Day 71 – Monday 17th October 2016
Builder, Electrician and Plumber today. Heavy showers too, so roof not complete yet.

wall at front where the patio doors are going has been levelled

Looking through to new kitchen – window-from-hall-soon-to-be-removed and replaced with a door

New steps-built-today-from-utility-to-new-kitchen. They are-not-level-at-the-top-as-the-kitchen-floor-has-not-been-built-up-yet

new-pipe-for-radiator-in-kitchen

new-pipe-for-radiator-in-kitchen picture 2

radiator-pipes-going-through-wall-to-new-bathroom

radiator-pipes-running-around-flooring-will-be-below-level-of-floor-when-floor-has-been-put-in

switch-in-kitchen-on-left-at-the-top-of-the-new-steps

new-switch-for-outside-light-just-outside-back-door

old outdoor window sill now chiselled away