Tag Archives: flat roof

Day 148 -Friday 3rd February 2017 – phase 2

Day 148 -Friday 3rd February 2017 – phase 2

bathroom-window-gap-has-been-readjusted-in-size-as-rafters-were-going-to-clip-edge-of-window

Bathroom window gap has been decreased in size as rafters were going to clip edge of window

more-rafters-inserted-on-right-and-front-of-gable-built-today

more-rafters-inserted-on-right-and-front-of-gable-built-today

gable-end-on-right-hand-side-now-being-created-over-bathroom-window-gap

gable-end-on-right-hand-side-now-being-created-over-bathroom-window-gap

gable-end-on-right-over-bathroom-window

gable-end-on-right-over-bathroom-window

blocking-up-side-of-gable-between-rafters

new rafters in place on right side

view-of-underside-of-rafters-over-what-will-be-the-side-of-the-bathroom

view-of-underside-of-rafters-over-what-will-be-the-side-of-the-bathroom

middle-window-insulated-below

middle-window-insulated-below

view-to-the-right-showing-beams-for-flat-roof-and-rafters-to-flat-roof

view-to-the-right-showing-beams-for-flat-roof-and-rafters-to-flat-roof

view-into-master-bedroom-area-being-used-for-construction-of-roof

view-into-master-bedroom-area-being-used-for-construction-of-roof

upstairs-left-hand-window-gap-insulation-in

upstairs-left-hand-window-gap

Day 147 – Thursday 2nd February 2017 – phase 2

Day 147 – Thursday 2nd February 2017 – phase 2

new-flat-roof-under-construction-and-view-into-what-will-be-master-bedroom

New flat roof under construction and view into what will be the master bedroom. This is tied into the top of the existing roof.

view-over-newly-created-flat-roof

view-over-newly-created-flat-roof

view-over-newly-created-flat-roof-another-angle

view-over-newly-created-flat-roof-another-angle

beams-now-inserted-between-steels

Beams now inserted in between steel beams to form the structure of the flat roof

new-roof-beams-on-left-side-of-house-going-into-position

New roof rafters on the left side of the house. These have been attached to the newly inserted ridge board that will come out to the front of the house and form the top of the pitched roof and gable end on the right hand side

new-roof-beams-on-left-side-of-house-going-into-position-pic-2

rafters on the right hand side of the house attached to the ridge board, pic 2

bathroom-window-to-be-slightly-altered-as-roof-beams-clip-edge-of-window

bathroom-window opening -to-be-slightly-altered-as-roof-rafters clip- the edge-of- the window

bathroom-window-to-be-slightly-altered-as-roof-beams-clip-edge-of-window-pic-2

Bathroom window pic 2

right-side-of-house

rafters to ridge board viewed form left side. Cross beams notched into steel

view-through-new-bathroom-window

view of rafters through bathroom window opening. Edge of bathroom can be seen marked out with wood in flooring

view-into-bedroom-area-from-right

View into bedroom from the right

view-through-left-window-int-the-newly-created-bedroom-space

View through left window to newly created bedroom floor space

new-drawer-unit-in-kitchen-island-fitted-out-with-worktop-for-scone-and-pastry-making-at-a-good-working-height

new-drawer-unit-in-kitchen-island-fitted-out-with-worktop-for-scone-and-pastry-making-at-a-good-working-height

new-drawer-unit-in-kitchen-island-fitted-out-with-worktop

new-drawer-unit-in-kitchen-island-fitted-out-with-worktop

Day 145 – Tuesday 31st January 2017 – phase 2

Day 145 – Tuesday 31st January 2017 – phase 2

Roof tiles all stripped off today under supervision from bat licensed ecologist. Balcony window taken out and flat roof taken off.  From phase 1, worktop for new kitchen which had been measured and cut to size has now been fitted.

