Day 195 – Wednesday 3rd May 2017 – phase 2

Day 195 – Wednesday 3rd May 2017 – phase 2

Work on the upstairs bathroom continues.

Wash basin installed

Wash basin installed

Wash basin installed - view towards the window

Wash basin installed – view towards the window

skirting board around shower base painted and glossed

skirting board around shower base painted and glossed

skirting board around shower base painted and glossed pic 2

skirting board around shower base painted and glossed pic 2

radiator in bedroom beneath front window

radiator in upstairs bedroom beneath front window

radiator in bedroom beneath dormer window

radiator in bedroom beneath dormer window

radiator in study beneath the velux window

radiator in study beneath the velux window

 

Day 180 – Monday 20th March 2017 – phase 2

Day 180 – Monday 20th March 2017 – phase 2

It's sunny in the new sun lounge!

It’s sunny in the new sun lounge!

Royston has been cementing in the gable ends

Royston the roofer has been cementing in the gable ends

Cementing of the roof tiles at the gable end

Cementing of the roof tiles at the gable end

Parts of the roof still to be completed

Parts of the roof still to be completed

View from the top of the house over the back roofs

View from the top of the house over the back roofs

View over the flat roof of the utility and progress of the retiling

View over the flat roof of the utility and progress of the retiling

View over the right side of the roof and velux from the top flat roof

View over the right side of the roof and velux from the top flat roof

Top of the house, over the new bedroom

Top of the house, over the new bedroom

Wills in the new Sun Room

Wills in the new Sun Room

Skirting boards going in, round bedroom and study

Skirting boards going in, round bedroom and study

Skirting boards going in, round bedroom and study pic 2

Skirting boards going in, round bedroom and study pic 2

Weekend – 25th and 26th February 2017

Weekend – 25th and 26th February 2017

cooker-hood-now-complete-tony-helped-paul-over-the-weekend-just-the-wall-tiles-to-go-on-now-skirting-board-to-paint-and-window-sills-to-fit

Cooker hood now complete. Tony helped Paul over the weekend. Just the tiles to go on now and the skirting board to paint plus window-sills-to-fit

fridge-on-the-move-from-old-kitchen-to-new

fridge-on-the-move-from-old-kitchen-to-new

fridge-on-the-move-from-old-kitchen-to-new-pic-2

fridge-on-the-move-from-old-kitchen-to-new-pic-2

fridge-on-the-move-from-old-kitchen-to-new-pic-3

fridge-on-the-move-from-old-kitchen-to-new-pic-3

fridge-on-the-move-from-old-kitchen-to-new-pic-4

fridge-on-the-move-from-old-kitchen-to-new-pic-4

fridge-freezer-final-place-moved-from-old-kitchen

fridge-freezer-final-place-moved-from-old-kitchen

mini-cooker-now-in-position-also-microwave-positioned-for-now-not-set-in-stone-yet-till-properly-in-use

mini-cooker-now-in-position-also-microwave-positioned-for-now-not-set-in-stone-yet-till-properly-in-use

view-of-cooker-mini-oven-and-microwave

view-of-cooker-mini-oven-and-microwave

planning-bedroom-wardrobe-area-pic-2

planning-bedroom-wardrobe-area-pic-2

planning-bedroom-wardrobe-area

planning-bedroom-wardrobe-area