Tag Archives: back of house

Days 116 and 117 December 12th and 13th 2016

Days 116 and 117 December 12th and 13th 2016

plumber-has-now-installed-2-radiators-in-kitchen-very-warm-now

Plumber has now installed 2 radiators in kitchen very warm now

2nd-radiator-on-back-wall-of-kitchen

2nd-radiator-on-back-wall-of-kitchen

c

Final slabs cut on Monday and cemented in Tuesday, still to be jointed

final-patio-slabs-cut-on-monday-and-cemented-in-tuesdaypic-2

final-patio-slabs-cut-on-Monday-and-cemented-in-Tuesday

Day 98 – Tuesday 22nd November 2016

Day 98 – Tuesday 22nd November 2016

delivery-of-chippings-10-tons-for-bottoming-under-new-patio

delivery-of-chippings-10-tons-for-bottoming-under-new-patio

delivery-of-chippings-10-tons-for-bottoming-under-new-patio-pic-2

delivery-of-chippings-10-tons-for-bottoming-under-new-patio-pic-2

delivery-of-chippings-10-tons-for-bottoming-under-new-patio-pic-3

delivery-of-chippings-10-tons-for-bottoming-under-new-patio-pic-3

delivery-of-chippings-10-tons-for-bottoming-under-new-patio-pic-4

delivery-of-chippings-10-tons-for-bottoming-under-new-patio-pic-4

delivery-of-chippings-10-tons-for-bottoming-under-new-patio-dumped-on-drive

delivery-of-chippings-10-tons-for-bottoming-under-new-patio-dumped-on-drive

chippings-used-right-along-the-back-of-the-house-in-preparation-for-new-slabs-being-laid

chippings-used-right-along-the-back-of-the-house-in-preparation-for-new-slabs-being-laid

chippings-used-at-the-back-of-the-kitchen

chippings-used-at-the-back-of-the-kitchen

first-coat-of-paint-over-plaster-in-kitchen-watered-down-so-it-does-nor-flake-when-second-coat-is-applied

first-coat-of-paint-over-plaster-in-kitchen-watered-down-so-it-does-nor-flake-when-second-coat-is-applied

first-coat-of-watered-down-paint-applied-but-ceiling-not-plastered-yet-so-no-painting-higher-up

first-coat-of-watered-down-paint-applied-but-ceiling-not-plastered-yet-so-no-painting-higher-up

kitchen-painting

kitchen-painting

painting-at-the-back-of-kitchen

painting-at-the-back-of-kitchen

Day 62 – Tuesday 4th October 2016

Day 62 – Tuesday 4th October 2016

Tiling of the new roof continued.  Much progress was made today.

progress-of-tiling-over-kitchen-roof

progress-of-tiling-over-kitchen-roof

progress-of-tiling-over-kitchen-roof-picture-2

progress-of-tiling-over-kitchen-roof-picture-2

close-up-of-tiling-in-progress-through-scaffolding

close-up-of-tiling-in-progress-through-scaffolding

back-of-house-view-2

back of house view

view-of-back-of-house-so-far

view-of-back-of-house-different angle