Day 97 – Monday 21st November 2016

Day 97 – Monday 21st November 2016

So wet today – torrential rain all day

Plasterer was off sick and rain stopped play on the wall outside for the builder.

Some architraves around doorways were fixed on and husband started stripping wallpaper in the old bedroom which is now a bathroom.

architraves-around-doorway

architraves-around-doorway

removing-wallpaper

Removing old wallpaper

Day 95 – Thursday 17th November 2016

Day 95 – Thursday 17th November 2016

large-wall-adjacent-to-main-bedroom-now-plastered

large-wall-adjacent-to-main-bedroom-now-plastered

large-wall-adjacent-to-main-bedroom-now-plastered-pic-2

large-wall-adjacent-to-main-bedroom-now-plastered-pic-2

plasterers-van

Plasterer’s van

sloping-ceiling-to-new-kitchen-plastered

sloping-ceiling-to-new-kitchen-plastered

utility-room-ceiling-plastered

utility-room-ceiling-plastered

new-bathroom-ceiling-partly-plastered

new-bathroom-ceiling-partly-plastered

Day 94 – Wednesday 16th November 2016

Day 94 – Wednesday 16th November 2016

Plasterer in new kitchen today

plastering-along-back-wall-of-kitchen-adjacent-to-2-doorways

Plastering along the back wall of the kitchen adjacent to the two doorways

plastering-along-wall-adjacent-to-garage

Plastering along the wall adjacent to the garage. All the kitchen units are planned for this area

plastering-along-wall-where-fridge-freezer-will-sit-hence-high-plug-sockets-easy-to-turn-on-and-off-for-defrosting

plastering-along-wall-where-fridge-freezer-will-sit-hence-high-plug-sockets-easy-to-turn-on-and-off-for-defrosting

plastering-on-right-hand-side-of-patio-doors

plastering-on-right-hand-side-of-patio-doors

ceiling-plastered-between-2-doorways

ceiling-plastered-between-2-doorways

Day 93 – Tuesday 15th November 2016

Day 93 – Tuesday 15th November 2016

Then and Now

block-wall-between-bedroom-and-new-kitchen-window-will-be-removed-next-week

28th September this is what the wall looked like!

new-kitchen-with-dot-and-dab-plaster-board-all-finished-ready-for-plasterer

Today 15th November wall looks like this New Kitchen wall finished with dot and dab plaster board technique, ready for plasterer

Installation of block and beam 6

Window to left of wheel barrow is now the doorway in the next picture. This photo taken on 26th July 2016.

new-doorway-into-hall-plasterboarded-ready-for-plasterer

New doorway into main house, with frame and plasterboard surround ready for plasterer.  This was the small window in the photo above.

old-window-position-from-main-bedroom-to-outside-now-bricked-up-new-kitchen-on-the-other-side-see-picture-1-above

old-window-position-from-main-bedroom-to-outside-now-bricked-up-new-kitchen-on-the-other-side

What it used to look like below

View from bedroom

Before being bricked up – 29th August 2016