Tag Archives: drive

11th – 15th April 2017 – Phase 2 – Before And After Pictures Of Springdale

11th – 15th April 2017 – Phase 2

Before And After Pictures Of Springdale

front of house and drive 12.1.17

BEFORE – The front of Springdale house and drive 12.1.17

Springdale from the bottom of the drive

AFTER – Springdale from the bottom of the drive – 11th April 2017

Also see side by side photos at the bottom of this post

house and beam delivery

BEFORE – Springdale 12th January 2017

Springdale April 2017

AFTER – Springdale April 2017

front of house 12.1.17

BEFORE – Springdale – front of house 12.1.17

Springdale April 2017 picture 2

AFTER – Springdale April 2017 picture 2

Springdale April 2017 side view

Springdale April 2017 side view

Springdale April 2017 picture 3

Springdale April 2017 picture 3

Springdale April 2017 showing side dormer

Springdale April 2017 showing side dormer

Springdale from the road

Springdale from the road

Springdale from the road picture 2

Springdale from the road picture 2

The transformation is absolutely spectacular – we are so pleased with it.

Day 98 – Tuesday 22nd November 2016

Day 98 – Tuesday 22nd November 2016

delivery-of-chippings-10-tons-for-bottoming-under-new-patio

delivery-of-chippings-10-tons-for-bottoming-under-new-patio

delivery-of-chippings-10-tons-for-bottoming-under-new-patio-pic-2

delivery-of-chippings-10-tons-for-bottoming-under-new-patio-pic-2

delivery-of-chippings-10-tons-for-bottoming-under-new-patio-pic-3

delivery-of-chippings-10-tons-for-bottoming-under-new-patio-pic-3

delivery-of-chippings-10-tons-for-bottoming-under-new-patio-pic-4

delivery-of-chippings-10-tons-for-bottoming-under-new-patio-pic-4

delivery-of-chippings-10-tons-for-bottoming-under-new-patio-dumped-on-drive

delivery-of-chippings-10-tons-for-bottoming-under-new-patio-dumped-on-drive

chippings-used-right-along-the-back-of-the-house-in-preparation-for-new-slabs-being-laid

chippings-used-right-along-the-back-of-the-house-in-preparation-for-new-slabs-being-laid

chippings-used-at-the-back-of-the-kitchen

chippings-used-at-the-back-of-the-kitchen

first-coat-of-paint-over-plaster-in-kitchen-watered-down-so-it-does-nor-flake-when-second-coat-is-applied

first-coat-of-paint-over-plaster-in-kitchen-watered-down-so-it-does-nor-flake-when-second-coat-is-applied

first-coat-of-watered-down-paint-applied-but-ceiling-not-plastered-yet-so-no-painting-higher-up

first-coat-of-watered-down-paint-applied-but-ceiling-not-plastered-yet-so-no-painting-higher-up

kitchen-painting

kitchen-painting

painting-at-the-back-of-kitchen

painting-at-the-back-of-kitchen

Day 60 – Friday 30th September 2016

Day 60 – Friday 30th September 2016

leaking-skylight

Leaking Skylight. Heavy rain overnight and water has been dripping through the skylight in one corner. The bubble has now been fixed on over the top so this should stop the problem

felt-nearly-completed-shown-from-inside-of-new-kitchen

felt-nearly-completed-shown-from-inside-of-new-kitchen

felt-from-inside-of-new-kitchen

felt-from-inside-of-new-kitchen

view-of-main-bedroom-through-window-to-be-blocked-up-scaffolding-still-in-place-inside

view-of-main-bedroom-through-window-to-be-blocked-up-scaffolding-still-in-place-inside

view-of-back-of-house-showing-completed-felt-and-battening

view-of-back-of-house-showing-completed-felt-and-battening

view-of-back-of-house-showing-valley-in-the-middle-between-the-two-roofs

view-of-back-of-house-showing-valley-in-the-middle-between-the-two-roofs

top-of-drive-in-front-of-double-garage-with-materials-and-new-roof-structure-with-felt-and-battening-between-house-and-garage

top-of-drive-in-front-of-double-garage-with-materials-and-new-roof-structure-with-felt-and-battening-between-house-and-garage

materials still to be used at the top of the drive and top of the new kitchen roof can be seen with felt and battening

top-of-drive-in-front-of-double-garage-with-materials

top-of-drive-in-front-of-double-garage-with-materials