Day 183 – Thursday 23rd March 2017 – phase 2

Day 183 – Thursday 23rd March 2017 – phase 2

New outside sensor lights for Springdale, wired and installed by Joe - Ballan Electrical

New outside sensor lights for Springdale, wired and installed by Joe – Ballan Electrical

Outside Light at Springdale

Outside Light at Springdale

Second front outside light at Springdale

Second front outside light at Springdale

New sun lounge - we now have light, thanks to Joe, Ballan Electrical

New sun lounge – we now have light, thanks to Joe, Ballan Electrical

Staircase out of bounds tonight whilst extra supports are setting

Staircase out of bounds tonight whilst extra supports are setting

Staircase - looking down, treads all covered with card to protect them till work is finished pic 2

Staircase – looking down, treads all covered with card to protect them till work is finished pic 2 Supports have now set

Cupboards built into sloping roof

Cupboards built into sloping roof, now with handles

Handles for newly built fitted wardrobes and cupboards

Handles for newly built fitted wardrobes and cupboards Close up picture

View of new wardrobes from dormer side of bedroom, corner not yet complete

View of new wardrobes from dormer side of bedroom, corner not yet complete

Door to new bedroom with handles

Door to new bedroom with handles

Door to new ensuite bathroom, no handles yet

Door to new ensuite bathroom, no handles yet

Door to study with corner piece cut out - this has been from a safety point of view.

Door to study with corner piece cut out – this has been from a safety point of view. The door is safest opening into the room. Opening onto a small landing means stepping backwards which could result in a fall down the stairs

Door to study, corner cut off to fit inside sloping roof

Door to study, corner cut off to fit inside sloping roof

Day 178 – Thursday 16th March 2017 – phase 2

Day 178 – Thursday 16th March 2017 – phase 2

Windows and doors have arrived for the front

Windows and doors have arrived for the front

Chris and Clive our window fitters - CWH Windows and Doors, Cardiff - an excellent job done on all our windows and doors!

Chris and Clive our window fitters – CWH Windows and Doors, Cardiff – an excellent job done on all our windows and doors!

Clive - the window expert

Clive – the window expert

Clive Chris and Steve

Clive, Chris and Steve, our builder

Finally the new French Doors for the front of the house have arrived

Finally the new French Doors for the front of the house have arrived. This is a sideways view until the scaffolding is taken away

French door with letterbox to the bottom right

French door with letterbox to the bottom right

New French Window Front Doors

New French Window Front Doors

New front doors from outside

New front doors from outside

New front windows and doors - fabulous

New front windows and doors – fabulous

side view of new window pic 2

side view of new window pic 2

side view of new window

side view of new window

View from the ladder of the new window

View from the ladder of the new window

View of the front from the side

View of the front from the side

Windows and doors have arrived for the front pic 2

Windows and doors have arrived for the front pic 2

Window units put in place today in the dormer, where the boarding up was, supplier sent the wrong size

Window units put in place today in the dormer, where the boarding up was, supplier sent the wrong size

View of the house with new front doors and windows

View of the house with new front doors and windows

View of the house with new front doors and windows from a slightly different angle

View of the house with new front doors and windows from a slightly different angle

New fitted cupboards under construction in the sloping roof area

New fitted cupboards under construction in the sloping roof area. Taking shape!

New large fitted wardrobes also under construction

New large fitted wardrobes also under construction

New large fitted wardrobes under construction on both sides of the doorway

New large fitted wardrobes under construction on both sides of the doorway. Looking brilliant

Day 177 – Wednesday 15th March 2017 – phase 2

Day 177 – Wednesday 15th March 2017 – phase 2

Newly clad side of dormer

Newly clad side of dormer

Newly clad dormer and vent holes created in soffets

Newly clad dormer and vent holes created in soffits

Left side of the dormer also with new cladding

Left side of the dormer also with new cladding

retiling to be completed here on the corner and the ridge over the new bedroom

retiling to be completed here on the corner and the ridge over the new bedroom

new ridge tiles from new kitchen extension and back bedroom to the very original old part of the house

new ridge tiles stretching over the hall from new kitchen extension and back bedroom to the very original old part of the house

Newly tiled roof sloping down sharply to flat roof over utility, not quite completed

Newly tiled roof sloping down sharply to flat roof over utility, not quite completed

Ridge tiles to be completed here

Ridge tiles to be completed here

roof tiled over old kitchen

roof tiled over old kitchen

The three sloping roofs converging on the flat roof of the utility room

The three sloping roofs converging on the flat roof of the utility room

View of the three sloping roofs and view to garden beyond

View of the three sloping roofs and view to garden beyond

view round to flat roof over utility and newly tiled roof sloping down to utility room

view round to flat roof over utility and newly tiled roof sloping down to utility room

View through to field and the polytunnel from the flat roof over the new bedroom

View through to field and the polytunnel from the flat roof over the new bedroom

Wood for fitted wardrobes prepared