24th April 2017 – delivery of upstairs bathroom suite

Bathroom suite – some items delivered

Radiators for upstairs
Radiators were not the correct ones – had to be returned

Bathroom suite – some items delivered

Radiators for upstairs
Radiators were not the correct ones – had to be returned

New sun lounge which has been painted over the weekend and Monday, scaffolding was left to use for the very high parts

New sun lounge boarded up at present – front windows awaiting delivery

new sun lounge – view to the back and archway to old kitchen, covered to keep dust out

sun lounge – scaffolding for painting and ladders still the only access to the upstairs

levelled area of floor in sun room

dormer view from front scaffolding

Dormer window with soffits all painted black

Painted soffit boards

Painted soffit boards 2

Painted soffit boards 3

Gable end boards painted black

cladding for side of dormer

Steve and Luke – the builders

View of house from the front – Porch removed

Front porch door and panels removed

front-porch-door-and-panels-removed-pic2

skip-with-the-contents-of-the-front-of-the-porch

New steel beam installed over the front foundation wall to support the new front of house and to ensure there is no sinking

old-porch with new-steel-beam in place

new-steel-beam-to-support-front-of-the-house-over-foundation-wall

porch-from-above

dormer-progress-so-far

side-view-of-dormer-and-insulation

side-view-of-dormer-and-insulation-pic-2

waste-pipe-from-new-ensuite-bathroom

study-with-plasterboard

radiator-pipes-for-new-radiator-under-large-window-in-upstairs-bedroom

plasterboard-delivery-for-new-upstairs

plasterboard-inside-new-bedroom
Delivery of new dual fuel RangeMaster cooker 1100

rangemaster-cooker-delivery-3-1-17

kitchen-3-1-17

kitchen-3-1-17 before delivery of cooker

rangemaster-arrives-3-1-17

rangemaster-132kg

delivery-of-chippings-10-tons-for-bottoming-under-new-patio

delivery-of-chippings-10-tons-for-bottoming-under-new-patio-pic-2

delivery-of-chippings-10-tons-for-bottoming-under-new-patio-pic-3

delivery-of-chippings-10-tons-for-bottoming-under-new-patio-pic-4

delivery-of-chippings-10-tons-for-bottoming-under-new-patio-dumped-on-drive

chippings-used-right-along-the-back-of-the-house-in-preparation-for-new-slabs-being-laid

chippings-used-at-the-back-of-the-kitchen

first-coat-of-paint-over-plaster-in-kitchen-watered-down-so-it-does-nor-flake-when-second-coat-is-applied

first-coat-of-watered-down-paint-applied-but-ceiling-not-plastered-yet-so-no-painting-higher-up

kitchen-painting

painting-at-the-back-of-kitchen
Batons and roofing felt was delivered today.
More work on the retaining wall and steps.

Step area

View from above of the new steps area

Another view of retaining wall

Wall from new patio area

Wall view from side of garage
Delivery of building materials
Foundations are all hardened and ready for building

Blocks all ready for building

Delivery of building materials