Tag Archives: builder

Day 178 – Thursday 16th March 2017 – phase 2

Day 178 – Thursday 16th March 2017 – phase 2

Windows and doors have arrived for the front

Windows and doors have arrived for the front

Chris and Clive our window fitters - CWH Windows and Doors, Cardiff - an excellent job done on all our windows and doors!

Chris and Clive our window fitters – CWH Windows and Doors, Cardiff – an excellent job done on all our windows and doors!

Clive - the window expert

Clive – the window expert

Clive Chris and Steve

Clive, Chris and Steve, our builder

Finally the new French Doors for the front of the house have arrived

Finally the new French Doors for the front of the house have arrived. This is a sideways view until the scaffolding is taken away

French door with letterbox to the bottom right

French door with letterbox to the bottom right

New French Window Front Doors

New French Window Front Doors

New front doors from outside

New front doors from outside

New front windows and doors - fabulous

New front windows and doors – fabulous

side view of new window pic 2

side view of new window pic 2

side view of new window

side view of new window

View from the ladder of the new window

View from the ladder of the new window

View of the front from the side

View of the front from the side

Windows and doors have arrived for the front pic 2

Windows and doors have arrived for the front pic 2

Window units put in place today in the dormer, where the boarding up was, supplier sent the wrong size

Window units put in place today in the dormer, where the boarding up was, supplier sent the wrong size

View of the house with new front doors and windows

View of the house with new front doors and windows

View of the house with new front doors and windows from a slightly different angle

View of the house with new front doors and windows from a slightly different angle

New fitted cupboards under construction in the sloping roof area

New fitted cupboards under construction in the sloping roof area. Taking shape!

New large fitted wardrobes also under construction

New large fitted wardrobes also under construction

New large fitted wardrobes under construction on both sides of the doorway

New large fitted wardrobes under construction on both sides of the doorway. Looking brilliant

Day 171 – Tuesday 7th March 2017 – phase 2

Day 171 – Tuesday 7th March 2017 – phase 2

Spring - lovely day

Spring seems to have arrived – a beautiful day at Springdale

Through the Magnolia tree

Through the Magnolia tree

furry bud on the Magnolia tree

Furry buds on the Magnolia Tree

Ballan Electrical

Joe O’Hara from Ballan Electrical and Steve Williams, our builder

Wallpaper stripped off, walls plastered, ready for another coat, old red paint showing from a previous owner of Springdale

Wallpaper stripped off, walls filled with plaster ready for another coat, old red paint showing through from a previous owner of Springdale

Rough plaster to fill in gaps where old wall between poch and hall was taken down, red paint under old wallpaper

Rough plastering to fill the gaps where the old wall was situated between the porch and the hall. Red paint showing through under the old wallpaper

New sun lounge, angled wall has been plastered filling in any uneven divets and holes and missing plaster where picture rail was removed

New sun lounge, angled wall has been plastered filling in any uneven divets and holes and missing plaster where picture rail was removed

New flooring in old porch area, insulated underneath

New flooring in old porch area, insulated underneath

c

View from old porch through new sun lounge areas have been plaster filled in readiness for skim coat. Old wallpaper and picture rail removed

Ladders the only access to upstairs - wall plastered,

Ladders still the only access to upstairs – wall plastered

Ceiling for new sun lounge with plaster board. Joe O'Hara, Ballan Electrical, has cut 8 holes for new lights, wires are in place for lighting

Ceiling for the new sun lounge at plasterboard stage. Joe O’Hara, Ballan Electrical, has cut 8 holes for the new lights which he wired on his last visit.

Newly plasterboarded ceiling and wiring for new lights. There will be 8 in total in this room

The front of the new sun lounge. Newly plasterboarded ceiling and wiring for new lights. There will be 8 in total in this room

Plug socket in new sun lounge

Plug socket in new sun lounge

Access to upstairs

Access to upstairs

First new light upstairs, fitted but not connected. It is one of 9 lights for the new bedroom

First new lights upstairs, fitted but not yet able to switch on. It is one of 9 lights for the bedroom

new socket by small window in bedroom

New socket by small window in bedroom  -Up and running!

light switch for main lights that will be beside bed, also sockets below

light switch for main lights that will be beside bed, also sockets below

light switch being prepared outside new ensuite bathroom

light switch being prepared outside new ensuite bathroom

Lights installed and parts of ceiling painted

Lights installed and parts of ceiling painted

light in study, but no light yet!

light in study, but no light yet!

