Day 173 – Thursday 9th March 2017 – phase 2

Downstairs sun lounge back wall plastered

New sun lounge another wall skimmed with plaster

More plastered walls in new sun lounge

Plastering around the top of the staircase position

Plastering now completed around the dormer window

Work on dormer – membrane and batten has been fixed on at the sides

painting of upstairs bedroom continuing

View from back of bedroom to front, not all painted yet, some areas with only first coat

Side of dormer window, membrane and batten on sides