Day 168 – Friday 3rd March 2017 – phase 2

Day 168 – Friday 3rd March 2017 –   phase 2

Extremely wet day today, but due to canopy over the house, the roofer was still able to work.

royston-roofer

Royston Collier has been the roofer for phase 2

royston-roofer-back-of-van

Royston the roofer back-of-van

royston-tiling-the-sloping-sides-of-the-gables

royston-tiling-the-sloping-sides-of-the-gables

ridge-tiling

Tiling of all the ridges around the flat roof

ridge-tiling-2

ridge-tiling-2

ridge-tiling-pic2

ridge-tiling-pic2

ridge-tiles-on-scaffolding

ridge-tiles-on-scaffolding

ensuite-bathroom-plastered

Ensuite bathroom has been plastered

top-of-stair-wall-plastered-wires-are-for-the-top-of-the-stairs-lights

Top of stair wall plastered. Wires are for the top of the stairs light switches (Joe O’Hara – Ballan Electrical)

plastering-in-the-study-so-far-velux-window-visible

Plastering in the study so far. Velux window visible

formation-of-cupboard-over-the-staircase-accessed-from-study

Formation of the over the stairs cupboard, now all boxed in and plaster-boarded, accessed from the study

very-high-ceiling-over-where-the-staircase-will-be-all-plastered

very-high-ceiling-over-where-the-staircase-will-be. Top ceiling is now all plastered. Small hole is for light.

old-porch-roof-has-had-noggins-put-in-for-extra-support

Old Porch Roof has had noggins inserted for extra strength

old-porch-roof-with-noggins-inserted

old-porch-roof-with-noggins-inserted

Day 167 – Thursday 2nd March 2017 – phase 2

Day 167 – Thursday 2nd March 2017 – phase 2

old-hallway-wall-now-demolished-boarded-up-at-the-front

Old hallway wall now demolished extending the size of the new sun lounge. Boarded up whilst work continues inside.

old-hallway-wall-now-demolished

Old hallway wall now demolished

view-from-old-porch-to-back-of-old-hallway

View from the old porch inwards. The floor will be built up to match the height of the existing floor.

access-to-upstairs-is-still-via-a-ladder

Access to the new upstairs is still via a ladder.

bedroom-and-the-progress-with-the-plastering

The new bedroom and progress with the plastering. Boarded up dormer on the left.

view-of-plastering-drying-out-at-the-front-of-the-bedroom

View of the plastering drying out at the front of the bedroom

ensuite-bathroom-lastering-so-far-and-toilet-pipe-now-boarded-in-to-create-shelf-area-at-the-back-this-also-has-ensured-that-toilet-is-away-from-the-sloping-roof-overhead

This will be the ensuite bathroom. The toilet waste pipe has now been blocked in to bring the position of the toilet forward away from the sloping roof. A shelf has been created at the back.

creation-of-toilet-area-away-from-the-sloping-roof

Creation of shelf and boxing in of the toilet to bring the position of the toilet further forward and away from the sloping roof.

new-cupboard-over-the-stairs-framework-now-in

New cupboard framework has been built over the stairs. this will be accessed from the study.

Day 165 – Tuesday 28th February 2017 – phase 2

Day 165 – Tuesday 28th February 2017 – phase 2

old-front-and-porch-at-the-beginning-of-tuesday-28th-february-steel-beam-in-place

old-front-and-porch-at-the-beginning-of-tuesday-28th-february-steel-beam-in-place

old-front-and-porch-at-the-end-of-tuesday-28th-february-scratch-coat-applied-over-beam

old-front-and-porch-at-the-end-of-tuesday-28th-february-scratch-coat-applied-over-beam

dormer-from-the-outside-progress-so-far

dormer-from-the-outside-progress-so-far

doorway-with-frame-in-place-skimmed-with-plaster

bedroom doorway-with-frame-in-place-skimmed-with-plaster

plastering-continues-upstairs-in-the-new-bedroom-view-over-to-staircase-through-lefthand-doorway-and-to-ensuite-through-right-hand-doorway

plastering-continues-upstairs-in-the-new-bedroom-view-over-to-staircase-through-left hand-doorway-and-to-ensuite-through-right-hand-doorway

view-across-to-dormer-side-of-bedroom-and-plastering-on-this-side-of-bedroom-and-around-beam

view-across-to-dormer-side-of-bedroom-and-plastering-on-this-side-of-bedroom-and-around-beam

top-and-bottom-of-small-window-upstairs-skimmed-with-plaster

top-and-bottom-of-small-window-upstairs-skimmed-with-plaster

window-sill-and-around-windows-skimmed-with-plaster

window-sill-and-around-windows-skimmed-with-plaster

view-through-to-old-hall-from-new-upstairs-study-this-is-where-a-new-cupboard-will-be-built-over-the-new-staircase