newly-fitted-worktop-for-kitchen-and-island-unit

newly-fitted-worktop-for-kitchen-and-island-unit

new-worktop-fitted

New worktop fitted – a transformation

balcony-window-now-removed-view-through-to-new-bedroom-floor

balcony-window-now-removed-view-through-to-new-bedroom-floor and through to hall below

left-side-of-house-tiles-stripped-under-supervision-of-a-bat-licensed-ecologist

left-side-of-house-tiles-stripped-under-supervision-of-a-bat-licensed-ecologist

left-and-front-stripped-of-tiles

left-and-front-stripped-of-tiles

right-side-of-house-tiles-all-stripped-off

right-side-of-house-tiles-all-stripped-off

view-of-stripped-roof-from-left

view-of-stripped-roof-from-left

view-into-house-over-old-porch

view-into-house-over-old-porch

view-of-what-will-be-new-bedroom-floor

view-of-what-will-be-new-bedroom-floor

view-through-gap-that-will-be-middle-window-in-the-bedroom

view-through-gap-that-will-be-middle-window-in-the-bedroom

view-through-gap-which-will-be-new-ensuite-bathroom-window

view-through-gap-which-will-be-new-ensuite-bathroom-window

top-of-roof-now-to-compare-later-when-new-roof-is-on

top-of-roof-now-to-compare-later-when-new-roof-is-on

view-from-front-through-to-house-from-scaffolding-of-the-inside-where-the-old-balcony-has-been-removed

view-from-front-through-to-house-from-scaffolding-of-the-inside-where-the-old-balcony-has-been-removed

gap-from-below-seen-in-previous-pictures-as-light-shining-through-from-house

gap-from-below-seen-in-previous-pictures-as-light-shining-through-from-house

tiles-all-stacked-to-be-reused-for-new-roof

tiles-all-stacked-to-be-reused-for-new-roof

tiles-all-stacked-to-be-reused-for-new-roof-down-side-of-scaffolding

tiles-all-stacked-to-be-reused-for-new-roof-down-side-of-scaffolding

Day 75 – Friday 21st October 2016

Day 75 – Friday 21st October 2016

More insulation and roof nearly completed

kitchen-partly-floored-and-partly-insulated

kitchen partly floored and partly insulated

new-kitchen-partly-insulated-and-floored

New Kitchen partly floored and partly insulated

kitchen-with-insulation-partly-complete-and-flooring-also-shows-electrical-plug-socket-in-floor-for-island-unit

kitchen-with-insulation-partly-complete-and-flooring-also-shows-electrical-plug-socket-in-floor-for-island-unit

electrical-socket-in-flooring-not-yet-connected-in-kitchen-floor-for-island-unit

electrical-socket-in-flooring-not-yet-connected-in-kitchen-floor-for-island-unit

roof-nearly-complete

Roof nearly completed

roof-between-old-kitchen-and-new-kitchen

roof-between-old-kitchen-and-new-kitchen

Day 74 – Thursday 20th October 2016

Day 74 – Thursday 20th October 2016

Insulation, insulation, insulation

insulation-in-new-kitchen-roof-going-in

insulation-in-new-kitchen-roof-going-in

insulation-in-new-kitchen-roof-at-back-of-kitchen-sloping-roof

insulation-in-new-kitchen-roof-at-back-of-kitchen-sloping-roof

insulation-in-new-kitchen-roof-on-slopng-roof-over-left-hand-window

insulation-in-new-kitchen-roof-on-sloping-roof-over-left-hand-window

insulation-in-new-kitchen-roof-on-slopng-roof-over-right-hand-window

insulation-in-new-kitchen-roof-on-sloping-roof-over-right-hand-window

insulation-in-new-bathroom-flat-roof

insulation-in-new-bathroom-flat-roof

insulation-in-new-bathroom-flat-roof-picture-2

insulation-in-new-bathroom-flat-roof-picture-2

Day 72 – Tuesday 18th October 2016

Day 72 – Tuesday 18th October 2016

beginning-of-celotex-insulation-between-roof-and-beams-in-utility-room-cut-around-extractor

beginning-of-celotex-insulation-between-roof-and-beams-in-utility-room-cut-around-extractor

