Day 135 and 136 – Friday 20th January and Saturday 21st January 2017 – phase 2

Day 135 and 136 – Friday 20th January and Saturday 21st January 2017 – phase 2

men-at-work-day-135

men-at-work-day-135

centre-window

centre-window

new-concrete-window-sill

new-concrete-window-sill

progress-day-135

progress-day-135

small-beam-over-new-window-opening

small-beam-over-new-window-opening

view-from-left-hand-side

view-from-left-hand-side

view-of-new-window-openings-and-small-steel-support-above-new-window

view-of-new-window-openings-and-small-steel-support-above-new-window

view-of-new-window-openings-from-right-hand-side

view-of-new-window-openings-from-right-hand-side

view-through-to-bedroom-from-scaffolding

view-through-to-bedroom-from-scaffolding

view-of-new-window-openings-from-second-level-of-scaffolding

view-of-new-window-openings-from-second-level-of-scaffolding

view-of-new-window-openings-from-scaffolding

view-of-new-window-openings-from-scaffolding

Part of phase 1 being completed, the outside rendering of the new kitchen, Friday and Saturday

new-tyrolean-render-applied-today

new-tyrolean-render-applied-today

new-tyrolean-render-applied-side-of-new-kitchen

new-tyrolean-render-applied-side-of-new-kitchen

Day 134 – Thursday 19th January 2017 – phase 2

Day 134 – Thursday 19th January 2017 – phase 2

progress-on-day-134-formation-of-upstairs-windows

progress-on-day-134-formation-of-upstairs-windows

progress-on-day-134-formation-of-upstairs-windows-pic-2

progress-on-day-134-formation-of-upstairs-windows-pic-2

side-view-of-new-upstairs

side-view-of-new-upstairs

opening-for-middle-window

opening-for-middle-window

view-looking-down-from-top-scaffolding-onto-old-balcony-window

view-looking-down-from-top-scaffolding-onto-old-balcony-window

view-looking-down-from-top-scaffolding-onto-old-balcony-window-also-showing-areas-of-roof-that-have-been-prepared-for-new-steel-beam

view-looking-down-from-top-scaffolding-onto-old-balcony-window-also-showing-areas-of-roof-that-have-been-prepared-for-new-steel-beam

view-from-the-right-hand-side-of-house-steel-beams-in-brown-now-at-the-bottom-of-the-wall

view-from-the-right-hand-side-of-house-steel-beams-in-brown-now-at-the-bottom-of-the-wall

view-of-the-new-wall-from-the-left-side-of-the-scaffolding

view-of-the-new-wall-from-the-left-side-of-the-scaffolding

view-of-right-hand-side-of-roof

view-of-right-hand-side-of-roof

view-of-double-wall-built-on-top-of-new-steel-beam-at-the-front-of-the-house-and-pitched-roof-covered-to-protect-from-the-weather-roof-felt-is-in-poor-condition-probably-the-original-roofing-felt

view-of-double-wall-built-on-top-of-new-steel-beam-at-the-front-of-the-house-and-pitched-roof-covered-to-protect-from-the-weather-roof-felt-is-in-poor-condition-probably-the-original-roofing-felt

view-from-the-right-hand-side-of-house-showing-double-wall-and-exposed-roof-covered

view-from-the-right-hand-side-of-house-showing-double-wall-and-exposed-roof-covered

left-hand-side-of-roof

left-hand-side-of-roof

Day 133 – Wednesday 18th January 2017 – phase 2

Day 133 – Wednesday 18th January 2017 – phase 2

progress-after-day-133-new-wall-going-up-over-new-supporting-beam-at-front-of-house

progress-after-day-133-new-wall-going-up-over-new-supporting-beam-at-front-of-house

front-of-house-so-far-with-new-wall

front-of-house-so-far-with-new-wall

new-wall-over-new-supporting-beam-over-old-porch-roof

new-wall-over-new-supporting-beam-over-old-porch-roof

another-view-of-new-wall-over-old-porch

another-view-of-new-wall-over-old-porch

new-supporting-beam-as-seen-from-right-side-of-scaffolding

new-supporting-beam-as-seen-from-right-side-of-scaffolding

new-wall-over-right-side-of-house-front

new-wall-over-right-side-of-house-front

left-side-of-house-from-scaffolding-showing-new-wall-going-up-over-the-front-of-the-house-on-the-new-support-beam

left-side-of-house-from-scaffolding-showing-new-wall-going-up-over-the-front-of-the-house-on-the-new-support-beam

left-side-where-tiles-were-removed-yesterday-for-insertion-of-the-large-supporting-steel-next-week

left-side-where-tiles-were-removed-yesterday-for-insertion-of-the-large-supporting-steel-next-week

area-of-roof-where-tiles-were-removed-yesterday-with-bat-ecologists-this-is-where-a-huge-steel-beam-will-be-inserted-into-the-house-for-the-support-of-the-roof-and-the-new-wall-will-be-built-on-top

area-of-roof-where-tiles-were-removed-yesterday-with-bat-ecologists-this-is-where-a-huge-steel-beam-will-be-inserted-into-the-house-for-the-support-of-the-roof-and-the-new-wall-will-be-built-on-top

right-side-of-house-roof

right-side-of-house-roof

top-of-old-balcony-window-just-visible-from-scaffolding

top-of-old-balcony-window-just-visible-from-scaffolding

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area-pic-2

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area-pic-2

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area-pic-3

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area-pic-3

Day 130 – Friday 13th January 2017 – phase 2

Day 130 – Friday 13th January 2017 – phase 2

Warning! A vast amount of scaffolding photos in this post.

