Tag Archives: waste pipe

Day 167 – Thursday 2nd March 2017 – phase 2

Day 167 – Thursday 2nd March 2017 – phase 2

old-hallway-wall-now-demolished-boarded-up-at-the-front

Old hallway wall now demolished extending the size of the new sun lounge. Boarded up whilst work continues inside.

old-hallway-wall-now-demolished

Old hallway wall now demolished

view-from-old-porch-to-back-of-old-hallway

View from the old porch inwards. The floor will be built up to match the height of the existing floor.

access-to-upstairs-is-still-via-a-ladder

Access to the new upstairs is still via a ladder.

bedroom-and-the-progress-with-the-plastering

The new bedroom and progress with the plastering. Boarded up dormer on the left.

view-of-plastering-drying-out-at-the-front-of-the-bedroom

View of the plastering drying out at the front of the bedroom

ensuite-bathroom-lastering-so-far-and-toilet-pipe-now-boarded-in-to-create-shelf-area-at-the-back-this-also-has-ensured-that-toilet-is-away-from-the-sloping-roof-overhead

This will be the ensuite bathroom. The toilet waste pipe has now been blocked in to bring the position of the toilet forward away from the sloping roof. A shelf has been created at the back.

creation-of-toilet-area-away-from-the-sloping-roof

Creation of shelf and boxing in of the toilet to bring the position of the toilet further forward and away from the sloping roof.

new-cupboard-over-the-stairs-framework-now-in

New cupboard framework has been built over the stairs. this will be accessed from the study.

Day 166 -Wednesday 1st March 2017 – phase 2

Day 166 -Wednesday 1st March 2017 – phase 2

view-of-springdale-progress-so-far-boarded-up-porch-ready-for-demolition-of-the-inside-wall

View of Springdale from the front with boarded up old porch now ready for demolition of wall inside

springdale-on-the-first-of-march-2017

Springdale-on-the-first-of-March-2017

old-porch-wall-inside-ready-for-demolition

old-porch-wall-inside-ready-for-demolition

old-radiators-from-hallway

old-radiators-from-hallway

old-porch-boarded-up

old-porch-boarded-up inside

front-of-house-boarded-up-ready-for-demolition-of-wall-inside

front-of-house-boarded-up-ready-for-demolition-of-wall-inside                              View from the outside

 

looking-down-from-scaffolding-to-boarded-up-front

looking-down-from-scaffolding-to-boarded-up-front

dormer-lead-around-window

dormer-lead-around-window

dormer-sides-lined-with-lead

dormer-sides-lined-with-lead

rendering-applied-today-as-seen-throught-the-scaffolding

rendering-applied-today-as-seen-throught-the-scaffolding

rendering-as-seen-from-second-level-of-the-scaffolding-looks-perfect

rendering-as-seen-from-second-level-of-the-scaffolding-looks-perfect

rendering-as-seen-from-second-level-of-the-scaffolding-pic-3

rendering-as-seen-from-second-level-of-the-scaffolding-pic-3

rendering-pic-4

rendering-pic-4

view-of-bedroom-and-dormer-more-plastering-completed-today

view-of-bedroom-and-dormer-more-plastering-completed-today

view-of-2-bedrrom-windows-and-new-plastering

view-of-2-bedroom-windows-and-new-plastering

wall-channelled-out-for-plug-sockets

wall-channelled-out-for-plug-sockets

entrance-to-study

entrance-to-study

waste-pipe-connected-to-downpipe-which-has-been-connected-to-the-house-drains

new waste-pipe-installed and connected-to-new downpipe-which-has-been-connected-to-the-house-drains

waste-downpipe-connected-to-vent-with-birds-nest-top

waste-downpipe-connected-to-vent-with-birds-nest-top

shower-waste-and-wash-hand-basin-waste-water-pipe-in-white-connected-to-the-waste-pipe-under-the-guttering

shower-waste-and-wash-hand-basin-waste-water-pipe-in-white-connected-to-the-waste-pipe-under-the-guttering

waste-pipe-from-new-upstairs-toilet-not-yet-put-in

waste pipe from new upstairs toilet as yet not installed

white-waste-pipe-coming-from-right-to-left-join-waste-pipe-from-shower-and-then-flows-through-to-main-waste-pipe-outside

white-waste-pipe-coming-from-right-to-left-join-waste-pipe-from-shower-and-then-flows-through-to-main-waste-pipe-outside

plumbing-pipes-under-old-ceiling-in-the-old-porch-middle-pipe-is-cold-water-supply-to-upstairs-toilet-right-beam-hot-and-cold-supply-of-water-to-the-wash-basin-short-pipe-radiator-pipe-to-bedr

Plumbing pipes under old ceiling of the old porch. Middle pipe is the cold water supply to the upstairs toilet. Right of the beam is the hot and cold supply of water to the wash basin. Short pipe is the radiator pipe to the bedroom.

Day 160 – Tuesday 21st February 2017 – phase 2

Day 160 – Tuesday 21st February 2017 – phase 2

view-of-house-porch-front-removed

View of house from the front – Porch removed

front-porch-door-and-panels-removed

Front porch door and panels removed

front-porch-door-and-panels-removed-pic2

front-porch-door-and-panels-removed-pic2

skip-with-the-contents-of-the-front-of-the-porch

skip-with-the-contents-of-the-front-of-the-porch

new-steel-beam-to-support-new-front-room-installed-over-the-porch-area

New steel beam installed over the front foundation wall to support the new front of house and to ensure there is no sinking

old-porch-new-steel-beam

old-porch with new-steel-beam in place

new-steel-beam-to-support-front-of-the-house-over-foundation-wall

new-steel-beam-to-support-front-of-the-house-over-foundation-wall

porch-from-above

porch-from-above

dormer-progress-so-far

dormer-progress-so-far

side-view-of-dormer-and-insulation

side-view-of-dormer-and-insulation

side-view-of-dormer-and-insulation-pic-2

side-view-of-dormer-and-insulation-pic-2

waste-pipe-from-new-ensuite-bathroom

waste-pipe-from-new-ensuite-bathroom

study-with-plasterboard

study-with-plasterboard

radiator-pipes-for-new-radiator-under-large-window-in-upstairs-bedroom

radiator-pipes-for-new-radiator-under-large-window-in-upstairs-bedroom

plasterboard-delivery-for-new-upstairs

plasterboard-delivery-for-new-upstairs

plasterboard-inside-new-bedroom

plasterboard-inside-new-bedroom