Tag Archives: electrician

Day 170 – Monday 6th March 2017 – phase 2

Day 170 – Monday 6th March 2017 – phase 2

Wooden beam framework in old porch area to create a new floor which will be level with the old hall dining room.

Wooden beam framework in old porch area to create a new floor which will be level with the old hall dining room.

wallpaper still to be stripped off on this side of new sun lounge

wallpaper still to be stripped off on this side of new sun lounge

View towards the old porch, this room will be the new sun lounge, old red paint from years gone by

View towards the old porch, this room will be the new sun lounge, old red paint from years gone by

Old hallway now being stripped of old wallpaper and walls being levelled for plaster skimming

Old hallway now being stripped of old wallpaper and walls being levelled for plaster skimming. Lighter shade of plaster shows where a door has been at some time in the past

New framework to raise up floor in the old porch

New framework to raise up floor in the old porch

plastering in the new study - wires visible from Joe's electrical work for plug socket and Pipes for radiators that Marcus is fitting

plastering in the new study – wires visible from Joe’s electrical work for plug socket and Pipes for radiators that Marcus is fitting

plastering in the new study pic 2

plastering in the new study pic 2

plastering in the new study around the velux window

plastering in the new study around the velux window

plastering in the new study around the newly created cupboard

plastering in the new study around the newly created cupboard

Day 149 – Monday 6th February 2017 – phase 1 – kitchen

Day 149 – Monday 6th February 2017 – phase 1 – kitchen

new-under-cupboard-unit-lighting-in-new-kitchen-cooker-hob-still-to-be-connected-to-the-gas

New under kitchen unit lighting. Kitchen cooker hob still to be connected to the gas supply. Our electrician came up trumps with the lighting! So pleased with it – it is so smart! All electrical work in the kitchen completed by Ballan Electrical Ltd. First Class job!

new-under-cupboard-unit-lighting-in-new-kitchen

new-under-cupboard-unit-lighting-in-new-kitchen

new-under-cupboard-unit-lighting

new-under-cupboard-unit-lighting –  Kitchen not quite completed  – More photos soon

Day 139 – Tuesday 24th January 2017 – phase 2

Day 139 – Tuesday 24th January 2017 – phase 2

Electrician today alongside the builders preparing wiring that will be under the flooring.

upstairs-area-being-prepared-by-electrician-for-new-wiring-for-the-downstairs-hall-area-also-old-chimney-area-clearly-visible-in-the-sloping-roof-this-will-become-a-dormer-window

upstairs-area-being-prepared-by-electrician-for-new-wiring-for-the-downstairs-hall-area-also-old-chimney-area-clearly-visible-in-the-sloping-roof-this-will-become-a-dormer-window

closer-view-of-holes-in-beams-drilled-for-wiring-also-closer-view-of-the-thick-beams

closer-view-of-holes-in-beams-drilled-for-wiring-also-closer-view-of-the-thick-beams

noggins-of-wood-screwed-in-between-beams-to-strengthen-the-floor-structure

noggins-of-wood-screwed-in-between-beams-to-strengthen-the-floor-structure

view-of-the-opening-for-the-staircase-and-the-other-side-of-the-house-which-will-have-a-small-study

view-of-the-opening-for-the-staircase-and-the-other-side-of-the-house-which-will-have-a-small-study

view-of-the-old-balcony-window-and-new-beams

view-of-the-old-balcony-window-and-new-beams

thick-beams-in-place-over-new-downstairs-hall

thick-beams-in-place-over-new-downstairs-hall

flooring-delivered-and-ready-for-installation-in-the-new-upstairs

flooring-delivered-and-ready-for-installation-in-the-new-upstairs

celotex-insulation-delivered-and-ready-to-install-in-new-upstairs

celotex-insulation-delivered-and-ready-to-install-in-new-upstairs

Day 132 -Tuesday 17th January 2017 – phase 2

Day 132 -Tuesday 17th January 2017 – phase 2

Tile removal today, on both sides of the house and middle parts, supervised by the bat licenced ecologists as we have a potential for bats.  On an earlier survey we were told we must have a bat licence as transitionary bats were spotted.  No bats or evidence of bats was found.  Electrician also at work today in the roof space, sorting out wiring, a major task.

