Day 100 – Thursday 24th November 2016
Plastering and outside work on new patio

Back of new kitchen and Bedroom – scaling all levelled

walkway-between-garage-and-new-kitchen-stones-laid-to-form-a-ramp

plaster-repaired-around-new-doorway-entrance-to-kitchen-from-corridor

ceiling-in-new-bathroom-now-totally-replastered

new-small-bedroom-converted-from-sauna-last-year-walls-prepared-and-patched-ready-for-skim-coat-of-plaster

new-small-bedroom blurred-picture-no-light-walls-prepared-for-plastering

hip-roof-area-plastered-inside

new-kitchen-ceiling-plaster-starting-to-dry-out-slowly

utility-area-ceiling-painted

utility-area-wall-and-ceiling-painted