Another few walls painted with initial coat of emulsion in the upstairs bedroom

Another few walls painted with initial coat of emulsion in the upstairs bedroom

View across the new bedroom to windows, lights and wiring can be seen

View across the new bedroom to windows, lights and wiring can be seen

Plastering over the stairwell and wiring completed for stair lights

Plastering over the stairwell and wiring completed for stair lights

Initial coats of emulsion in new bedroom

Initial coats of emulsion in new bedroom

Day 139 – Tuesday 24th January 2017 – phase 2

Day 139 – Tuesday 24th January 2017 – phase 2

Electrician today alongside the builders preparing wiring that will be under the flooring.

upstairs-area-being-prepared-by-electrician-for-new-wiring-for-the-downstairs-hall-area-also-old-chimney-area-clearly-visible-in-the-sloping-roof-this-will-become-a-dormer-window

upstairs-area-being-prepared-by-electrician-for-new-wiring-for-the-downstairs-hall-area-also-old-chimney-area-clearly-visible-in-the-sloping-roof-this-will-become-a-dormer-window

closer-view-of-holes-in-beams-drilled-for-wiring-also-closer-view-of-the-thick-beams

closer-view-of-holes-in-beams-drilled-for-wiring-also-closer-view-of-the-thick-beams

noggins-of-wood-screwed-in-between-beams-to-strengthen-the-floor-structure

noggins-of-wood-screwed-in-between-beams-to-strengthen-the-floor-structure

view-of-the-opening-for-the-staircase-and-the-other-side-of-the-house-which-will-have-a-small-study

view-of-the-opening-for-the-staircase-and-the-other-side-of-the-house-which-will-have-a-small-study

view-of-the-old-balcony-window-and-new-beams

view-of-the-old-balcony-window-and-new-beams

thick-beams-in-place-over-new-downstairs-hall

thick-beams-in-place-over-new-downstairs-hall

flooring-delivered-and-ready-for-installation-in-the-new-upstairs

flooring-delivered-and-ready-for-installation-in-the-new-upstairs

celotex-insulation-delivered-and-ready-to-install-in-new-upstairs

celotex-insulation-delivered-and-ready-to-install-in-new-upstairs

Day 104 – Monday 28th November 2016

Day 104 – Monday 28th November 2016

Electrician in today wiring up all sockets in the kitchen ready for the power switch on, later this week!  Also builder finishing brick work on steps to main patio.

brickwork-for-steps-up-to-main-patio-now-finished-new-indian-sandstone-slabs-to-be-put-on

brickwork-for-steps-up-to-main-patio-now-finished-new-indian-sandstone-slabs-to-be-put-on

steps-beside-side-kitchen-window-base-prepared-and-protected-from-frost

steps-beside-side-kitchen-window-base-prepared-and-protected-from-frost

new-plug-sockets-in-small-bedroom-prepared-no-electrics-in-here-before-as-this-was-a-bathroom

new-plug-sockets-in-small-bedroom-prepared-no-electrics-in-here-before-as-this-was-a-bathroom

plug-sockets-wired-up-in-small-bedroom-after-plastering

plug-sockets-wired-up-in-small-bedroom-after-plastering

Day 97 – Monday 21st November 2016

Day 97 – Monday 21st November 2016

So wet today – torrential rain all day

Plasterer was off sick and rain stopped play on the wall outside for the builder.

Some architraves around doorways were fixed on and husband started stripping wallpaper in the old bedroom which is now a bathroom.

architraves-around-doorway

architraves-around-doorway

removing-wallpaper

Removing old wallpaper

Day 69 – Thursday 13th October 2016

Day 69 – Thursday 13th October 2016

Electrician and builder today

valley-tiles-all-cut

valley-tiles-all-cut

tiles-down-valley-all-neatly-cut

tiles-down-valley-all-neatly-cut

wiring-now-fed-through-in-readiness-for-kitchen-lights

wiring-now-fed-through-in-readiness-for-kitchen-lights

wiring-now-fed-through-in-readiness-for-kitchen-lights-picture-2

wiring-now-fed-through-in-readiness-for-kitchen-lights-picture-2

wiring-in-new-bathroom-for-ceiling

wiring-in-new-bathroom-for-ceiling

wiring-in-ceiling-between-new-kitchen-and-utility

wiring-in-ceiling-between-new-kitchen-and-utility