view-through-to-old-hall-from-new-upstairs-study-this-is-where-a-new-cupboard-will-be-built-over-the-new-staircase

view-from-scaffolding-of-windows-which-have-now-been-prepared-for-rendering

view-from-scaffolding-of-windows-which-have-now-been-prepared-for-rendering

upstairs-bedroom-windows-being-prepared-for-rendering-mesh-installed-around-sides

upstairs-bedroom-windows-being-prepared-for-rendering-mesh-installed-around-sides

toilet-waste-pipe-in-place-in-ensuite-with-water-supply-pipe-at-the-side

toilet-waste-pipe-in-place-in-ensuite-with-water-supply-pipe-at-the-side

toilet-waste-pipe-in-place-in-ensuite

toilet-waste-pipe-in-place-in-ensuite

toilet-waste-pipe-now-in-position-through-the-back-of-the-eaves-to-the-outside

toilet-waste-pipe-now-in-position-through-the-back-of-the-eaves-to-the-outside

waste-pipe-from-toilet-just-visible-coming-to-the-outside-of-the-house

waste-pipe-from-toilet-just-visible-coming-to-the-outside-of-the-house

waste-pipe-for-wash-hand-basin-in-ceiling-at-the-edge-of-the-old-hall

waste-pipe-for-wash-hand-basin-in-ceiling-at-the-edge-of-the-old-hall. A white pipe which joins up with the waste water from the shower. This will join the outside waste pipe outside the house on the side

waste-water-pipe-for-shower

waste-water-pipe-for-shower

waste-pipe-for-wash-hand-basin-in-ensuite-with-water-supply-pipe-holes-behind

waste-pipe-for-wash-hand-basin-in-ensuite-with-water-supply-pipe-holes-behind

waste-water-pipe-for-wash-basin

waste-water-pipe-for-wash-basin

waste-water-pipe-to-outside-from-shower-to-be-joined-to-main-waste-pipe

waste-water-pipe-to-outside-from-shower-to-be-joined-to-main-waste-pipe

pipes-for-hot-and-cold-water-going-through-into-old-porch-ceiling-and-up-to-the-new-upstairs

pipes-for-hot-and-cold-water-going-through-into-old-porch-ceiling-and-up-to-the-new-upstairs

hot-and-cold-water-pipes-to-upstairs-in-ceiling-of-old-hall-thinner-pipes-are-radiator-pipes

hot-and-cold-water-pipes-to-upstairs-in-ceiling-of-old-hall-thinner-pipes-are-radiator-pipes

hot-and-cold-water-pipes-and-radiator-pipes-for-upstairs

hot-and-cold-water-pipes-and-radiator-pipes-for-upstairs

plasterboarding-at-the-side-of-the-dormer

plaster boarding-at-the-side-of-the-dormer

Day 162 – Thursday 23rd February 2017 – phase 2

Day 162 – Thursday 23rd February 2017 – phase 2

fibre-glass-flat-roof-coat-number-2

Coat number 2 of fibre glass for flat roof

second-coat-on-flat-roof

second-coat-on-flat-roof

holes-in-newly-installed-ceiling-plasterboard-for-bedroom-lights-electrician-joe-ohara-ballen-electrical

holes-in-newly-installed-ceiling-plasterboard-for-bedroom-lights-electrician-Joe-O’Hara-Ballan-Electrical

pink-plasterboard-and-holes-for-sockets-in-new-ensuite-bathroom

pink-plasterboard-and-holes-for-sockets-in-new-ensuite-bathroom

plasterboarding-in-pink-around-the-steel-beam

plasterboarding-in-pink-around-the-steel-beam This is fire lined plasterboard used around the beams, one of the building regulations

view-across-what-will-be-the-top-of-the-stairs-cupboard-plug-socket-to-go-in-cupboard-partition-wall-will-also-be-installed-here

view-across-what-will-be-the-top-of-the-stairs-cupboard-plug-socket-to-go-in-cupboard-partition-wall-will-also-be-installed-here

wiring-for-a-plug-socket-in-new-cupboard-area-that-will-be-accessed-from-study-but-situated-over-the-open-stairwell-wiring-by-ballen-electrical

wiring-for-a-plug-socket-in-new-cupboard-area-that-will-be-accessed-from-study-but-situated-over-the-open-stairwell-wiring-by-Ballan-Electrical

wiring-for-plug-sockets-at-front-of-new-bedroom-inserted-through-newly-installed-plasterboard

wiring-for-plug-sockets-at-front-of-new-bedroom-inserted-through-newly-installed-plasterboard

wiring-for-plug-socketsin-new-bedroom

wiring-for-plug-sockets in-new-bedroom