Day 132 -Tuesday 17th January 2017 – phase 2

Day 132 -Tuesday 17th January 2017 – phase 2

Tile removal today, on both sides of the house and middle parts, supervised by the bat licenced ecologists as we have a potential for bats.  On an earlier survey we were told we must have a bat licence as transitionary bats were spotted.  No bats or evidence of bats was found.  Electrician also at work today in the roof space, sorting out wiring, a major task.

tile-removal

tile removal today under the supervision of the bat licenced ecologists

roof-tiles-being-removed-one-by-one-and-inspected-for-bats-by-a-bat-lisenced-ecologist-as-per-our-planning-permission

roof-tiles-being-removed-one-by-one-and-inspected-for-bats-by-a-bat-licenced-ecologist-as-per-our-planning-permission

bat-licenced-ecologist-inspect-tiles-as-they-are-removed-as-par-our-planning-permission-states-as-we-have-potential-for-transitionary-bats

bat-licenced-ecologist-inspect-tiles-as-they-are-removed-as-per-our-planning-permission-states-as-we-have-potential-for transitionary bats

tiles-removed

tiles-removed

tiles-stripped-back

tiles-stripped-back

tiles-stripped-back-pic-2

tiles-stripped-back-pic-2

rotten-wooden-beam-removed

rotten-wooden-beam-removed

small-supporting-beams-in-place-across-porch

small-supporting-beams-in-place-across-porch

view-of-supporting-beams-from-right-side-of-house

view-of-supporting-beams-from-right-side-of-house

left-side-of-house-17-1-17

left-side-of-house-17-1-17 protected from weather until canopy goes on

left-side-of-roof

left-side-of-roof  –   Lots of cluster flies found under the tiles, already found hundreds in the attic. No bats found or evidence of bats

 

rockwool-insulation-in-partition-wall

rockwool-insulation-in-partition-wall

wiring-by-electrician-to-be-sorted-out-many-wires-are-now-defunct

wiring-by-electrician-to-be-sorted-out-many-wires-are-now-defunct

extent-of-bedroom-to-be-and-partition-wall

extent-of-bedroom-to-be-and-partition-wall

Day 128 – Wednesday 11th January 2017 – Phase 2

Day 128 – Wednesday 11th January 2017 – Phase 2

before-beam-removal

Picture of before the old beams from the vaulted structure were removed

after-beam-removal

After the beams were removed from old vaulted structure the roof laths can be seen

new-beams-going-in-for-master-bedroom

New beams going in for the master bedroom

beams-removed-pic-2

beams-removed-pic-2

large-hall-and-attic

Large hall and attic space

new-beams-going-into-place-for-bedroom-rectangular-gap-at-middle-back-of-pic-is-where-the-stairs-will-be-located

new-beams-going-into-place-for-bedroom-rectangular-gap-at-middle-back-of-pic-is-where-the-stairs-will-be-located

bedroom-beams-all-going-into-place

bedroom-beams-all-going-into-place

another-view-of-bedroom-beams

another-view-of-bedroom-beams

scaffolding-in-large-hall-and-cutting-equipment-for-new-beams-for-bedroom

scaffolding-in-large-hall-and-cutting-equipment-for-new-beams-for-bedroom

wood-being-stored-inside-bad-weather-forecast-gap-for-staircase-at-top-of-picture

wood-being-stored-inside-bad-weather-forecast-gap-for-staircase-at-top-of-picture

marcus-plumber-going-under-floor-in-hall-re-routing-water-pipes-under-house-pipes-were-in-attic

marcus-plumber-going-under-floor-in-hall-re-routing-water-pipes-under-house-pipes-were-in-attic

marcus-plumber-going-under-floor-in-hall-re-routing-water-pipes-under-house

Marcus-plumber-going-under-floor-in-hall-re-routing-water-pipes-under-house

Days 118, 119 and 120 – 14th, 15th, 16th December 2016

Days 118, 119 and 120 – 14th, 15th, 16th December 2016

new-bathroom-wood-floor-laid-first

New family bathroom – Old doorway from old bedroom to hall now plaster boarded over. Then new bathroom floor is laid. First a wooden flooring is laid and marked with a grid.