scaffolding-delivery

Scaffolding arrived for phase 2

scaffolding-delivery-pic-2

Scaffolding truck

scaffolding-through-the-blinds-in-sitting-room

scaffolding-through-the-blinds-in-sitting-room

the-front-of-springdale-scaffolding-going-up-around-the-front-and-sides

The Front Of Springdale -Scaffolding-going-up-around-the-front-and-sides

c

Scaffolding around house – View from front garden

scaffolding

scaffolding

scaffolding-at-the-side

scaffolding-at-the-side

scaffolding-at-the-right-hand-side

scaffolding-at-the-right-hand-side

side-scaffolding

side-scaffolding

scaffolding-from-outside-along-left-side-of-house

scaffolding-from-outside-along-left-side-of-house

scaffolding-at-right-side-and-satellite-dish

scaffolding-at-right-side-and-satellite-dish

balcony-window-from-outside-not-in-great-condition

balcony-window-from-outside-not-in-great-condition

balcony-window-from-outside-not-in-great-condition-and-tiles-in-poor-state

balcony-window-from-outside-not-in-great-condition-and-tiles-in-poor-state

bottom-scaffolding

bottom-scaffolding

chimney-to-be-removed

chimney-to-be-removed

top-scaffolding-view-towards-fields-over-the-top-of-the-house

top-scaffolding-view-towards-fields-over-the-top-of-the-house

top-scaffolding-view-towards-fields-showing-chimney-that-is-to-be-removed

top-scaffolding-view-towards-fields-showing-chimney-that-is-to-be-removed

view-from-scaffolding-corner-potential-view

view-from-scaffolding-corner-potential-view

view-from-scaffolding

view-from-scaffolding

view-from-top-scaffolding

view-from-top-scaffolding

view-from-top-scaffolding-over-small-garage

view-from-top-scaffolding-over-small-garage

the-beginning-of-the-new-bedroom

the-beginning-of-the-new-bedroom

rock-wool-insulation-in-new-master-bedroom-extension

rockwool-insulation-in-new-master-bedroom-extension

old-chandelier-from-hall-and-old-water-tank-from-attic

old-chandelier-from-hall-and-old-water-tank-from-attic

Day 128 – Wednesday 11th January 2017 – Phase 2

Day 128 – Wednesday 11th January 2017 – Phase 2

before-beam-removal

Picture of before the old beams from the vaulted structure were removed

after-beam-removal

After the beams were removed from old vaulted structure the roof laths can be seen

new-beams-going-in-for-master-bedroom

New beams going in for the master bedroom

beams-removed-pic-2

beams-removed-pic-2

large-hall-and-attic

Large hall and attic space

new-beams-going-into-place-for-bedroom-rectangular-gap-at-middle-back-of-pic-is-where-the-stairs-will-be-located

new-beams-going-into-place-for-bedroom-rectangular-gap-at-middle-back-of-pic-is-where-the-stairs-will-be-located

bedroom-beams-all-going-into-place

bedroom-beams-all-going-into-place

another-view-of-bedroom-beams

another-view-of-bedroom-beams

scaffolding-in-large-hall-and-cutting-equipment-for-new-beams-for-bedroom

scaffolding-in-large-hall-and-cutting-equipment-for-new-beams-for-bedroom

wood-being-stored-inside-bad-weather-forecast-gap-for-staircase-at-top-of-picture

wood-being-stored-inside-bad-weather-forecast-gap-for-staircase-at-top-of-picture

marcus-plumber-going-under-floor-in-hall-re-routing-water-pipes-under-house-pipes-were-in-attic

marcus-plumber-going-under-floor-in-hall-re-routing-water-pipes-under-house-pipes-were-in-attic

marcus-plumber-going-under-floor-in-hall-re-routing-water-pipes-under-house

Marcus-plumber-going-under-floor-in-hall-re-routing-water-pipes-under-house

Day 127 -Tuesday 10th January 2017 – Phase 2

Day 127 -Tuesday 10th January 2017 – Phase 2

view-of-balcony

view-of-balcony

balcony-balustrade-removed

balcony-balustrade-removed

balcony-railings-removed

balcony-railings-removed

balcony-removed-half-a-beam-left

balcony-removed-half-a-beam-left

wood-from-balcony

wood-from-balcony

ceiling-removed-from-old-vaulted-hallway-2

ceiling-removed-from-old-vaulted-hallway-pic 2

ceiling-removed-from-old-vaulted-hallway-3

ceiling-removed-from-old-vaulted-hallway-pic 3

ceiling-removed-from-old-vaulted-hallway

ceiling-removed-from-old-vaulted-hallway

current-front-of-house-day-124

current-front-of-house-day-127

outside-rubble

outside-rubble

phase-2-curtains-up-for-demolition-of-front-hall-and-balcony-to-create-a-master-bedroom-and-ensuite-and-an-upstairs-study

