Day 196 – Thursday 4th May 2017 – LAST DAY of work on phase 2

Day 196 – Thursday 4th May 2017  – LAST DAY of work on phase 2

Workmen finished today on Springdale after 196 days of men on site.  Work has been on going since June 26th 2016.  Plumber – Marcus Kelly and his mate Josh completed their work on the upstairs bathroom and radiators in the sunroom, bedroom and study.  Their work looks first class.  Springdale is now a totally different place to the house we bought over 2 years ago.

Internal work is still to be completed, but this will be on going for some time.

Pictures of the upstairs bathroom work can be seen below.

View of shower area and towel radiator

View of shower area and towel radiator

Bathroom all finished

Upstairs Bathroom all finished

view to bathroom window

view to bathroom window

New toilet and wash basin

New toilet and wash basin

View of shower, reflection of window in showerboard

View of shower, reflection of window in showerboard

Radiator towel rail in new upstairs bathroom

Radiator towel rail in new upstairs bathroom

Bathroom all finished - view of new shower, showerboards and screen

Bathroom all finished – view of new shower, showerboards and screen

Day 194 – Tuesday 2nd May 2017 – phase 2

Day 194 – Tuesday 2nd May 2017 – phase 2

Upstairs Bathroom progress - toilet and shower installed and radiator

Upstairs Bathroom Progress – toilet and shower installed and radiator

Bathroom shower shower boards and screen

Bathroom shower, showerboards and screen installed by Marcus Kelly and assistant Josh

Shower installed

Shower installed

Upstairs bathroom - toilet installed and wall tiles grouted

Upstairs bathroom – toilet installed and wall tiles grouted

Day 111 – Monday 5th December 2016

Day 111 – Monday 5th December 2016

Delivery of kitchen unit to replace damaged one. Step at side of kitchen window put in.  Plasterers/roughcast guys returned to put metal and wood edgings on new walls, in preparation for scratch coat

new-bathroom-suite-arrived-today-for-new-downstairs-family-bathroom

new-bathroom-suite-arrived-today-for-new-downstairs-family-bathroom

view-from-bathroom-to-utility-no-door-on-yet

view-from-bathroom-to-utility-no-door-on-yet

3-shower-boards-1-shower-screen-and-heated-towel-rail

3-shower-boards-1-shower-screen-and-heated-towel-rail

ramp-and-walkway-between-garage-and-new-kitchen-now-built-up-wall-completed-to-tie-in-with-existing-wall

ramp-and-walkway-between-garage-and-new-kitchen-now-built-up-wall-completed-to-tie-in-with-existing-wall

battening-and-metal-strips-now-in-place-for-rough-casting-of-bricks-on-new-extension

battening-and-metal-strips-now-in-place-for-rough-casting-of-bricks-on-new-extension

new-side-step-to-back-of-garage

new-side-step-to-back-of-garage