Tag Archives: wardrobe

Day 189 – Friday 7th April 2017 – phase 2

Day 189 – Friday 7th April 2017 – phase 2

Truck to remove skip

Truck to remove skip

Truck to remove skip pic2

Truck to remove skip pic2

Skip removal

Skip removal

Skip removal pic 2

Skip removal pic 2

Skip removal pic 3

Skip removal pic 3

Skip removal pic 4

Skip removal pic 4

Skip removal pic 5

Skip removal pic 5

Skip removal pic 6

Skip removal pic 6

Skip removal pic 7

Skip removal pic 7 This is the third and final skip that has been used whilst work has been done on phase 2

another coat of emulsion on the wardrobe doors

Another coat of emulsion on the wardrobe doors in the new bedroom

another coat of emulsion on the wardrobe doors pic 2

another coat of emulsion on the wardrobe doors pic 2

Day 184 – Friday 24th March 2017 – phase 2

Day 184 – Friday 24th March 2017 – phase 2

Into the final stages now as the outside is nearly finished with just vents and guttering to be completed.  Inside the staircase will be finished next week and some new doors, which are extras to the build, will be fitted.  Today 3 bat boxes were fixed into position as required by our bat licence.

Bat box 2

Bat box 2, a small slit at the bottom allows a bat to enter

Bat box 1 - shadowed by scaffolding

Bat box 1 – shadowed by scaffolding

Bat box 3 painted white to blend in with the house

Bat box 3 painted white to blend in with the house

Looking down into sun room from scaffolding

Looking down into sun room from scaffolding

New guttering and down pipes from flat roof

New guttering and down pipes from flat roof

New guttering and down pipes pic 2

New guttering and down pipes pic 2

New guttering up around the dormer window

New guttering up around the dormer window

Bathroom door now with handles fitted

Bathroom door now with handles fitted

Inside the new wardrobes - hanging rails and small shelf - perfect, thanks Steve and Luke

Inside the new wardrobes – hanging rails and small shelf – perfect! thanks Steve and Luke

Wardrobe under the sloping roof adapted to fit

Wardrobe under the sloping roof adapted to fit

Wardrobe with longer hanging space for longer clothes

Wardrobe with longer hanging space for longer clothes

Wardrobe with panelling showing on sides and fronts - looks so smart

Wardrobe with panelling showing on sides and front – looks so smart

Wardrobe, one door open

Wardrobe, one door open

 

Cupboard in the study over the stairs - now with fitted doors

Cupboard in the study over the stairs – now with fitted doors

Day 181 – Tuesday 21st March 2017 – phase 2

Day 181 – Tuesday 21st March 2017 – phase 2

Wardrobes - progress so far

Wardrobes – progress so far

View of all wardrobes

View of all wardrobes

New cupboards fitted back into the sloping eaves, progress so far - brilliant

New cupboards fitted back into the sloping eaves, progress so far – brilliant

New cupboards fitted pic 2

New cupboards fitted pic 2

Cupboard doors all fitted today

Cupboard doors all fitted today

Cupboard doors all fitted today pic 2

Cupboard doors all fitted today pic 2

Day 179 – Friday 17th March 2017 – phase 2

Day 179 – Friday 17th March 2017 – phase 2

Windows now with seals fitted

Windows now with trims fitted

Window seals all fitted to new French Doors

Window seals and trims all fitted to new French Doors

Trims fitted between beam and new doors

Trims fitted between beam and new doors

Steve and Luke, our builders, constructing our wardrobes - which they have made to fit the sloping roofs eactly

Steve and Luke, our builders, constructing our wardrobes – which they have made to fit the sloping roofs exactly

Double wardrobe under construction

Double wardrobe under construction

Inside double wardrobe - progress so far

Inside double wardrobe – progress so far

Cupboards under construction

Cupboards under construction

Weekend – 25th and 26th February 2017

Weekend – 25th and 26th February 2017

cooker-hood-now-complete-tony-helped-paul-over-the-weekend-just-the-wall-tiles-to-go-on-now-skirting-board-to-paint-and-window-sills-to-fit

Cooker hood now complete. Tony helped Paul over the weekend. Just the tiles to go on now and the skirting board to paint plus window-sills-to-fit

fridge-on-the-move-from-old-kitchen-to-new

fridge-on-the-move-from-old-kitchen-to-new

fridge-on-the-move-from-old-kitchen-to-new-pic-2

fridge-on-the-move-from-old-kitchen-to-new-pic-2

fridge-on-the-move-from-old-kitchen-to-new-pic-3

fridge-on-the-move-from-old-kitchen-to-new-pic-3

fridge-on-the-move-from-old-kitchen-to-new-pic-4

fridge-on-the-move-from-old-kitchen-to-new-pic-4

fridge-freezer-final-place-moved-from-old-kitchen

fridge-freezer-final-place-moved-from-old-kitchen

mini-cooker-now-in-position-also-microwave-positioned-for-now-not-set-in-stone-yet-till-properly-in-use

mini-cooker-now-in-position-also-microwave-positioned-for-now-not-set-in-stone-yet-till-properly-in-use

view-of-cooker-mini-oven-and-microwave

view-of-cooker-mini-oven-and-microwave

planning-bedroom-wardrobe-area-pic-2

planning-bedroom-wardrobe-area-pic-2

planning-bedroom-wardrobe-area

planning-bedroom-wardrobe-area