Tag Archives: painted

Wednesday 17th May 2017 – Carpets have finally arrived

Wednesday 17th May 2017 – Carpets have finally arrived

Carpet fitters arriving with new carpets

Carpet fitters arriving with new carpets

Carpet fitting under way

Carpet fitting under way

Extremely wet day for carpet fitting

Extremely wet day for carpet fitting

New carpet in the sun lounge

New carpet in the sun lounge

New carpet in the sun lounge 2

New carpet in the sun lounge picture 2

Left over bits of carpet

Left over bits of carpet

Downstairs bedroom carpet, the same as the sun room

Downstairs bedroom carpet, the same as the sun room

Downstairs bedroom carpeted and furniture all back in place

Downstairs bedroom carpeted and furniture all back in place

Downstairs bedroom carpeted and furniture all back in place and view to front

Downstairs bedroom carpeted and furniture all back in place, view through front window

Downstairs bedroom painted, carpeted and furniture back in place

Downstairs bedroom painted, carpeted and furniture back in place

New upstairs master bedroom, with carpet all laid

New upstairs master bedroom, with carpet all laid

New upstairs master bedroom, view to front

New upstairs master bedroom, view to front

New upstairs master bedroom, view to front windows

New upstairs master bedroom, view to front windows

New upstairs master bedroom, view to dormer on the right

New upstairs master bedroom, view to dormer on the right

New upstairs master bedroom, all carpeted, view to door and bathroom

New upstairs master bedroom, all carpeted, view to door and bathroom

Day 195 – Wednesday 3rd May 2017 – phase 2

Day 195 – Wednesday 3rd May 2017 – phase 2

Work on the upstairs bathroom continues.

Wash basin installed

Wash basin installed

Wash basin installed - view towards the window

Wash basin installed – view towards the window

skirting board around shower base painted and glossed

skirting board around shower base painted and glossed

skirting board around shower base painted and glossed pic 2

skirting board around shower base painted and glossed pic 2

radiator in bedroom beneath front window

radiator in upstairs bedroom beneath front window

radiator in bedroom beneath dormer window

radiator in bedroom beneath dormer window

radiator in study beneath the velux window

radiator in study beneath the velux window

 

Day 175 – Monday 13th March 2017 – phase 2

Day 175 – Monday 13th March 2017 – phase 2

New sun lounge which has been painted over the weekend and Monday, scaffolding was left to use for the very high parts

New sun lounge which has been painted over the weekend and Monday, scaffolding was left to use for the very high parts

New sun lounge boarded up at present - front windows awaiting delivery

New sun lounge boarded up at present – front windows awaiting delivery

new sun lounge - view to the back and archway to old kitchen, covered to keep dust out

new sun lounge – view to the back and archway to old kitchen, covered to keep dust out

sun lounge - scaffolding for painting and ladders still the only access to the upstairs

sun lounge – scaffolding for painting and ladders still the only access to the upstairs

levelled area of floor in sun room

levelled area of floor in sun room

dormer view from front scaffolding

dormer view from front scaffolding

Dormer window with soffets all painted black

Dormer window with soffits all painted black

Painted soffet boards

Painted soffit boards

Painted soffet boards 2

Painted soffit boards 2

Painted soffet boards 3

Painted soffit boards 3

Gable end boards painted black

Gable end boards painted black

cladding for side of dormer

cladding for side of dormer

Steve and Luke - the main men who have made our dream come true

Steve and Luke – the builders

Day 101 – Friday 25th November 2016

Day 101 – Friday 25th November 2016

steps-up-to-patio-from-new-patio-area-taking-shape

steps-up-to-patio-from-new-patio-area-taking-shape

another-view-of-step-progress-up-to-patio

another-view-of-step-progress-up-to-patio

new-bedroom-plastered-now-drying-out

new-bedroom-plastered-now-drying-out

new-bedroom-plastered-now-drying-out-pic-3

new-bedroom-plastered-now-drying-out-pic-3

new-bedroom-plastered-now-drying-out-pic-2

new-bedroom-plastered-now-drying-out-pic-2

wills-helping-out-drying-the-plaster-on-ceiling-ready-for-painting

wills-helping-out-drying-the-plaster-on-ceiling-ready-for-painting

new-kitchen-with-1st-coat-of-paint-on-ceiling

new-kitchen-with-1st-coat-of-paint-on-ceiling

painted-kitchen-another-coat-to-go

painted-kitchen-another-coat-to-go

kitchen-with-another-coat-of-paint

kitchen-with-another-coat-of-paint

hip-roof-plaster-now-drying-out

hip-roof-plaster-now-drying-out

laminate-flooring-for-kitchen-delivered

laminate-flooring-for-kitchen-delivered

Day 100 – Thursday 24th November 2016

Day 100 – Thursday 24th November 2016

Plastering and outside work on new patio

 

back-of-ne-kitchen

Back of new kitchen and Bedroom – scaling all levelled

walkway-between-garage-and-new-kitchen-stones-laid-to-form-a-ramp

walkway-between-garage-and-new-kitchen-stones-laid-to-form-a-ramp

plaster-repaired-around-new-doorway-entrance-to-kitchen-from-corridor

plaster-repaired-around-new-doorway-entrance-to-kitchen-from-corridor

ceiling-in-new-bathroom-now-totally-replastered

ceiling-in-new-bathroom-now-totally-replastered

new-small-bedroom-converted-from-sauna-last-year-walls-prepared-and-patched-ready-for-skim-coat-of-plaster

new-small-bedroom-converted-from-sauna-last-year-walls-prepared-and-patched-ready-for-skim-coat-of-plaster

new-small-bedroomblurred-picture-no-light-walls-prepared-for-plastering

new-small-bedroom blurred-picture-no-light-walls-prepared-for-plastering

hip-roof-area-plastered-inside

hip-roof-area-plastered-inside

new-kitchen-ceiling-plaster-starting-to-dry-out-slowly

new-kitchen-ceiling-plaster-starting-to-dry-out-slowly

utility-area-ceiling-painted

utility-area-ceiling-painted

utility-area-wall-and-ceiling-painted

utility-area-wall-and-ceiling-painted