Day 133 – Wednesday 18th January 2017 – phase 2

Day 133 – Wednesday 18th January 2017 – phase 2

progress-after-day-133-new-wall-going-up-over-new-supporting-beam-at-front-of-house

progress-after-day-133-new-wall-going-up-over-new-supporting-beam-at-front-of-house

front-of-house-so-far-with-new-wall

front-of-house-so-far-with-new-wall

new-wall-over-new-supporting-beam-over-old-porch-roof

new-wall-over-new-supporting-beam-over-old-porch-roof

another-view-of-new-wall-over-old-porch

another-view-of-new-wall-over-old-porch

new-supporting-beam-as-seen-from-right-side-of-scaffolding

new-supporting-beam-as-seen-from-right-side-of-scaffolding

new-wall-over-right-side-of-house-front

new-wall-over-right-side-of-house-front

left-side-of-house-from-scaffolding-showing-new-wall-going-up-over-the-front-of-the-house-on-the-new-support-beam

left-side-of-house-from-scaffolding-showing-new-wall-going-up-over-the-front-of-the-house-on-the-new-support-beam

left-side-where-tiles-were-removed-yesterday-for-insertion-of-the-large-supporting-steel-next-week

left-side-where-tiles-were-removed-yesterday-for-insertion-of-the-large-supporting-steel-next-week

area-of-roof-where-tiles-were-removed-yesterday-with-bat-ecologists-this-is-where-a-huge-steel-beam-will-be-inserted-into-the-house-for-the-support-of-the-roof-and-the-new-wall-will-be-built-on-top

area-of-roof-where-tiles-were-removed-yesterday-with-bat-ecologists-this-is-where-a-huge-steel-beam-will-be-inserted-into-the-house-for-the-support-of-the-roof-and-the-new-wall-will-be-built-on-top

right-side-of-house-roof

right-side-of-house-roof

top-of-old-balcony-window-just-visible-from-scaffolding

top-of-old-balcony-window-just-visible-from-scaffolding

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area-pic-2

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area-pic-2

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area-pic-3

area-inside-where-roof-beams-have-been-cut-away-at-centre-back-grey-area-pic-3

Day 132 -Tuesday 17th January 2017 – phase 2

Day 132 -Tuesday 17th January 2017 – phase 2

Tile removal today, on both sides of the house and middle parts, supervised by the bat licenced ecologists as we have a potential for bats.  On an earlier survey we were told we must have a bat licence as transitionary bats were spotted.  No bats or evidence of bats was found.  Electrician also at work today in the roof space, sorting out wiring, a major task.

tile-removal

tile removal today under the supervision of the bat licenced ecologists

roof-tiles-being-removed-one-by-one-and-inspected-for-bats-by-a-bat-lisenced-ecologist-as-per-our-planning-permission

roof-tiles-being-removed-one-by-one-and-inspected-for-bats-by-a-bat-licenced-ecologist-as-per-our-planning-permission

bat-licenced-ecologist-inspect-tiles-as-they-are-removed-as-par-our-planning-permission-states-as-we-have-potential-for-transitionary-bats

bat-licenced-ecologist-inspect-tiles-as-they-are-removed-as-per-our-planning-permission-states-as-we-have-potential-for transitionary bats

tiles-removed

tiles-removed

tiles-stripped-back

tiles-stripped-back

tiles-stripped-back-pic-2

tiles-stripped-back-pic-2

rotten-wooden-beam-removed

rotten-wooden-beam-removed

small-supporting-beams-in-place-across-porch

small-supporting-beams-in-place-across-porch

view-of-supporting-beams-from-right-side-of-house

view-of-supporting-beams-from-right-side-of-house

left-side-of-house-17-1-17

left-side-of-house-17-1-17 protected from weather until canopy goes on

left-side-of-roof

left-side-of-roof  –   Lots of cluster flies found under the tiles, already found hundreds in the attic. No bats found or evidence of bats

 

rockwool-insulation-in-partition-wall

rockwool-insulation-in-partition-wall

wiring-by-electrician-to-be-sorted-out-many-wires-are-now-defunct

wiring-by-electrician-to-be-sorted-out-many-wires-are-now-defunct

extent-of-bedroom-to-be-and-partition-wall

extent-of-bedroom-to-be-and-partition-wall

Day 130 – Friday 13th January 2017 – phase 2

Day 130 – Friday 13th January 2017 – phase 2

Warning! A vast amount of scaffolding photos in this post.

