Day 184 – Friday 24th March 2017 – phase 2
Into the final stages now as the outside is nearly finished with just vents and guttering to be completed. Inside the staircase will be finished next week and some new doors, which are extras to the build, will be fitted. Today 3 bat boxes were fixed into position as required by our bat licence.

Bat box 2, a small slit at the bottom allows a bat to enter

Bat box 1 – shadowed by scaffolding

Bat box 3 painted white to blend in with the house

Looking down into sun room from scaffolding

New guttering and down pipes from flat roof

New guttering and down pipes pic 2

New guttering up around the dormer window

Bathroom door now with handles fitted

Inside the new wardrobes – hanging rails and small shelf – perfect! thanks Steve and Luke

Wardrobe under the sloping roof adapted to fit

Wardrobe with longer hanging space for longer clothes

Wardrobe with panelling showing on sides and front – looks so smart

Wardrobe, one door open

Cupboard in the study over the stairs – now with fitted doors