Day 90 – Thursday 10th November 2016

blanket-insulation-in-sloping-roof-covered-by-plasterboard

close-up-of-blanket-insulation-above-patio-doors

view-through-new-kitchen-patio-windows-up-the-hillside-lovely-autumnal-day

blanket-insulation-in-sloping-roof-covered-by-plasterboard

close-up-of-blanket-insulation-above-patio-doors

view-through-new-kitchen-patio-windows-up-the-hillside-lovely-autumnal-day

New step built into new bathroom

plasterboard-and-plastering-around-new-doorway-into-new-bathroom

kitchen-at-present

Made Cotswold Crunch bread whilst waiting for the plumber!

new-bathroom-plasterboarding-double-in-places-to-fill-gaps

new-bathroom-plasterboarding

new-door-frame-around-new-bathroom-door-picture-2

new-door-frame-around-new-bathroom-door

new-door-frame-around-new-kitchen-door-top-of-steps

foil-insulation-in-corner-of-kitchen

foil-insulation-in-left-corner-of-kitchen

Holes cut in plasterboard for lighting – lots-of-it!

foil-insulation-going-into-sloping-roof-of-kitchen

foil-insulation-in-kitchen

wiring-holes-in-plasterboard

wiring-through-plasterboard-ceiling

ridge-tiles-nearing-completion
Patio doors for kitchen arrived today

new-patio-doors-in-new-kitchen-from-inside

New patio doors minus the apex window on order fitted by Clive and Chris

new-patio-doors-to-new-kitchen-from-outside

new-patio-doors-to-new-kitchen-from-outside-2

Spot Marcus, our plumber, in a very tight spot, under the floor in the new bathroom

under-the-new-bathroom-floor-where-toilet-and-sink-will-go

drain-and-pipework-under-floor

under-the-new-bathroom-floor-where-bath-will-be-positioned

new-plasterboard-ceiling-in-utility-room

new-plasterboard-ceiling-in-new-bathroom

new-plasterboard-ceiling-in-entrance-to-kitchen-beneath-flat-roof

Progress on the roof – Day 79

close-up-of-roof-progress

Ridge tiles not yet in final position

roof-between-old-and-new-building

roof-between-old-and-new-building-from-step-ladder

roof-between-old-and-new-building-from-step-ladder-2

new-bathroom-pipework-under-floor-boards

new-bathroom-pipework-under-floor-boards-2

new-bathroom-pipework-under-floor-boards-3

new-bathroom-pipework-for-shower
Builder and plumber today

View of progress of House from the back

house-from-back-day-78-pic-2

Progress with the plaster boarding in the kitchen

Plaster boarding in the kitchen

plasterboard-window-sill-in-kitchen

plasterboard-2nd-window-sill-in-kitchen-on-right

positions-for-sink-and-toilet-in-new-bathroom

position-for-radiator

position-for-bath-in-new-bathroom

position-for-toilet-in-new-bathroom

position-for-sink-in-new-bathroom

gas-and-water-pipes-in-utility-room

capped-water-pipes-ready-for-sink

Plaster board is now up on the 10 foot high ceiling. A mobile plasterboard hoist was used to lift it into place

plaster-board-up-on-new-kitchen-ceiling-picture-2-taken-from-front-to-back

plaster-board-on-right-hand-side-of-kitchen

left-hand-side-of-kitchen-showing-new-plaster-board-and-hatch

A damp day today. The view of part of the back garden through the gap for the patio doors.