedroom-windows-and-new-plastering

wall-channelled-out-for-plug-sockets

wall-channelled-out-for-plug-sockets

entrance-to-study

entrance-to-study

waste-pipe-connected-to-downpipe-which-has-been-connected-to-the-house-drains

new waste-pipe-installed and connected-to-new downpipe-which-has-been-connected-to-the-house-drains

waste-downpipe-connected-to-vent-with-birds-nest-top

waste-downpipe-connected-to-vent-with-birds-nest-top

shower-waste-and-wash-hand-basin-waste-water-pipe-in-white-connected-to-the-waste-pipe-under-the-guttering

shower-waste-and-wash-hand-basin-waste-water-pipe-in-white-connected-to-the-waste-pipe-under-the-guttering

waste-pipe-from-new-upstairs-toilet-not-yet-put-in

waste pipe from new upstairs toilet as yet not installed

white-waste-pipe-coming-from-right-to-left-join-waste-pipe-from-shower-and-then-flows-through-to-main-waste-pipe-outside

white-waste-pipe-coming-from-right-to-left-join-waste-pipe-from-shower-and-then-flows-through-to-main-waste-pipe-outside

plumbing-pipes-under-old-ceiling-in-the-old-porch-middle-pipe-is-cold-water-supply-to-upstairs-toilet-right-beam-hot-and-cold-supply-of-water-to-the-wash-basin-short-pipe-radiator-pipe-to-bedr

Plumbing pipes under old ceiling of the old porch. Middle pipe is the cold water supply to the upstairs toilet. Right of the beam is the hot and cold supply of water to the wash basin. Short pipe is the radiator pipe to the bedroom.