Day 110 – Sunday 4th December 2016

Day 110 – Sunday 4th December 2016

view-of-flooring-from-window-new-units-in-centre

view-of-flooring-from-window-new-units-in-centre – Flooring now finished

flooring-finished-new-kitchen-units-now-sitting-in-centre-of-kitchen-whilst-floor-is-laid

flooring-finished-new-kitchen-units-now-sitting-in-centre-of-kitchen-whilst-floor-is-laid

hatch-put-in

hatch-put-in Access to roof space

slabs-now-being-cemented-into-place-for-new-patio-at-back-of-new-kitchen

slabs-now-being-cemented-into-place-for-new-patio-at-back-of-new-kitchen

Day 77 – Monday 24th October 2016

Day 77 – Monday 24th October 2016

plaster-board-up-on-new-kitchen-ceiling

Plaster board is now up on the 10 foot high ceiling. A mobile plasterboard hoist was used to lift it into place

plaster-board-up-on-new-kitchen-ceiling-picture-2-taken-from-front-to-back

plaster-board-up-on-new-kitchen-ceiling-picture-2-taken-from-front-to-back

plaster-board-on-right-hand-side-of-kitchen

plaster-board-on-right-hand-side-of-kitchen

left-hand-side-of-kitchen-showing-new-plaster-board-and-hatch

left-hand-side-of-kitchen-showing-new-plaster-board-and-hatch

back-garden-from-kitchen-looking-through-gap-for-patio-doors

A damp day today. The view of part of the back garden through the gap for the patio doors.