phase-2-curtains-up-for-demolition-of-front-hall-and-balcony-to-create-a-master-bedroom-and-ensuite-and-an-upstairs-study

remaining-beams-from-old-ceiling-in-hallway

remaining-beams-from-old-ceiling-in-hallway

scaffolding-for-beam-removal

scaffolding-for-beam-removal

rubble-from-hall-ceiling

rubble-from-hall-ceiling

Day 70 – Friday 14th October 2016

Day 70 – Friday 14th October 2016

Indoor work today – builder and plumber

bedroom-prepared-for-removal-of-window

bedroom-prepared-for-removal-of-window

window-before-removal-between-kitchen-and-bedroom

window-before-removal-between-kitchen-and-bedroom

blocked-up-window-between-new-kitchen-and-bedroom-from-bedroom-side

After! blocked-up-window-between-new-kitchen-and-bedroom-from-bedroom-side

blocked-up-window-between-new-kitchen-and-bedroom

After blocked-up-window-between-new-kitchen-and-bedroom

wall-partly-cut-in-readiness-for-new-door-to-kitchen-from-hallway

wall-partly-cut-in-readiness-for-new-door-to-kitchen-from-hallway

kitchen-now-cleared-of-scaffolding-and-building-materials

kitchen-now-cleared-of-scaffolding-and-building-materials

new-pipework-for-hot-and-cold-water-to-new-kitchen-and-gas-to-gas-cooker-partly-installed

new-pipework-for-hot-and-cold-water-to-new-kitchen-and-gas pipe -to-gas-cooker-partly-installed

gas-and-water-supply-pipes-partly-installed-for-new-kitchen-through-new-wall

gas-and-water-supply-pipes-partly-installed-for-new-kitchen-through-new-wall

Day 63 -Wednesday 5th October 2016

Day 63 – Wednesday 5th October 2016

Two windows and a door!

first-new-window-for-kitchen-partly-obscured-by-scaffolding

first-new-window-for-kitchen-partly-obscured-by-scaffolding

second-new-window-also-partly-obscured-by-scaffolding

second-new-window-also-partly-obscured-by-scaffolding

new-back-door-into-utility

new-back-door-into-utility

view-through-window-from-main-bedroom-to-new-kitchen

view-through-window-from-main-bedroom-to-new-kitchen

view-through-window-from-main-bedroom-to-new-kitchen-marked-for-sik-dishwasher-cooker

view-through-window-from-main-bedroom-to-new-kitchen-marked-for-sik-dishwasher-cooker

kitchen-planning

kitchen-planning

new-back-door-picture-taken-from-inside

new-back-door-picture-taken-from-inside

Day 60 – Friday 30th September 2016

Day 60 – Friday 30th September 2016

leaking-skylight

Leaking Skylight. Heavy rain overnight and water has been dripping through the skylight in one corner. The bubble has now been fixed on over the top so this should stop the problem

felt-nearly-completed-shown-from-inside-of-new-kitchen

felt-nearly-completed-shown-from-inside-of-new-kitchen

felt-from-inside-of-new-kitchen

felt-from-inside-of-new-kitchen

view-of-main-bedroom-through-window-to-be-blocked-up-scaffolding-still-in-place-inside

view-of-main-bedroom-through-window-to-be-blocked-up-scaffolding-still-in-place-inside

view-of-back-of-house-showing-completed-felt-and-battening

view-of-back-of-house-showing-completed-felt-and-battening

view-of-back-of-house-showing-valley-in-the-middle-between-the-two-roofs

view-of-back-of-house-showing-valley-in-the-middle-between-the-two-roofs

top-of-drive-in-front-of-double-garage-with-materials-and-new-roof-structure-with-felt-and-battening-between-house-and-garage

top-of-drive-in-front-of-double-garage-with-materials-and-new-roof-structure-with-felt-and-battening-between-house-and-garage

materials still to be used at the top of the drive and top of the new kitchen roof can be seen with felt and battening

top-of-drive-in-front-of-double-garage-with-materials

top-of-drive-in-front-of-double-garage-with-materials

Day 58 – Wednesday 28th September 2016

Day 58 Wednesday 28th September 2016

block-wall-between-bedroom-and-new-kitchen-window-will-be-removed-next-week

block wall between bedroom and new kitchen window will be removed next week

block-wall-going-up-between-bedroom-and-new-kitchen-from-scaffolding-window-to-be-filled-in-next-week

block wall going up between bedroom and new kitchen from scaffolding window to be filled in next week

block-wall-going-up-between-bedroom-and-new-kitchen

block-wall-going-up-between-bedroom-and-new-kitchen

hip-roof-now-corrected-and-finished-now-in-at-correct-angle

hip-roof-now-corrected-and-finished-now-in-at-correct-angle

hip-roof-now-corrected-picture-2

hip-roof-now-corrected-picture-2