Day 170 – Monday 6th March 2017 – phase 2

Day 170 – Monday 6th March 2017 – phase 2

Wooden beam framework in old porch area to create a new floor which will be level with the old hall dining room.

Wooden beam framework in old porch area to create a new floor which will be level with the old hall dining room.

wallpaper still to be stripped off on this side of new sun lounge

wallpaper still to be stripped off on this side of new sun lounge

View towards the old porch, this room will be the new sun lounge, old red paint from years gone by

View towards the old porch, this room will be the new sun lounge, old red paint from years gone by

Old hallway now being stripped of old wallpaper and walls being levelled for plaster skimming

Old hallway now being stripped of old wallpaper and walls being levelled for plaster skimming. Lighter shade of plaster shows where a door has been at some time in the past

New framework to raise up floor in the old porch

New framework to raise up floor in the old porch

plastering in the new study - wires visible from Joe's electrical work for plug socket and Pipes for radiators that Marcus is fitting

plastering in the new study – wires visible from Joe’s electrical work for plug socket and Pipes for radiators that Marcus is fitting

plastering in the new study pic 2

plastering in the new study pic 2

plastering in the new study around the velux window

plastering in the new study around the velux window

plastering in the new study around the newly created cupboard

plastering in the new study around the newly created cupboard

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s