Day 109 – Saturday 3rd December 2016

patio-with-slabs-cut-ready-to-be-secured

inside-of-hip-roof-now-painted-twice

bathroom-ceiling-now-painted-for-a-3rd-time

patio-with-slabs-cut-ready-to-be-secured

inside-of-hip-roof-now-painted-twice

bathroom-ceiling-now-painted-for-a-3rd-time

steps-up-to-patio-from-new-patio-area-taking-shape

another-view-of-step-progress-up-to-patio

new-bedroom-plastered-now-drying-out

new-bedroom-plastered-now-drying-out-pic-3

new-bedroom-plastered-now-drying-out-pic-2

wills-helping-out-drying-the-plaster-on-ceiling-ready-for-painting

new-kitchen-with-1st-coat-of-paint-on-ceiling

painted-kitchen-another-coat-to-go

kitchen-with-another-coat-of-paint

hip-roof-plaster-now-drying-out

laminate-flooring-for-kitchen-delivered
Plastering and outside work on new patio

Back of new kitchen and Bedroom – scaling all levelled

walkway-between-garage-and-new-kitchen-stones-laid-to-form-a-ramp

plaster-repaired-around-new-doorway-entrance-to-kitchen-from-corridor

ceiling-in-new-bathroom-now-totally-replastered

new-small-bedroom-converted-from-sauna-last-year-walls-prepared-and-patched-ready-for-skim-coat-of-plaster

new-small-bedroom blurred-picture-no-light-walls-prepared-for-plastering

hip-roof-area-plastered-inside

new-kitchen-ceiling-plaster-starting-to-dry-out-slowly

utility-area-ceiling-painted

utility-area-wall-and-ceiling-painted
So wet today – torrential rain all day
Plasterer was off sick and rain stopped play on the wall outside for the builder.
Some architraves around doorways were fixed on and husband started stripping wallpaper in the old bedroom which is now a bathroom.

architraves-around-doorway

Removing old wallpaper
Wall beside patio – preparation and rebuild of existing wall. Also plastering progress in new bathroom and kitchen.

bathroom-plastering

bathroom-plastering-2

sloping-ceiling-to-new-kitchen

plaster-around-ceiling-in-new-kitchen

Rebuild of old wall in front of patio

Old wall merges into new

Five steps are to be constructed here up to patio

New step built into new bathroom

plasterboard-and-plastering-around-new-doorway-into-new-bathroom

kitchen-at-present

Made Cotswold Crunch bread whilst waiting for the plumber!

Plasterboarding in new bathroom – old beam boxed in

plasterboarding-new-bathroom-beam-boxed-in

plasterboarding-in-utility

new-bathroom-plasterboarding-double-in-places-to-fill-gaps

new-bathroom-plasterboarding

new-door-frame-around-new-bathroom-door-picture-2

new-door-frame-around-new-bathroom-door

new-door-frame-around-new-kitchen-door-top-of-steps
Plumber today, connecting up pipework under the house.

New drainage pipe for a sink in the utility room and hot and cold water pipes

In new bathroom the pipes-for-towel-rail-capped

pipework-in-place-for-new-bath-in-bathroom

old-radiator-in-utility-reconnected-now-re-routed-under-house

pipework-through-wall-to-new-kitchen

pipework-for-radiator-under-the-window-in-the-new-kitchen-capped

pipework-capped-ready-for-large-radiator-in-new-kitchen-this-blockwork-was-the-old-small-bedroom-window
Insulation, insulation, insulation

insulation-in-new-kitchen-roof-going-in

insulation-in-new-kitchen-roof-at-back-of-kitchen-sloping-roof

insulation-in-new-kitchen-roof-on-sloping-roof-over-left-hand-window

insulation-in-new-kitchen-roof-on-sloping-roof-over-right-hand-window

insulation-in-new-bathroom-flat-roof

insulation-in-new-bathroom-flat-roof-picture-2