scaffolding-delivery

Scaffolding arrived for phase 2

scaffolding-delivery-pic-2

Scaffolding truck

scaffolding-through-the-blinds-in-sitting-room

scaffolding-through-the-blinds-in-sitting-room

the-front-of-springdale-scaffolding-going-up-around-the-front-and-sides

The Front Of Springdale -Scaffolding-going-up-around-the-front-and-sides

c

Scaffolding around house – View from front garden

scaffolding

scaffolding

scaffolding-at-the-side

scaffolding-at-the-side

scaffolding-at-the-right-hand-side

scaffolding-at-the-right-hand-side

side-scaffolding

side-scaffolding

scaffolding-from-outside-along-left-side-of-house

scaffolding-from-outside-along-left-side-of-house

scaffolding-at-right-side-and-satellite-dish

scaffolding-at-right-side-and-satellite-dish

balcony-window-from-outside-not-in-great-condition

balcony-window-from-outside-not-in-great-condition

balcony-window-from-outside-not-in-great-condition-and-tiles-in-poor-state

balcony-window-from-outside-not-in-great-condition-and-tiles-in-poor-state

bottom-scaffolding

bottom-scaffolding

chimney-to-be-removed

chimney-to-be-removed

top-scaffolding-view-towards-fields-over-the-top-of-the-house

top-scaffolding-view-towards-fields-over-the-top-of-the-house

top-scaffolding-view-towards-fields-showing-chimney-that-is-to-be-removed

top-scaffolding-view-towards-fields-showing-chimney-that-is-to-be-removed

view-from-scaffolding-corner-potential-view

view-from-scaffolding-corner-potential-view

view-from-scaffolding

view-from-scaffolding

view-from-top-scaffolding

view-from-top-scaffolding

view-from-top-scaffolding-over-small-garage

view-from-top-scaffolding-over-small-garage

the-beginning-of-the-new-bedroom

the-beginning-of-the-new-bedroom

rock-wool-insulation-in-new-master-bedroom-extension

rockwool-insulation-in-new-master-bedroom-extension

old-chandelier-from-hall-and-old-water-tank-from-attic

old-chandelier-from-hall-and-old-water-tank-from-attic

Day 129 – Thursday 12th January 2017 – Phase 2

Day 129 – Thursday 12th January 2017 – Phase 2

Day 3 only for phase 2, the building of the master bedroom, ensuite and small study.

Progress has been very quick in 3 days.  The balcony and huge vaulted ceiling has been removed, new beams for bedroom floor are in place and gap left for a staircase. Partitioning has started today.

front-of-house-12-1-17

front-of-house-12-1-17 for reference!

c

front-of-house-12-1-17

old-chandelier

old-chandelier

cutting-machinery-for-beams-and-partition-walls

cutting-machinery-for-beams-and-partition-walls

work-above-the-new-beams

work-above-the-new-beams

view-of-new-upstairs

view-of-new-upstairs

view-of-the-work-completed-today-at-new-bedroom-floor-level

view-of-the-work-completed-today-at-new-bedroom-floor-level

partitioning-wall-has-been-partially-completed-on-the-right-this-will-be-the-supporting-beam-for-new-roof

partition-wall-has-been-partially-completed-on-the-right-this-will-be-the-supporting-beam-for-new-roof

view-down-to-the-hall-below

view-down-to-the-hall-below

inspection-going-on

inspection-going-on

walking-the-plank

walking-the-plank

ladders-to-this-level-this-is-where-the-stairs-will-come-up-also-view-of-work-and-new-beams

ladders-to-this-level-this-is-where-the-stairs-will-come-up-also-view-of-work-and-new-beams

