Category Archives: Building Work

Day 128 also -Wednesday 11th January 2017 – phase 1

Day 128 also -Wednesday 11th January 2017 – phase 1

outside-of-kitchen-has-had-more-layers-of-roughcast-added

outside-of-kitchen-has-had-more-layers-of-roughcast-added

roughcast-on-outside-of-kitchen

roughcast-on-outside-of-kitchen

scratch-coat-on-walls-and-more-freshly-laid-slabs

From the scratch-coat-on-walls-to a smooth coat as below

roughcast-outside-patio-doors-of-kitchen

roughcast-outside-patio-doors-of-kitchen

Day 124 – Tuesday 3rd January 2017

Day 124 – Tuesday 3rd January 2017

Delivery of new dual fuel RangeMaster cooker 1100

rangemaster-cooker-delivery-3-1-17

rangemaster-cooker-delivery-3-1-17

kitchen-3-1-17

kitchen-3-1-17

kitchen-3-1-17-b

kitchen-3-1-17 before delivery of cooker

rangemaster-arrives-3-1-17

rangemaster-arrives-3-1-17

rangemaster-132kg

rangemaster-132kg

Kitchen fitting over Christmas holiday

Kitchen fitting over Christmas holiday

tv-fitting

tv-fitting

tv-fitting-1

Smart TV

paul-and-tony-fitting-kitchen-2

Kitchen unit and island assembly

paul-and-tony-fitting-kitchen

The mobile island!

high-gloss-wall-cabinets

High Gloss Wall Cabinets from Wrens Kitchens

wall-units-and-base-units-now-fitted-measurements-can-now-be-taken-for-worktops

wall-units-and-base-units-now-fitted-measurements-can-now-be-taken-for-worktops

wall-units

Wall and Base units

christmas-lunch-5-resized

Christmas Dinner enjoyed in the new kitchen

christmas-lunch-resized

It’s Christmas!

table-resized

Christmas Table in new unfinished kitchen!

Day 121 – Monday 19th December 2016

Day 121 – Monday 19th December 2016

newly-tiled-bathroom

Newly tiled bathroom

progress-in-new-bathroom-shower-bords-up-bath-fitted-shower-fitted

progress-in-new-bathroom-shower-boards-up-bath-fitted-shower-fitted

view-of-bath-shower-shower-board-and-tiles

view-of-bath-shower-shower-board-and-tiles

Bath filled with water whilst it sets in place.  This will prevent movement of bath when using shower and bath.

Days 118, 119 and 120 – 14th, 15th, 16th December 2016

Days 118, 119 and 120 – 14th, 15th, 16th December 2016

new-bathroom-wood-floor-laid-first

New family bathroom – Old doorway from old bedroom to hall now plaster boarded over. Then new bathroom floor is laid. First a wooden flooring is laid and marked with a grid.

grid-pattern-marked-out-on-wood-flooring

grid-pattern-marked-out-on-wood-flooring

new-bathroom-wood-screwed-down-in-a-grid-pattern-to-ensure-tiles-will-be-laid-on-a-solid-base

new-bathroom-wood-screwed-down-in-a-grid-pattern-to-ensure-tiles-will-be-laid-on-a-solid-base

new-bath-in-place

New bath in place

close-up-of-tiles-in-new-bathroom

close-up-of-tiles-in-new-bathroom

some-floor-tiles-and-wall-tiles-laid-in-new-bathroom

some-floor-tiles-and-wall-tiles-laid-in-new-bathroom

walkway-up-between-garage-and-new-kitchen-slabs-have-been-jointed-filled-between-each-slab

walkway-up-between-garage-and-new-kitchen-slabs-have-been-jointed-filled-between-each-slab

view-from-main-patio-of-new-patio

view-from-main-patio-of-new-patio

slabs-laid-on-steps-not-cemented-between-slabs-yet

slabs-laid-on-steps-not-cemented-between-slabs-yet

patio-behind-house-now-all-finished-cement-between-slabs-jointing

patio-behind-house-now-all-finished-cement-between-slabs-jointing