Day 189 – Friday 7th April 2017 – phase 2

Day 189 – Friday 7th April 2017 – phase 2

Truck to remove skip

Truck to remove skip

Truck to remove skip pic2

Truck to remove skip pic2

Skip removal

Skip removal

Skip removal pic 2

Skip removal pic 2

Skip removal pic 3

Skip removal pic 3

Skip removal pic 4

Skip removal pic 4

Skip removal pic 5

Skip removal pic 5

Skip removal pic 6

Skip removal pic 6

Skip removal pic 7

Skip removal pic 7 This is the third and final skip that has been used whilst work has been done on phase 2

another coat of emulsion on the wardrobe doors

Another coat of emulsion on the wardrobe doors in the new bedroom

another coat of emulsion on the wardrobe doors pic 2

another coat of emulsion on the wardrobe doors pic 2

Day 135 and 136 – Friday 20th January and Saturday 21st January 2017 – phase 2

Day 135 and 136 – Friday 20th January and Saturday 21st January 2017 – phase 2

men-at-work-day-135

men-at-work-day-135

centre-window

centre-window

new-concrete-window-sill

new-concrete-window-sill

progress-day-135

progress-day-135

small-beam-over-new-window-opening

small-beam-over-new-window-opening

view-from-left-hand-side

view-from-left-hand-side

view-of-new-window-openings-and-small-steel-support-above-new-window

view-of-new-window-openings-and-small-steel-support-above-new-window

view-of-new-window-openings-from-right-hand-side

view-of-new-window-openings-from-right-hand-side

view-through-to-bedroom-from-scaffolding

view-through-to-bedroom-from-scaffolding

view-of-new-window-openings-from-second-level-of-scaffolding

view-of-new-window-openings-from-second-level-of-scaffolding

view-of-new-window-openings-from-scaffolding

view-of-new-window-openings-from-scaffolding

Part of phase 1 being completed, the outside rendering of the new kitchen, Friday and Saturday

new-tyrolean-render-applied-today

new-tyrolean-render-applied-today

new-tyrolean-render-applied-side-of-new-kitchen

new-tyrolean-render-applied-side-of-new-kitchen

Day 129 – Thursday 12th January 2017 – Phase 2

Day 129 – Thursday 12th January 2017 – Phase 2

Day 3 only for phase 2, the building of the master bedroom, ensuite and small study.

Progress has been very quick in 3 days.  The balcony and huge vaulted ceiling has been removed, new beams for bedroom floor are in place and gap left for a staircase. Partitioning has started today.

front-of-house-12-1-17

front-of-house-12-1-17 for reference!

c

front-of-house-12-1-17

old-chandelier

old-chandelier

cutting-machinery-for-beams-and-partition-walls

cutting-machinery-for-beams-and-partition-walls

work-above-the-new-beams

work-above-the-new-beams

view-of-new-upstairs

view-of-new-upstairs

view-of-the-work-completed-today-at-new-bedroom-floor-level

view-of-the-work-completed-today-at-new-bedroom-floor-level

partitioning-wall-has-been-partially-completed-on-the-right-this-will-be-the-supporting-beam-for-new-roof

partition-wall-has-been-partially-completed-on-the-right-this-will-be-the-supporting-beam-for-new-roof

view-down-to-the-hall-below

view-down-to-the-hall-below

inspection-going-on

inspection-going-on

walking-the-plank

walking-the-plank

ladders-to-this-level-this-is-where-the-stairs-will-come-up-also-view-of-work-and-new-beams

ladders-to-this-level-this-is-where-the-stairs-will-come-up-also-view-of-work-and-new-beams

Day 126 – Monday 9th January 2017 – phase 2

Day 126 – Monday 9th January 2017 – phase 2

cleared-hallway-and-balcony-ready-for-new-upstairs

Cleared Hallway And Balcony – Ready For A New Upstairs

balcony-ready-for-removal

Balcony – ready for removal

ballustrade-on-balcony

Balustrade on balcony overlooking hall

view-of-hall-from-balcony

view-of-hall-from-balcony

hallway-ready-for-new-upstairs-extension

hallway-ready-for-new-upstairs-extension

Day 125 – Sunday 8th January 2017 – Phase 2

Day 125 – Sunday 8th January 2017 – Phase 2

Lots of preparation for the start of the new extension.  We applied for planning permission and are now creating an upstairs area to the house. This will become a master bedroom and ensuite bathroom and a small study.  Downstairs in the large hallway which we have used as a sitting room, we would like a sun and TV room.

thomas

How it looked over Christmas

thomas-2

Before phase 2

present-opening

present opening mess!

lizzie

Hall as sitting room

 

removing-carpets-in-preparation-for-an-upstairs-master-bedroom

removing-carpets-in-preparation-for-an-upstairs-master-bedroom

removing-carpets-in-preparation-for-an-upstairs-master-bedroom-2

removing-carpets-in-preparation-for-an-upstairs-master-bedroom picture 2

clearing-the-balcony-ready-for-its-removal

clearing-the-balcony-ready-for-its-removal

underlay-removal

underlay-removal