Day 109 – Saturday 3rd December 2016

patio-with-slabs-cut-ready-to-be-secured

inside-of-hip-roof-now-painted-twice

bathroom-ceiling-now-painted-for-a-3rd-time
patio-with-slabs-cut-ready-to-be-secured
inside-of-hip-roof-now-painted-twice
bathroom-ceiling-now-painted-for-a-3rd-time
steps-up-to-patio-from-new-patio-area-taking-shape
another-view-of-step-progress-up-to-patio
new-bedroom-plastered-now-drying-out
new-bedroom-plastered-now-drying-out-pic-3
new-bedroom-plastered-now-drying-out-pic-2
wills-helping-out-drying-the-plaster-on-ceiling-ready-for-painting
new-kitchen-with-1st-coat-of-paint-on-ceiling
painted-kitchen-another-coat-to-go
kitchen-with-another-coat-of-paint
hip-roof-plaster-now-drying-out
laminate-flooring-for-kitchen-delivered
Plastering and outside work on new patio
Back of new kitchen and Bedroom – scaling all levelled
walkway-between-garage-and-new-kitchen-stones-laid-to-form-a-ramp
plaster-repaired-around-new-doorway-entrance-to-kitchen-from-corridor
ceiling-in-new-bathroom-now-totally-replastered
new-small-bedroom-converted-from-sauna-last-year-walls-prepared-and-patched-ready-for-skim-coat-of-plaster
new-small-bedroom blurred-picture-no-light-walls-prepared-for-plastering
hip-roof-area-plastered-inside
new-kitchen-ceiling-plaster-starting-to-dry-out-slowly
utility-area-ceiling-painted
utility-area-wall-and-ceiling-painted
New Triangular Shaped glass, made to measure went in today over patio doors. Also plaster boarding above hip roof inside new kitchen now finished.
Plasterboarding over the hip roof around patio doors now complete
plaster-board-complete-in-new-kitchen-over-hip-roof
patio-doors-and-triangular-glass-fitted-above
new-patio-doors-with-triangular-window-fitted-above
new-triangular-window-over-patio-door
Lovely day
completed-corner-all-down-roof-to-over-new-back-door
completed-corner-all-down-roof-to-over-new-back-door-picture-2
new-kitchen-roof-sloping-onto-flat-roof-area
hip-roof-cemented
electrician-at-work-in-kitchen
electricians-work-so-far-installing-electricity-and-plug-sockets-in-new-kitchen
showing-wiring-coming-over-the-top-of-the-wall-into-the-new-kitchen-from-scaffolding-level
new-sockets-in-kitchen
new-box-for-plug-socket
cable-coming-down-for-sky-aerial-and-power-for-tv
wiring-coming-over-wall-in-new-kitchen
wiring-for-plug and switch
wiring-in-kitchen
Electrician today
electrician-came-today-and-started-wiring-kitchen
wiring-for-cooker-and-sockets-above-work-top-eventually in this position
wiring-for-fridge
wiring-in-corner-of-kitchen-new-hall-door-will-be-located-to-the-left-of-this
Outside work continues with the tiling of the new roof
hip-roof-tiled-and-lead-in-valley
Tiles starting to go on roof now
work-today-on-roof-tiles-on-righthand-side-roof-felt-on-peak-over-patio-doors-and-lead-in-valleys
felt-on-new-hip-roof-and-lead-valley-on-right
lead-valley-on-lefthand-side-of-hip-roof
view-along-back-of-house-above-new-kitchen-and-main-bedroom
view-of-newly-tiled-right hand side-of-new-kitchen-roof
view-along-side-of-newly-tiled-kitchen-roof-towards-back-garden
block wall between bedroom and new kitchen window will be removed next week
block wall going up between bedroom and new kitchen from scaffolding window to be filled in next week
block-wall-going-up-between-bedroom-and-new-kitchen
hip-roof-now-corrected-and-finished-now-in-at-correct-angle
hip-roof-now-corrected-picture-2