Day 108 – Friday 2nd December 2016

steps-to-patio-slabs-cut-and-laid-waiting-to-be-fixed-when-weather-is-above-freezing

slabs-cut-for-patio-indian-sandstone-all-vary-in-colour-creating-a-patterned-effect

steps-to-patio-slabs-cut-and-laid-waiting-to-be-fixed-when-weather-is-above-freezing

slabs-cut-for-patio-indian-sandstone-all-vary-in-colour-creating-a-patterned-effect

We have lights! In new kitchen

new-lights-in-kitchen-pic-3

new-lights-in-kitchen-pic-2

lights-now-connected-in-new-kitchen

lights-in-utility-room-this-is-a-great-light-has-an-occupancy-sensor-so-light-comes-on-immediately-on-entering-from-which-ever-of-the-4-doors-you-come-through

Steps with Indian Sandstone slabs placed on- all have been cut to size today but too-cold-for-laying

Steps with -Indian-sandstone-slabs, cut today, up the new side-steps-to-main-patio

view-from-main-patio-along-back-of-house-slabs-cut-ready-for-laying

slabs-cut-at-side-of-house

some-of-16-lights-installed-in-kitchen-ceiling
Temperatures below zero today, -5C. No work on the wall, steps or slabs. Tap outside frozen. New little bedroom painted with first coat of paint over newly plastered walls.

base-for-new-step-beside-kitchen-window-no-work-on-it-today-due-to-temps-below-zero-5-c-this-morning

new-small-bedroom-with-first-coat-of-paint
Electrician in today wiring up all sockets in the kitchen ready for the power switch on, later this week! Also builder finishing brick work on steps to main patio.

brickwork-for-steps-up-to-main-patio-now-finished-new-indian-sandstone-slabs-to-be-put-on

steps-beside-side-kitchen-window-base-prepared-and-protected-from-frost

new-plug-sockets-in-small-bedroom-prepared-no-electrics-in-here-before-as-this-was-a-bathroom

plug-sockets-wired-up-in-small-bedroom-after-plastering

Close up of laminate for new kitchen floor

Tony laying the laminate flooring on a layer of underlay

Progress of laminate floor so far

Paul-painting-another-coat-to-utility-ceiling before electrician on Monday

Utility area painting
Kitchen delivered! Painting continues and the first internal door is fitted!

The kitchen has arrived all the way from Hull

Wrens Kitchens

Delivery vehicle just about got up the driveway. Had to back up the road

kitchen-delivery-from-wrens

kitchen-delivery

Kitchen in Kitchen!

The first internal door to be fitted from new kitchen to hallway.

steps-up-to-patio-from-new-patio-area-taking-shape

another-view-of-step-progress-up-to-patio

new-bedroom-plastered-now-drying-out

new-bedroom-plastered-now-drying-out-pic-3

new-bedroom-plastered-now-drying-out-pic-2

wills-helping-out-drying-the-plaster-on-ceiling-ready-for-painting

new-kitchen-with-1st-coat-of-paint-on-ceiling

painted-kitchen-another-coat-to-go

kitchen-with-another-coat-of-paint

hip-roof-plaster-now-drying-out

laminate-flooring-for-kitchen-delivered
Plastering and outside work on new patio

Back of new kitchen and Bedroom – scaling all levelled

walkway-between-garage-and-new-kitchen-stones-laid-to-form-a-ramp

plaster-repaired-around-new-doorway-entrance-to-kitchen-from-corridor

ceiling-in-new-bathroom-now-totally-replastered

new-small-bedroom-converted-from-sauna-last-year-walls-prepared-and-patched-ready-for-skim-coat-of-plaster

new-small-bedroom blurred-picture-no-light-walls-prepared-for-plastering

hip-roof-area-plastered-inside

new-kitchen-ceiling-plaster-starting-to-dry-out-slowly

utility-area-ceiling-painted

utility-area-wall-and-ceiling-painted
Amazing pictures of our plasterers on stilts!!!

a-lot-of-workmen-this-morning-builder-2-plasterers-and-guy-to-do-fibre-glass-roof-repair
Quite funny really, had a Viv, a Matt, and a Tom working here today! All names of family members!

plasterers-on-stilts-skimming-the-very-high-ceiling-this-was-amazing

plasterers-at-work-on-stilts

plasterers-at-work-on-stilts-3

plasterers-at-work-on-stilts-2

base-for-steps-laid

bottoming-for-patio-slabs-to-be-laid-on