plaster-board-for-walls-and-insulation-for-ceiling-has-been-delivered

plaster-board-for-walls-and-insulation-for-ceiling-has-been-delivered

wiring-for-floor-plug-socket-in-new-kitchen

wiring-for-floor-plug-socket-in-new-kitchen

roof-over-back-of-kitchen-nearly-complete-resized

roof-over-back-of-kitchen-nearly-complete

wire-for-outside-light-through-back-wall

wire-for-outside-light-through-back-wall

wire-for-outside-light-through-back-wall-on-other-side-of-patio-window

wire-for-outside-light-through-back-wall-on-other-side-of-patio-window

roof-sloping-down-to-flat-roof-nearly-complete

roof-sloping-down-to-flat-roof-nearly-complete

different-view-of-flat-roof-and-tiling-nearly-complete

different-view-of-flat-roof-and-tiling-nearly-complete

Day 67 – Tuesday 11th October 2016

Day 67 – Tuesday 11th October 2016

Lovely day

completed-corner-all-down-roof-to-over-new-back-door

completed-corner-all-down-roof-to-over-new-back-door

completed-corner-all-down-roof-to-over-new-back-door-picture-2

completed-corner-all-down-roof-to-over-new-back-door-picture-2

new-kitchen-roof-sloping-onto-flat-roof-area

new-kitchen-roof-sloping-onto-flat-roof-area

hip-roof-cemented

hip-roof-cemented

electrician-at-work-in-kitchen

electrician-at-work-in-kitchen

electricians-work-so-far-installing-electricity-and-plug-sockets-in-new-kitchen

electricians-work-so-far-installing-electricity-and-plug-sockets-in-new-kitchen

showing-wiring-coming-over-the-top-of-the-wall-into-the-new-kitchen-from-scaffolding-level

showing-wiring-coming-over-the-top-of-the-wall-into-the-new-kitchen-from-scaffolding-level

new-sockets-in-kitchen

new-sockets-in-kitchen

new-box-for-plug-socket

new-box-for-plug-socket

cable-coming-down-for-sky-aerial-and-power-for-tv

cable-coming-down-for-sky-aerial-and-power-for-tv

wiring-coming-over-wall-in-new-kitchen

wiring-coming-over-wall-in-new-kitchen

wiring-for-plug

wiring-for-plug and switch

wiring-in-kitchen

wiring-in-kitchen

Day 66 – Monday 10th October 2016

Day 66 – Monday 10th October 2016

Progress on roof

the-roof-so-far-at-the-back-of-house-over-new-kitchen

the-roof-so-far-at-the-back-of-house-over-new-kitchen

corner-of-roof-adjacent-to-garage-and-sloping-onto-flat-roof

corner-of-roof-adjacent-to-garage-and-sloping-onto-flat-roof

corner-of-roof-adjacent-to-garage-and-sloping-onto-flat-roof-cemented-in

corner-of-roof-adjacent-to-garage-and-sloping-onto-flat-roof-cemented-in

new-and-old-corner-rosemary-tiles-the-old-ones-are-much-smaller-and-have-a-shallower-curve

new-and-old-corner-rosemary-tiles-the-old-ones-are-much-smaller-and-have-a-shallower-curve

new-kitchen-roof-sloping-to-flat-roof

new-kitchen-roof-sloping-to-flat-roof

 

Day 65 – Friday 7th October 2016

Day 65 – Friday 7th October 2016

Progress of tiling on new roof

roof-tiling-progress-adjacent-to-flat-roof

roof-tiling-progress-adjacent-to-flat-roof

roof-tiling-progress-adjacent-to-flat-roof-picture-2

roof-tiling-progress-adjacent-to-flat-roof-picture-2

roof-tiling-showing-progress-of-tiling-at-back-of-kitchen-roof

roof-tiling-showing-progress-of-tiling-at-back-of-kitchen-roof

roof-tiling-along-side-of-roof-adjacent-to-garage

roof-tiling-along-side-of-roof-adjacent-to-garage

inspection-of-work

inspection-of-work

lead-valley-down-side-of-hip-roof

lead-valley-down-side-of-hip-roof

lead-valley-down-left-side-of-hip-roof

lead-valley-down-left-side-of-hip-roof

progress-on-tiling-7-10-16

progress-on-tiling-7-10-16

Day 40 – Tuesday 6th September 2016

Day 40 – Tuesday 6th September 2016

Main steps are really taking shape now. Also felt and battening on the roof began.

main-steps-now-back-filled-and-with-concrete

Main-steps-now-back-filled-and-with-concrete

main-steps-filled-with-concrete-and-view-up-to-roof-where-felt-and-batoning-has-begun

Main-steps-filled-with-concrete-and-view-up-to-roof-where-felt-and-battening-has-begun

main-steps-and-roof-view-progress-so-far

Main-steps-and-roof-view-progress-so-far

Also the builder collected fibre glass coated board for part of the flat roof that will eventually be over new utility room and new bathroom.