tile-removal

tile removal today under the supervision of the bat licenced ecologists

roof-tiles-being-removed-one-by-one-and-inspected-for-bats-by-a-bat-lisenced-ecologist-as-per-our-planning-permission

roof-tiles-being-removed-one-by-one-and-inspected-for-bats-by-a-bat-licenced-ecologist-as-per-our-planning-permission

bat-licenced-ecologist-inspect-tiles-as-they-are-removed-as-par-our-planning-permission-states-as-we-have-potential-for-transitionary-bats

bat-licenced-ecologist-inspect-tiles-as-they-are-removed-as-per-our-planning-permission-states-as-we-have-potential-for transitionary bats

tiles-removed

tiles-removed

tiles-stripped-back

tiles-stripped-back

tiles-stripped-back-pic-2

tiles-stripped-back-pic-2

rotten-wooden-beam-removed

rotten-wooden-beam-removed

small-supporting-beams-in-place-across-porch

small-supporting-beams-in-place-across-porch

view-of-supporting-beams-from-right-side-of-house

view-of-supporting-beams-from-right-side-of-house

left-side-of-house-17-1-17

left-side-of-house-17-1-17 protected from weather until canopy goes on

left-side-of-roof

left-side-of-roof  –   Lots of cluster flies found under the tiles, already found hundreds in the attic. No bats found or evidence of bats

 

rockwool-insulation-in-partition-wall

rockwool-insulation-in-partition-wall

wiring-by-electrician-to-be-sorted-out-many-wires-are-now-defunct

wiring-by-electrician-to-be-sorted-out-many-wires-are-now-defunct

extent-of-bedroom-to-be-and-partition-wall

extent-of-bedroom-to-be-and-partition-wall

Day 103 – Sunday 27th November 2016

Day 103 – Sunday 27th November 2016

new-laminate-floor-sample

Close up of laminate for new kitchen floor

tony-laying-the-laminate-flooring

Tony laying the laminate flooring on a layer of underlay

progress-of-laminate-floor

Progress of laminate floor so far

paul-painting-another-coat-to-utility-ceiling

Paul-painting-another-coat-to-utility-ceiling before electrician on Monday

paul-painting-another-coat-to-utility-ceiling-pic-2

Utility area painting

Day 69 – Thursday 13th October 2016

Day 69 – Thursday 13th October 2016

Electrician and builder today

valley-tiles-all-cut

valley-tiles-all-cut

tiles-down-valley-all-neatly-cut

tiles-down-valley-all-neatly-cut

wiring-now-fed-through-in-readiness-for-kitchen-lights

wiring-now-fed-through-in-readiness-for-kitchen-lights

wiring-now-fed-through-in-readiness-for-kitchen-lights-picture-2

wiring-now-fed-through-in-readiness-for-kitchen-lights-picture-2

wiring-in-new-bathroom-for-ceiling

wiring-in-new-bathroom-for-ceiling

wiring-in-ceiling-between-new-kitchen-and-utility

wiring-in-ceiling-between-new-kitchen-and-utility

Day 67 – Tuesday 11th October 2016

Day 67 – Tuesday 11th October 2016

Lovely day

completed-corner-all-down-roof-to-over-new-back-door

completed-corner-all-down-roof-to-over-new-back-door

completed-corner-all-down-roof-to-over-new-back-door-picture-2

completed-corner-all-down-roof-to-over-new-back-door-picture-2

new-kitchen-roof-sloping-onto-flat-roof-area

new-kitchen-roof-sloping-onto-flat-roof-area

hip-roof-cemented

hip-roof-cemented

electrician-at-work-in-kitchen

electrician-at-work-in-kitchen

electricians-work-so-far-installing-electricity-and-plug-sockets-in-new-kitchen

electricians-work-so-far-installing-electricity-and-plug-sockets-in-new-kitchen

showing-wiring-coming-over-the-top-of-the-wall-into-the-new-kitchen-from-scaffolding-level

showing-wiring-coming-over-the-top-of-the-wall-into-the-new-kitchen-from-scaffolding-level

new-sockets-in-kitchen

new-sockets-in-kitchen

new-box-for-plug-socket

new-box-for-plug-socket

cable-coming-down-for-sky-aerial-and-power-for-tv

cable-coming-down-for-sky-aerial-and-power-for-tv

wiring-coming-over-wall-in-new-kitchen

wiring-coming-over-wall-in-new-kitchen

wiring-for-plug

wiring-for-plug and switch

wiring-in-kitchen

wiring-in-kitchen

Day 64 – Thursday 6th October 2016

Day 64 – Thursday 6th October 2016

Electrician today

electrician-came-today-and-started-wiring-kitchen

electrician-came-today-and-started-wiring-kitchen

wiring-for-cooker-and-sockets-above-work-top-eventually

wiring-for-cooker-and-sockets-above-work-top-eventually in this position

wiring-for-fridge

wiring-for-fridge

wiring-in-corner-of-kitchen-new-hall-door-will-be-located-to-the-left-of-this

wiring-in-corner-of-kitchen-new-hall-door-will-be-located-to-the-left-of-this

Outside work continues with the tiling of the new roof

hip-roof-tiled-and-lead-in-valley