Day 177 – Wednesday 15th March 2017 – phase 2

Day 177 – Wednesday 15th March 2017 – phase 2

Newly clad side of dormer

Newly clad side of dormer

Newly clad dormer and vent holes created in soffets

Newly clad dormer and vent holes created in soffits

Left side of the dormer also with new cladding

Left side of the dormer also with new cladding

retiling to be completed here on the corner and the ridge over the new bedroom

retiling to be completed here on the corner and the ridge over the new bedroom

new ridge tiles from new kitchen extension and back bedroom to the very original old part of the house

new ridge tiles stretching over the hall from new kitchen extension and back bedroom to the very original old part of the house

Newly tiled roof sloping down sharply to flat roof over utility, not quite completed

Newly tiled roof sloping down sharply to flat roof over utility, not quite completed

Ridge tiles to be completed here

Ridge tiles to be completed here

roof tiled over old kitchen

roof tiled over old kitchen

The three sloping roofs converging on the flat roof of the utility room

The three sloping roofs converging on the flat roof of the utility room

View of the three sloping roofs and view to garden beyond

View of the three sloping roofs and view to garden beyond

view round to flat roof over utility and newly tiled roof sloping down to utility room

view round to flat roof over utility and newly tiled roof sloping down to utility room

View through to field and the polytunnel from the flat roof over the new bedroom

View through to field and the polytunnel from the flat roof over the new bedroom

Wood for fitted wardrobes prepared

Wood for fitted wardrobes prepared

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s