Day 167 – Thursday 2nd March 2017 – phase 2

Old hallway wall now demolished extending the size of the new sun lounge. Boarded up whilst work continues inside.

Old hallway wall now demolished

View from the old porch inwards. The floor will be built up to match the height of the existing floor.

Access to the new upstairs is still via a ladder.

The new bedroom and progress with the plastering. Boarded up dormer on the left.

View of the plastering drying out at the front of the bedroom

This will be the ensuite bathroom. The toilet waste pipe has now been blocked in to bring the position of the toilet forward away from the sloping roof. A shelf has been created at the back.

Creation of shelf and boxing in of the toilet to bring the position of the toilet further forward and away from the sloping roof.

New cupboard framework has been built over the stairs. this will be accessed from the study.