Day 166 -Wednesday 1st March 2017 – phase 2

View of Springdale from the front with boarded up old porch now ready for demolition of wall inside

Springdale-on-the-first-of-March-2017

old-porch-wall-inside-ready-for-demolition

old-radiators-from-hallway

old-porch-boarded-up inside

front-of-house-boarded-up-ready-for-demolition-of-wall-inside View from the outside

looking-down-from-scaffolding-to-boarded-up-front

dormer-lead-around-window

dormer-sides-lined-with-lead

rendering-applied-today-as-seen-throught-the-scaffolding

rendering-as-seen-from-second-level-of-the-scaffolding-looks-perfect

rendering-as-seen-from-second-level-of-the-scaffolding-pic-3

rendering-pic-4

view-of-bedroom-and-dormer-more-plastering-completed-today

view-of-2-bedroom-windows-and-new-plastering

wall-channelled-out-for-plug-sockets

entrance-to-study

new waste-pipe-installed and connected-to-new downpipe-which-has-been-connected-to-the-house-drains

waste-downpipe-connected-to-vent-with-birds-nest-top

shower-waste-and-wash-hand-basin-waste-water-pipe-in-white-connected-to-the-waste-pipe-under-the-guttering

waste pipe from new upstairs toilet as yet not installed

white-waste-pipe-coming-from-right-to-left-join-waste-pipe-from-shower-and-then-flows-through-to-main-waste-pipe-outside

Plumbing pipes under old ceiling of the old porch. Middle pipe is the cold water supply to the upstairs toilet. Right of the beam is the hot and cold supply of water to the wash basin. Short pipe is the radiator pipe to the bedroom.