Day 167 – Thursday 2nd March 2017 – phase 2
![old-hallway-wall-now-demolished-boarded-up-at-the-front](https://springdalegarden.com/wp-content/uploads/2017/03/old-hallway-wall-now-demolished-boarded-up-at-the-front.jpg?w=625)
Old hallway wall now demolished extending the size of the new sun lounge. Boarded up whilst work continues inside.
![old-hallway-wall-now-demolished](https://springdalegarden.com/wp-content/uploads/2017/03/old-hallway-wall-now-demolished.jpg?w=625)
Old hallway wall now demolished
![view-from-old-porch-to-back-of-old-hallway](https://springdalegarden.com/wp-content/uploads/2017/03/view-from-old-porch-to-back-of-old-hallway.jpg?w=625)
View from the old porch inwards. The floor will be built up to match the height of the existing floor.
![access-to-upstairs-is-still-via-a-ladder](https://springdalegarden.com/wp-content/uploads/2017/03/access-to-upstairs-is-still-via-a-ladder.jpg?w=625)
Access to the new upstairs is still via a ladder.
![bedroom-and-the-progress-with-the-plastering](https://springdalegarden.com/wp-content/uploads/2017/03/bedroom-and-the-progress-with-the-plastering.jpg?w=625)
The new bedroom and progress with the plastering. Boarded up dormer on the left.
![view-of-plastering-drying-out-at-the-front-of-the-bedroom](https://springdalegarden.com/wp-content/uploads/2017/03/view-of-plastering-drying-out-at-the-front-of-the-bedroom.jpg?w=625)
View of the plastering drying out at the front of the bedroom
![ensuite-bathroom-lastering-so-far-and-toilet-pipe-now-boarded-in-to-create-shelf-area-at-the-back-this-also-has-ensured-that-toilet-is-away-from-the-sloping-roof-overhead](https://springdalegarden.com/wp-content/uploads/2017/03/ensuite-bathroom-lastering-so-far-and-toilet-pipe-now-boarded-in-to-create-shelf-area-at-the-back-this-also-has-ensured-that-toilet-is-away-from-the-sloping-roof-overhead.jpg?w=625)
This will be the ensuite bathroom. The toilet waste pipe has now been blocked in to bring the position of the toilet forward away from the sloping roof. A shelf has been created at the back.
![creation-of-toilet-area-away-from-the-sloping-roof](https://springdalegarden.com/wp-content/uploads/2017/03/creation-of-toilet-area-away-from-the-sloping-roof.jpg?w=625)
Creation of shelf and boxing in of the toilet to bring the position of the toilet further forward and away from the sloping roof.
![new-cupboard-over-the-stairs-framework-now-in](https://springdalegarden.com/wp-content/uploads/2017/03/new-cupboard-over-the-stairs-framework-now-in.jpg?w=625)
New cupboard framework has been built over the stairs. this will be accessed from the study.