Day 128 – Wednesday 11th January 2017 – Phase 2

Day 128 – Wednesday 11th January 2017 – Phase 2

before-beam-removal

Picture of before the old beams from the vaulted structure were removed

after-beam-removal

After the beams were removed from old vaulted structure the roof laths can be seen

new-beams-going-in-for-master-bedroom

New beams going in for the master bedroom

beams-removed-pic-2

beams-removed-pic-2

large-hall-and-attic

Large hall and attic space

new-beams-going-into-place-for-bedroom-rectangular-gap-at-middle-back-of-pic-is-where-the-stairs-will-be-located

new-beams-going-into-place-for-bedroom-rectangular-gap-at-middle-back-of-pic-is-where-the-stairs-will-be-located

bedroom-beams-all-going-into-place

bedroom-beams-all-going-into-place

another-view-of-bedroom-beams

another-view-of-bedroom-beams

scaffolding-in-large-hall-and-cutting-equipment-for-new-beams-for-bedroom

scaffolding-in-large-hall-and-cutting-equipment-for-new-beams-for-bedroom

wood-being-stored-inside-bad-weather-forecast-gap-for-staircase-at-top-of-picture

wood-being-stored-inside-bad-weather-forecast-gap-for-staircase-at-top-of-picture

marcus-plumber-going-under-floor-in-hall-re-routing-water-pipes-under-house-pipes-were-in-attic

marcus-plumber-going-under-floor-in-hall-re-routing-water-pipes-under-house-pipes-were-in-attic

marcus-plumber-going-under-floor-in-hall-re-routing-water-pipes-under-house

Marcus-plumber-going-under-floor-in-hall-re-routing-water-pipes-under-house

Day 127 -Tuesday 10th January 2017 – Phase 2

Day 127 -Tuesday 10th January 2017 – Phase 2

view-of-balcony

view-of-balcony

balcony-balustrade-removed

balcony-balustrade-removed

balcony-railings-removed

balcony-railings-removed

balcony-removed-half-a-beam-left

balcony-removed-half-a-beam-left

wood-from-balcony

wood-from-balcony

ceiling-removed-from-old-vaulted-hallway-2

ceiling-removed-from-old-vaulted-hallway-pic 2

ceiling-removed-from-old-vaulted-hallway-3

ceiling-removed-from-old-vaulted-hallway-pic 3

ceiling-removed-from-old-vaulted-hallway

ceiling-removed-from-old-vaulted-hallway

current-front-of-house-day-124

current-front-of-house-day-127

outside-rubble

outside-rubble

phase-2-curtains-up-for-demolition-of-front-hall-and-balcony-to-create-a-master-bedroom-and-ensuite-and-an-upstairs-study

phase-2-curtains-up-for-demolition-of-front-hall-and-balcony-to-create-a-master-bedroom-and-ensuite-and-an-upstairs-study

remaining-beams-from-old-ceiling-in-hallway

remaining-beams-from-old-ceiling-in-hallway

scaffolding-for-beam-removal

scaffolding-for-beam-removal

rubble-from-hall-ceiling

rubble-from-hall-ceiling

Day 126 – Monday 9th January 2017 – phase 2

Day 126 – Monday 9th January 2017 – phase 2

cleared-hallway-and-balcony-ready-for-new-upstairs

Cleared Hallway And Balcony – Ready For A New Upstairs

balcony-ready-for-removal

Balcony – ready for removal

ballustrade-on-balcony

Balustrade on balcony overlooking hall

view-of-hall-from-balcony

view-of-hall-from-balcony

hallway-ready-for-new-upstairs-extension

hallway-ready-for-new-upstairs-extension

Day 125 – Sunday 8th January 2017 – Phase 2

Day 125 – Sunday 8th January 2017 – Phase 2

Lots of preparation for the start of the new extension.  We applied for planning permission and are now creating an upstairs area to the house. This will become a master bedroom and ensuite bathroom and a small study.  Downstairs in the large hallway which we have used as a sitting room, we would like a sun and TV room.

thomas

How it looked over Christmas

thomas-2

Before phase 2

present-opening

present opening mess!

lizzie

Hall as sitting room

 

removing-carpets-in-preparation-for-an-upstairs-master-bedroom

removing-carpets-in-preparation-for-an-upstairs-master-bedroom

removing-carpets-in-preparation-for-an-upstairs-master-bedroom-2

removing-carpets-in-preparation-for-an-upstairs-master-bedroom picture 2

clearing-the-balcony-ready-for-its-removal

clearing-the-balcony-ready-for-its-removal

underlay-removal

underlay-removal