Day 122 – Tuesday 20th December 2016

New Bath and Shower

New family bathroom with towel radiator toilet and sink

toilet-and-wash-hand-basin

New Bath and Shower

New family bathroom with towel radiator toilet and sink

toilet-and-wash-hand-basin
Wall beside patio – preparation and rebuild of existing wall. Also plastering progress in new bathroom and kitchen.

bathroom-plastering

bathroom-plastering-2

sloping-ceiling-to-new-kitchen

plaster-around-ceiling-in-new-kitchen

Rebuild of old wall in front of patio

Old wall merges into new

Five steps are to be constructed here up to patio
New Triangular Shaped glass, made to measure went in today over patio doors. Also plaster boarding above hip roof inside new kitchen now finished.

Plasterboarding over the hip roof around patio doors now complete

plaster-board-complete-in-new-kitchen-over-hip-roof

patio-doors-and-triangular-glass-fitted-above

new-patio-doors-with-triangular-window-fitted-above

new-triangular-window-over-patio-door

New step built into new bathroom

plasterboard-and-plastering-around-new-doorway-into-new-bathroom

kitchen-at-present

Made Cotswold Crunch bread whilst waiting for the plumber!

new-bathroom-plasterboarding-double-in-places-to-fill-gaps

new-bathroom-plasterboarding

new-door-frame-around-new-bathroom-door-picture-2

new-door-frame-around-new-bathroom-door

new-door-frame-around-new-kitchen-door-top-of-steps
Patio doors for kitchen arrived today

new-patio-doors-in-new-kitchen-from-inside

New patio doors minus the apex window on order fitted by Clive and Chris

new-patio-doors-to-new-kitchen-from-outside

new-patio-doors-to-new-kitchen-from-outside-2

Spot Marcus, our plumber, in a very tight spot, under the floor in the new bathroom

under-the-new-bathroom-floor-where-toilet-and-sink-will-go

drain-and-pipework-under-floor

under-the-new-bathroom-floor-where-bath-will-be-positioned

new-plasterboard-ceiling-in-utility-room

new-plasterboard-ceiling-in-new-bathroom

new-plasterboard-ceiling-in-entrance-to-kitchen-beneath-flat-roof

Progress on the roof – Day 79

close-up-of-roof-progress

Ridge tiles not yet in final position

roof-between-old-and-new-building

roof-between-old-and-new-building-from-step-ladder

roof-between-old-and-new-building-from-step-ladder-2

new-bathroom-pipework-under-floor-boards

new-bathroom-pipework-under-floor-boards-2

new-bathroom-pipework-under-floor-boards-3

new-bathroom-pipework-for-shower
More insulation and roof nearly completed

kitchen partly floored and partly insulated

New Kitchen partly floored and partly insulated

kitchen-with-insulation-partly-complete-and-flooring-also-shows-electrical-plug-socket-in-floor-for-island-unit

electrical-socket-in-flooring-not-yet-connected-in-kitchen-floor-for-island-unit

Roof nearly completed

roof-between-old-kitchen-and-new-kitchen
Builder, Electrician and Plumber today. Heavy showers too, so roof not complete yet.

wall at front where the patio doors are going has been levelled

Looking through to new kitchen – window-from-hall-soon-to-be-removed and replaced with a door

New steps-built-today-from-utility-to-new-kitchen. They are-not-level-at-the-top-as-the-kitchen-floor-has-not-been-built-up-yet

new-pipe-for-radiator-in-kitchen

new-pipe-for-radiator-in-kitchen picture 2

radiator-pipes-going-through-wall-to-new-bathroom

radiator-pipes-running-around-flooring-will-be-below-level-of-floor-when-floor-has-been-put-in

switch-in-kitchen-on-left-at-the-top-of-the-new-steps

new-switch-for-outside-light-just-outside-back-door

old outdoor window sill now chiselled away