grid-pattern-marked-out-on-wood-flooring

grid-pattern-marked-out-on-wood-flooring

new-bathroom-wood-screwed-down-in-a-grid-pattern-to-ensure-tiles-will-be-laid-on-a-solid-base

new-bathroom-wood-screwed-down-in-a-grid-pattern-to-ensure-tiles-will-be-laid-on-a-solid-base

new-bath-in-place

New bath in place

close-up-of-tiles-in-new-bathroom

close-up-of-tiles-in-new-bathroom

some-floor-tiles-and-wall-tiles-laid-in-new-bathroom

some-floor-tiles-and-wall-tiles-laid-in-new-bathroom

walkway-up-between-garage-and-new-kitchen-slabs-have-been-jointed-filled-between-each-slab

walkway-up-between-garage-and-new-kitchen-slabs-have-been-jointed-filled-between-each-slab

view-from-main-patio-of-new-patio

view-from-main-patio-of-new-patio

slabs-laid-on-steps-not-cemented-between-slabs-yet

slabs-laid-on-steps-not-cemented-between-slabs-yet

patio-behind-house-now-all-finished-cement-between-slabs-jointing

patio-behind-house-now-all-finished-cement-between-slabs-jointing

Day 106 – Wednesday 30th November 2016

Day 106 – Wednesday 30th November 2016

steps-with-cut-indian-sandstone-slabs-too-cold-for-laying

Steps with Indian Sandstone slabs placed on- all have been cut to size today but too-cold-for-laying

steps-with-cut-indian-sandstone-slabs-side-steps-to-main-patio

Steps with -Indian-sandstone-slabs, cut today, up the new side-steps-to-main-patio

view-from-main-patio-along-back-of-house-slabs-cut-ready-for-laying

view-from-main-patio-along-back-of-house-slabs-cut-ready-for-laying

slabs-cut-at-side-of-house

slabs-cut-at-side-of-house

some-of-16-lights-installed-in-kitchen-ceiling

some-of-16-lights-installed-in-kitchen-ceiling

Day 96 – Friday 18th November 2016

Day 96 – Friday 18th November 2016

Wall beside patio – preparation and rebuild of existing wall.  Also plastering progress in new bathroom and kitchen.

bathroom-plastering

bathroom-plastering

bathroom-plastering-2

bathroom-plastering-2

sloping-ceiling-to-new-kitchen

sloping-ceiling-to-new-kitchen

plaster-around-ceiling-in-new-kitchen

plaster-around-ceiling-in-new-kitchen

wall

Rebuild of old wall in front of patio

wall-3

Old wall merges into new

wall-2

Five steps are to be constructed here up to patio

 

Day 86 – Thursday 3rd November 2016

Day 86 – Thursday 3rd November 2016

new-bathroom-plasterboarding-double-in-places-to-fill-gaps

new-bathroom-plasterboarding-double-in-places-to-fill-gaps

new-bathroom-plasterboarding

new-bathroom-plasterboarding

new-door-frame-around-new-bathroom-door-picture-2

new-door-frame-around-new-bathroom-door-picture-2

new-door-frame-around-new-bathroom-door

new-door-frame-around-new-bathroom-door

new-door-frame-around-new-kitchen-door-top-of-steps

new-door-frame-around-new-kitchen-door-top-of-steps

Day 82 – Saturday 29th October 2016

Day 82 – Saturday 29th October 2016

Plumber today, connecting up pipework under the house.

new-drainage-pipe-for-a-sink-in-the-utility-room

New drainage pipe for a sink in the utility room and hot and cold water pipes

pipes-for-towel-rail-capped

In new bathroom the pipes-for-towel-rail-capped

pipework-in-place-for-new-bath-in-bathroom

pipework-in-place-for-new-bath-in-bathroom

old-radiator-in-utility-reconnected-now-re-routed-under-house

old-radiator-in-utility-reconnected-now-re-routed-under-house

pipework-through-wall-to-new-kitchen

pipework-through-wall-to-new-kitchen

pipework-for-radiator-under-the-window-in-the-new-kitchen-capped

pipework-for-radiator-under-the-window-in-the-new-kitchen-capped

pipework-capped-ready-for-large-radiator-in-new-kitchen-this-blockwork-was-the-old-small-bedroom-window

pipework-capped-ready-for-large-radiator-in-new-kitchen-this-blockwork-was-the-old-small-bedroom-window